• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Frontier Power USA Selects 400 MWh Wildfire BESS Project from Bimergen Energy, Bringing Closed and Selected Eos-Backed Project Capacity to 1.8 GWh

    7/14/26 8:30:00 AM ET
    $BESS
    $EOSE
    Electric Utilities: Central
    Utilities
    Industrial Machinery/Components
    Miscellaneous
    Get the next $BESS alert in real time by email

    NEW YORK and NEWPORT BEACH, Calif., July 14, 2026 (GLOBE NEWSWIRE) -- Frontier Power USA ("FPUSA" or the "Company"), a long-duration energy storage development and investment platform, and Bimergen Energy Corporation (NYSE:BESS) ("Bimergen"), a U.S. energy infrastructure developer, today announced that FPUSA has selected the Wildfire BESS Project, a 100 MW / 400 MWh battery energy storage project located in Caldwell County, Texas. The project has been selected for conversion onto the FPUSA platform under the parties’ existing strategic framework, is expected to utilize Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos") Z3 long-duration batteries, and closing remains contingent upon the negotiation and execution of definitive documentation and the successful closing of Eos’s recently announced rights offering.

    The Wildfire selection follows FPUSA’s previously announced conversion of a 480 MWh portfolio of ERCOT-based projects from the Bimergen portfolio and FPUSA’s selection of four projects representing approximately 920 MWh under its strategic framework with Stella Energy Solutions. Together, the closed and selected projects represent approximately 1.8 GWh of battery energy storage capacity. That total equals approximately 90% of FPUSA’s 2 GWh capacity reservation agreement with Eos.

    The transaction is expected to be documented on economic terms consistent with the previously completed Bimergen portfolio transaction.

    The Company’s closed and selected project portfolio is focused on projects targeting near-term notice-to-proceed milestones in 2026 and early 2027, supporting FPUSA’s objective of converting late-stage development opportunities into construction-ready assets on an accelerated schedule.

    Execution Against the 2 GWh Capacity Reservation Agreement

    FPUSA was formed to accelerate deployment of utility-scale, long-duration battery storage infrastructure by integrating development, committed manufacturing capacity, institutional capital, project financing and insured performance under a single platform. The Company’s 2 GWh capacity reservation agreement with Eos is intended to provide dedicated access to American-made long-duration battery supply and support execution certainty across FPUSA’s late-stage project pipeline.

    Since announcing the platform, FPUSA has advanced three asset portfolios toward deployment:

    StatusCounterparty / FrameworkProjectsCapacity
    Closed / convertedBimergenInitial ERCOT portfolio, including two Texas 10 projects and Redbird480 MWh
    SelectedStellaBlanquilla, Aransas Pass, Nash and Wallis920 MWh
    SelectedBimergenWildfire BESS Project400 MWh
    Total closed or selected1,800 MWh
    Capacity reservation agreement with Eos2,000 MWh



    The initial Bimergen portfolio represented FPUSA’s first completed conversion from its exclusive project pipeline and the initial deployment under the Eos capacity reservation agreement. That transaction covered a 480 MWh portfolio comprising three ERCOT-based projects, including two "Texas 10" projects and the 100 MW / 400 MWh Redbird project.

    The Stella project selection represented the first projects to advance under FPUSA’s strategic framework with Stella, covering four projects totaling approximately 230 MW / 920 MWh of battery storage capacity. Those projects were selected for conversion onto the FPUSA platform and are expected to utilize Eos Z3 long-duration batteries.

    The Wildfire selection adds a further 100 MW / 400 MWh project in ERCOT and reflects continued execution of FPUSA’s strategy to identify, select and convert late-stage storage projects that can use FPUSA’s reserved Eos manufacturing capacity.

    In addition, FPUSA has visibility on approximately 4 GWh of near-term pipeline opportunities across multiple markets. To the extent FPUSA is able to convert or select additional projects from that pipeline, the Company would look to increase the capacity available under its capacity reservation agreement with Eos to support continued platform growth.

    FPUSA Capitalization and Project Financing

    FPUSA’s equity capital base is anchored by the previously announced commitment from funds and accounts managed by Cerberus Capital Management and is expected to be further supported by the investment from Hudson Bay Capital and proceeds from the Eos rights offering.

    Hudson Bay’s commitment includes a $50 million direct equity commitment into FPUSA, subject to certain conditions, as part of a broader $125 million Hudson Bay commitment in support of the Company. The remaining $75 million comprises an investment by Hudson Bay into Eos to support Eos’s investment in FPUSA.

    FPUSA is also working with KKR Capital Markets LLC under its engagement to support the structuring of long-term project financing across the platform. That engagement is targeting investment-grade financing solutions and is intended to support a comprehensive financing framework across bank and institutional markets, including construction financing, tax credit-related financings and long-term project finance solutions, and to help establish a repeatable capital structure for FPUSA’s selected project portfolio.

