Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.
| Date | Price Target | Rating | Analyst |
|---|---|---|---|
| 2/13/2026 | $450.00 | Buy | DA Davidson |
| 1/15/2026 | $360.00 → $410.00 | Buy | Needham |
| 12/8/2025 | $290.00 → $330.00 | Outperform | Bernstein |
| 9/16/2025 | $275.00 → $325.00 | Overweight | Barclays |
| 4/15/2025 | Outperform → Buy | Daiwa Securities | |
| 7/18/2024 | $130.00 → $170.00 | Hold | TD Cowen |
| 7/15/2024 | $168.00 → $210.00 | Buy | Needham |
| 4/18/2024 | $100.00 → $130.00 | Hold | TD Cowen |
6-K - TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD (0001046179) (Filer)
SD - TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD (0001046179) (Filer)
6-K - TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD (0001046179) (Filer)
DA Davidson initiated coverage of Taiwan Semiconductor Manufacturing with a rating of Buy and set a new price target of $450.00
Needham reiterated coverage of Taiwan Semiconductor Manufacturing with a rating of Buy and set a new price target of $410.00 from $360.00 previously
Bernstein reiterated coverage of Taiwan Semiconductor Manufacturing with a rating of Outperform and set a new price target of $330.00 from $290.00 previously
4 - TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD (0001046179) (Issuer)
4 - TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD (0001046179) (Issuer)
4 - TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD (0001046179) (Issuer)
SC 13G/A - TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD (0001046179) (Subject)
This article has been disseminated on behalf of MAX Power Mining Corp. and may include a paid advertisement. AUSTIN, Texas, June 01, 2026 (GLOBE NEWSWIRE) -- AINewsWire Editorial Coverage: Artificial intelligence is no longer constrained by software innovation alone. The next major bottleneck in the global AI race is rapidly becoming electricity, as hyperscale data centers consume power at levels few existing grids were designed to support. According to the International Energy Agency, worldwide data-center electricity consumption is projected to roughly double by 2030 to approximately 945 terawatt-hours, while AI-optimized data centers could more than quadruple their power consumption
TORONTO, April 30, 2026 (GLOBE NEWSWIRE) -- Northland Power Inc. ("Northland") (TSX: NPI) today announced the signing of a long-term Corporate Power Purchase Agreement ("CPPA") with Taiwan Semiconductor Manufacturing Company ("TSMC") for additional power from its Hai Long offshore wind project in Taiwan ("Hai Long" or the "Project"). The Hai Long Project is being constructed by Northland (30.6%) jointly with Mitsui & Co. (40%) and Gentari International Renewables Pte. Ltd (29.4%). The project is located approximately 45 – 70 kilometers off the Changhua coast in the Taiwan Strait and consists of three offshore wind sites, the 294-megawatt (MW) Hai Long 2A, the 224 MW Hai Long 2B, and the 5
TSMC ((TWSE: 2330, NYSE:TSM) today filed its 2025 annual report on Form 20-F with the U.S. Securities and Exchange Commission. The report is available at https://investor.tsmc.com/english/sec-filings. Hard copies of the report are also available, free of charge, upon email request to p_sec_service@tsmc.com. About TSMC TSMC pioneered the pure-play foundry business model when it was founded in 1987, and has been the world's leading dedicated semiconductor foundry ever since. The Company supports a thriving ecosystem of global customers and partners with the industry's leading process technologies and portfolio of design enablement solutions to unleash innovation for the global semicondu
3 - TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD (0001046179) (Issuer)
3 - TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD (0001046179) (Issuer)
3 - TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD (0001046179) (Issuer)