    "Wildfire is another important step in the execution of the FPUSA platform," said Aaron Maczonis, Managing Director at Cerberus Capital Management. "With this selection, FPUSA has now closed or selected approximately 1.8 GWh of projects against its 2 GWh capacity reservation agreement with Eos. That is real progress against the core strategy: securing high-quality late-stage projects, aligning them with committed American-made battery supply, and converting them into construction-ready assets through a platform built for speed, financing certainty and scale. Bimergen has been an important origination and development partner, and we look forward to completing definitive documentation and advancing Wildfire toward NTP."

    "Wildfire reflects the depth of Bimergen’s development work in ERCOT," said Cole Johnson, Co-CEO of Bimergen Energy. "This is our second transaction under the framework with FPUSA, and it shows how the model is designed to work: Bimergen originates and develops late-stage projects, and the platform converts them into construction-ready assets with committed American-made battery supply and institutional capital behind them. We look forward to completing documentation and moving Wildfire toward construction."

    About Frontier Power USA

    FPUSA is a long-duration energy storage development and investment platform focused on accelerating the deployment of utility-scale battery infrastructure across the United States. Formed through an anchor investment by funds and accounts managed by Cerberus, the platform integrates development, committed manufacturing capacity, institutional capital, project financing and insured performance under a single banner, allowing development-stage pipelines to convert into construction-ready assets and compressing the time from project commitment to commercial operation. Learn more at frontierpowerusa.com.

    About Bimergen Energy Corporation

    Bimergen Energy Corporation (NYSE:BESS) is a U.S.-based renewable energy developer, asset owner and independent power provider focused on utility-scale battery energy storage systems and solar projects. Bimergen develops and operates infrastructure designed to enhance grid stability and support the integration of renewable generation across key U.S. markets, maintaining a diversified pipeline and partnering with institutional capital providers to advance projects through construction and long-term operation. Learn more at Bimergen.com.

    About Eos Energy Enterprises

    Eos Energy Enterprises, Inc. (NASDAQ:EOSE) is accelerating the shift to American energy independence with energy storage solutions that transform how the world stores power. Eos’s BESS features the company’s Znyth™ technology, a proven chemistry with readily available, non-precious-earth components, designed for utility-scale, microgrid, commercial and industrial long-duration energy storage applications. Learn more at eose.com.

    Contact

    support@frontierpowerusa.com

    Forward-Looking Statements

    Except for historical information, the matters set forth in this press release are "forward-looking statements" within the meaning of the safe harbor provisions of the Private Securities Litigation Reform Act of 1995, including statements regarding the selection and expected conversion of the Wildfire project, the negotiation and execution of definitive documentation, the expected use of Eos Z3 batteries, the Eos rights offering, the Cerberus and Hudson Bay investments, project financing efforts, and FPUSA’s project pipeline and capacity reservation agreement. These statements are based on current expectations and assumptions and are subject to risks and uncertainties that could cause actual results to differ materially, including the risk that definitive documentation is not executed, that the rights offering does not close, and that projects do not reach notice to proceed or commercial operation on the anticipated timeline or at all, as well as the risk factors described in Eos’s and Bimergen’s filings with the Securities and Exchange Commission. None of FPUSA, Bimergen or Eos undertakes any obligation to update forward-looking statements except as required by law. This press release does not constitute an offer to sell or a solicitation of an offer to buy any securities. The rights offering is being made only by means of the applicable prospectus filed with the SEC.



    Primary Logo

    Get the next $BESS alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $BESS
    $EOSE

    CompanyDatePrice TargetRatingAnalyst
    Eos Energy Enterprises Inc.
    $EOSE
    7/14/2026$7.00Buy
    Truist
    Eos Energy Enterprises Inc.
    $EOSE
    5/22/2026$11.00Buy
    Needham
    Eos Energy Enterprises Inc.
    $EOSE
    5/14/2026$7.00 → $8.00Hold
    TD Cowen
    Eos Energy Enterprises Inc.
    $EOSE
    2/27/2026$20.00Buy → Neutral
    Guggenheim
    Eos Energy Enterprises Inc.
    $EOSE
    12/17/2025$16.00Neutral
    Analyst
    Eos Energy Enterprises Inc.
    $EOSE
    9/5/2025$6.50Hold
    Jefferies
    Eos Energy Enterprises Inc.
    $EOSE
    8/1/2025$5.50 → $6.00Hold
    TD Cowen
    Eos Energy Enterprises Inc.
    $EOSE
    2/20/2025$4.00 → $5.00Buy → Neutral
    ROTH MKM
    More analyst ratings

    $BESS
    $EOSE
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Truist initiated coverage on Eos Energy with a new price target

    Truist initiated coverage of Eos Energy with a rating of Buy and set a new price target of $7.00

    7/14/26 9:03:58 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Needham initiated coverage on Eos Energy with a new price target

    Needham initiated coverage of Eos Energy with a rating of Buy and set a new price target of $11.00

    5/22/26 8:37:44 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    TD Cowen reiterated coverage on Eos Energy with a new price target

    TD Cowen reiterated coverage of Eos Energy with a rating of Hold and set a new price target of $8.00 from $7.00 previously

    5/14/26 7:59:24 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $BESS
    $EOSE
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    SEC Form 4 filed by Director Song Haiyan

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    7/15/26 5:01:36 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    SEC Form 4 filed by Chief Legal Officer Martin Marie Batz

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    7/15/26 4:57:49 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    SEC Form 3 filed by new insider Song Haiyan

    3 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    7/15/26 4:54:59 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $BESS
    $EOSE
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Director Urban David bought $100,100 worth of shares (16,250 units at $6.16), increasing direct ownership by 35% to 62,471 units (SEC Form 4)

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    3/10/26 8:52:43 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Chief Executive Officer Mastrangelo Joe bought $157,262 worth of shares (23,900 units at $6.58), increasing direct ownership by 2% to 1,487,126 units (SEC Form 4)

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    3/5/26 8:48:21 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Director Dimitrief Alexander bought $90,600 worth of shares (15,000 units at $6.04), increasing direct ownership by 7% to 235,221 units (SEC Form 4)

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    3/4/26 8:56:17 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $BESS
    $EOSE
    SEC Filings

    View All

    SEC Form 25-NSE filed by Eos Energy Enterprises Inc.

    25-NSE - Eos Energy Enterprises, Inc. (0001805077) (Subject)

    7/20/26 4:20:05 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Inc. filed SEC Form 8-K: Results of Operations and Financial Condition, Regulation FD Disclosure, Other Events, Financial Statements and Exhibits

    8-K - Eos Energy Enterprises, Inc. (0001805077) (Filer)

    7/15/26 8:18:57 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Inc. filed SEC Form 8-K: Leadership Update, Other Events, Financial Statements and Exhibits

    8-K - Eos Energy Enterprises, Inc. (0001805077) (Filer)

    7/9/26 4:24:28 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $BESS
    $EOSE
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Eos Energy Enterprises Selected to Deliver Mission-Ready Power for Golden Dome for America

    PITTSBURGH, July 15, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), America’s leading innovator in designing, manufacturing, and providing zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, today announced a strategic partnership with the Department of War to enhance the resilience of national defense infrastructure. Eos was awarded a Golden Dome for America contract to integrate mission-ready long-duration energy storage supporting requirements of the nation’s defense shield. The award was highlighted by President Donald Trump during Senator Dave McCormick's Defense and National Security Sum

    7/15/26 5:01:03 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Announces Preliminary Second Quarter 2026 Financial Results, Expects Record Quarterly Revenue and Backlog, and Sets Second Quarter 2026 Conference Call Date

    PITTSBURGH, July 15, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), America’s leading innovator in designing, manufacturing, and providing zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, today announced preliminary financial results for the second quarter ended June 30, 2026. Based on preliminary financial information, Eos currently expects: Revenue of $68 million to $69 million, representing the highest quarterly revenue in its history, driven by a more than three-fold increase in shipments compared to the prior-year period. Revenue recognized during the first half of 2026 surpassed the

    7/15/26 8:15:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Frontier Power USA Selects 400 MWh Wildfire BESS Project from Bimergen Energy, Bringing Closed and Selected Eos-Backed Project Capacity to 1.8 GWh

    NEW YORK and NEWPORT BEACH, Calif., July 14, 2026 (GLOBE NEWSWIRE) -- Frontier Power USA ("FPUSA" or the "Company"), a long-duration energy storage development and investment platform, and Bimergen Energy Corporation (NYSE:BESS) ("Bimergen"), a U.S. energy infrastructure developer, today announced that FPUSA has selected the Wildfire BESS Project, a 100 MW / 400 MWh battery energy storage project located in Caldwell County, Texas. The project has been selected for conversion onto the FPUSA platform under the parties’ existing strategic framework, is expected to utilize Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos") Z3 long-duration batteries, and closing remains contingent upon the neg

    7/14/26 8:30:00 AM ET
    $BESS
    $EOSE
    Electric Utilities: Central
    Utilities
    Industrial Machinery/Components
    Miscellaneous

    $BESS
    $EOSE
    Leadership Updates

    Live Leadership Updates

    View All

    Eos Energy Enterprises Appoints Cybersecurity and Software Leader Haiyan Song to Board of Directors, Names Marie Martin Chief Legal Officer in Planned Transition

    Song brings deep technology, cybersecurity, software, edge computing, and digital infrastructure expertise as Eos scales American-made energy storage for an increasingly complex grid Pittsburgh-based Martin brings two decades of legal and governance leadership at global industrial companies to strengthen Eos’ foundation as it scales U.S. manufacturing and commercial deployment PITTSBURGH, July 09, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), America’s leading innovator in designing, manufacturing, and providing zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, today announced the appoint

    7/9/26 4:15:00 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Stockholders Approve All Proposals at 2026 Annual Meeting

    EDISON, N.J., June 05, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE), America's leading innovator in designing, manufacturing, and providing zinc-based long duration energy storage (LDES) systems sourced and manufactured in the United States, today announced that stockholders approved all five proposals presented at the Company's 2026 Annual Stockholders' Meeting held on June 3, 2026. Stockholders representing approximately 77.6% of the Company's outstanding shares (or 263,431,701 shares) participated and demonstrated strong support for the Company's proposals, including the election of Jeff Bornstein, Claude Demby, and Nathaniel Fick for three-year terms on the Boar

    6/5/26 9:00:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Appoints Alessandro Lagi as Chief Financial Officer to Advance American Storage Infrastructure at Scale

    PITTSBURGH, April 30, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), an American energy company and the leading innovator in designing, sourcing, manufacturing, and providing zinc-based battery energy storage systems (BESS), today announced the appointment of Alessandro Lagi as Chief Financial Officer, effective June 8, 2026. Lagi joins Eos from Johnson Controls, where he most recently led the Global FP&A and Growth finance team, overseeing planning, commercial, service, and system finance while helping drive stronger earnings performance, cash generation, operational accountability and enterprise transformation. "Alessandro has spent 25 yea

    4/30/26 8:30:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $BESS
    $EOSE
    Financials

    Live finance-specific insights

    View All

    Eos Energy Enterprises Announces Preliminary Second Quarter 2026 Financial Results, Expects Record Quarterly Revenue and Backlog, and Sets Second Quarter 2026 Conference Call Date

    PITTSBURGH, July 15, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), America’s leading innovator in designing, manufacturing, and providing zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, today announced preliminary financial results for the second quarter ended June 30, 2026. Based on preliminary financial information, Eos currently expects: Revenue of $68 million to $69 million, representing the highest quarterly revenue in its history, driven by a more than three-fold increase in shipments compared to the prior-year period. Revenue recognized during the first half of 2026 surpassed the

    7/15/26 8:15:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Reports First Quarter 2026 Financial Results and Announces Frontier Power USA

    Announced with Cerberus the formation of Frontier Power USA, a stand-alone purpose-built entity to develop, finance, and operate LDES projects to accelerate energy storage deployments Entered into a 2 GWh firm capacity reservation agreement with Frontier Power USA$57.0 million in quarterly revenue with the last two quarters surpassing full year 2025 revenue Achieved record quarterly production performance for shipments, battery output, and bipolar manufacturing Completed Factory Acceptance Testing for its second battery line with installation and power-on at the Thorn Hill facility underway; initial production is on schedule and expected to begin by the end of the second quarter Surpassed 6.

    5/13/26 6:34:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Announces Date for First Quarter 2026 Financial Results and Conference Call; Announces Participation at Upcoming Investor Conferences

    EDISON, N.J., April 23, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), an American energy company and the leading innovator in designing, sourcing, manufacturing, and providing zinc-based battery energy storage systems (BESS) manufactured in the United States, today announced it will release its first quarter 2026 financial results before the U.S. market opens on May 13, 2026. A conference call to discuss its results will take place the same morning at 8:30 a.m. Eastern Time. Eos partners with Say Technologies to allow retail and institutional shareholders to submit and vote on questions ahead of the earnings call. A selection of key question

    4/23/26 4:30:00 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $BESS
    $EOSE
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    Amendment: SEC Form SC 13D/A filed by Eos Energy Enterprises Inc.

    SC 13D/A - Eos Energy Enterprises, Inc. (0001805077) (Subject)

    12/17/24 2:48:02 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Amendment: SEC Form SC 13D/A filed by Eos Energy Enterprises Inc.

    SC 13D/A - Eos Energy Enterprises, Inc. (0001805077) (Subject)

    11/4/24 4:56:35 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Amendment: SEC Form SC 13D/A filed by Eos Energy Enterprises Inc.

    SC 13D/A - Eos Energy Enterprises, Inc. (0001805077) (Subject)

    9/12/24 5:14:58 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous