• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Eos Energy Enterprises Announces Preliminary Second Quarter 2026 Financial Results, Expects Record Quarterly Revenue and Backlog, and Sets Second Quarter 2026 Conference Call Date

    7/15/26 8:15:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous
    Get the next $EOSE alert in real time by email

    PITTSBURGH, July 15, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), America’s leading innovator in designing, manufacturing, and providing zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, today announced preliminary financial results for the second quarter ended June 30, 2026.

    Based on preliminary financial information, Eos currently expects:

    • Revenue of $68 million to $69 million, representing the highest quarterly revenue in its history, driven by a more than three-fold increase in shipments compared to the prior-year period. Revenue recognized during the first half of 2026 surpassed the Company's total revenue for 2025.
    • Gross margin loss between 69% and 73%, reflecting continued progress in manufacturing scale and operational execution. The second quarter marked the Company's transition to operating two commercial production lines across two manufacturing facilities. Battery Line 2 commenced commercial production in mid-June and has delivered strong initial results, achieving higher yields and faster cycle time than Battery Line 1 as it operates in the early stages of production ramp. While start-up costs and lower initial production volumes are expected to create near-term cost absorption pressure, as is typical during the early stages of a production ramp-up, the expansion significantly increases capacity and establishes the foundation for stronger unit economics and expected margin improvement over time.
    • Backlog of approximately $807 million as of June 30, 2026, representing a Company record and an increase of approximately 25% from the prior quarter. Growth in backlog reflects strong commercial momentum, with new orders booked exceeding shipments recognized during the quarter and continued conversion of the Company’s commercial pipeline into contracted business, further enhancing expected revenue visibility.
    • Total Cash, including restricted cash, of approximately $364 million as of June 30, 2026, with approximately $78 million of customer collections received during the quarter, exceeding quarterly revenue.

    "Our preliminary second quarter results reflect a quarter of disciplined execution and continued progress across the business," said Joe Mastrangelo, Chief Executive Officer. "We expect to deliver record quarterly revenue and record backlog, demonstrating that the investments we have made in our manufacturing platform continue to translate into stronger topline and commercial performance. With Battery Line 2 now in commercial production, Frontier Power USA progressing through key project milestones, and continued conversion of commercial opportunities into executable projects, we believe Eos is well positioned to drive growth throughout the second half of 2026 and beyond."

    The second quarter marked a period of strong operational execution for Eos. The Company commenced commercial production on Battery Line 2 at its Thorn Hill facility, expanding manufacturing capacity and advancing toward its targeted 4 GWh annual run-rate capacity by year-end. Eos also successfully completed Site Acceptance Testing for 50% of its bipolar automation line, an important milestone in the

    automation of its manufacturing process that enables production from raw materials through finished batteries. Full commissioning of all bi-polar machines is expected in July 2026.

    As manufacturing capacity continues to scale and commercial demand converts into contracted backlog and revenue, Eos believes it is entering its next phase of growth with increasing operational leverage, improving revenue visibility and a stronger financial foundation. Expanded manufacturing capabilities, growing commercial momentum, and continued project execution position the Company to capitalize on what it believes is increasing demand for American-made long-duration energy storage solutions.

    Conference Call Details

    Eos will release its full second quarter 2026 financial results before the U.S. market opens on August 5, 2026. A conference call to discuss its results will take place the same morning at 8:30 a.m. Eastern Time.

    The live webcast of the earnings call will be available on the "Investor Relations" page of the Company’s website at Eos Investors or may be accessed using this link (Registration Link). To avoid delays, we encourage participants to join the conference call fifteen minutes ahead of the scheduled start time.

    The conference call replay will be available via webcast through Eos’ investor relations website for twelve months following the live presentation. The webcast replay will be available from approximately 11:30 a.m. Eastern Time on August 5, 2026, and can be accessed by visiting Eos Investors.

    Eos partners with Say Technologies to allow retail and institutional shareholders to submit and vote on questions ahead of the earnings call. A selection of key questions applicable to the broad investor base may be addressed live during the call, offering shareholders an opportunity to engage with Eos management.

    Beginning on July 20, 2026, at 9:00 a.m. Eastern Time, registered shareholders will be able to submit questions via the Say Technologies Q&A Platform which will remain open until 5:00 p.m. Eastern Time on August 2, 2026. For any support inquires shareholders may email support@saytechnologies.com.

    About Eos Energy Enterprises

    Eos is accelerating the shift to American energy independence with positively ingenious solutions that transform how the world stores power. The Company’s BESS features the innovative Znyth™ technology, a proven chemistry with readily available non-precious earth components, that is the pre-eminent safe, non-flammable, secure, stable, and scalable alternative to conventional technology. The Company’s BESS is ideal for utility-scale, microgrid, commercial, and industrial long-duration energy storage applications (i.e., 4 to 16+ hours) and provides customers with significant operational flexibility to cost effectively address current and future increased grid demand and complexity. For more information about Eos (NASDAQ:EOSE), visit eose.com.

    Contacts

    Investors: ir@eose.com

    Media: media@eose.com

    Forward-Looking Statements and Important Information

    Except for the historical information contained herein, the matters set forth in this press release are forward-looking statements within the meaning of the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995. Forward-looking statements include, but are not limited to, statements regarding preliminary revenue, gross margin, adjusted gross margin, backlog, total cash, customer collections, manufacturing capacity, Battery Line 2 performance, expected commissioning activities, anticipated throughput and efficiency improvements, expected revenue visibility, and the Company’s ability to achieve its operational, and commercial and production-capacity objectives, the extent to which any purchase orders, capacity reservations, or project pipeline may ultimately result in executed contracts, construction

    activities, or revenue; and the anticipated benefits of the FPUSA platform and the Company’s relationships with developers. The words "anticipate," "believe," "continue," "could," "estimate," "expect," "intends," "may," "might," "plan," "possible," "potential," "predict," "project," "should," "would" and similar expressions may identify forward-looking statements, but the absence of these words does not mean that a statement is not forward-looking. Forward-looking statements are based on our management’s beliefs, as well as assumptions made by, and the information currently available to, them. Because such statements are based on expectations as to future financial and operating results and are not statements of fact, actual results may differ materially from those projected.

    Factors which may cause actual results to differ materially from current expectations include, but are not limited to: the preliminary financial information remains subject to changes and finalization based upon management’s ongoing review of results for the second quarter ended June 30, 2026 and the completion of all quarter closing procedures; risks related to the development, financing, construction, and commissioning of projects, including timelines and the ability of counterparties to perform; the timing, issuance, and size of future project-level purchase orders and the conversion of framework agreements, capacity reservations, backlog, and pipeline into revenue; risks related to FPUSA, including its ability to source, acquire, finance, and execute projects, and risks related to Eos’ intended equity interest in FPUSA and any related-party considerations; risks associated with the credit agreement with Cerberus, including risks of default, dilution of outstanding Common Stock, and contractual lockup of shares; our customers’ and project counterparties’ ability to secure project financing; changes adversely affecting the business in which we are engaged; our ability to generate cash, service indebtedness, and raise financing in the future; our ability to continue to develop efficient manufacturing processes to scale and to forecast related costs and efficiencies accurately; risks related to the preliminary nature of the financial information included in this release, including the risk that final results may differ materially from the preliminary results presented herein following completion of quarter-end closing procedures, management review, Audit Committee review, independent auditor review procedures, and finalization of the Company’s financial statements and periodic report; risks related to manufacturing ramp-up, including start-up costs, lower initial production volumes, cost absorption, equipment commissioning, battery line performance, throughput, yield, scrap, labor, materials, supply chain availability and operational efficiency; the amount of final tax credits available pursuant to the Inflation Reduction Act; the timing and availability of future funding under the Department of Energy Loan Facility; competition from existing or new competitors; risks related to legal proceedings or claims; risks associated with evolving energy policies in the United States and the potential costs of regulatory compliance; changes in applicable laws or regulations; our ability to maintain the listing of our shares of common stock on NASDAQ; our ability to grow our business and manage growth profitably and to retain management and key employees; risks related to adverse changes in general economic conditions, including inflationary pressures and increased interest rates; risk from supply chain disruptions and other impacts of geopolitical conflict; and other risks and uncertainties.

    The forward-looking statements contained in this press release are also subject to additional risks, uncertainties, and factors, including those more fully described in the Company’s most recent filings with the Securities and Exchange Commission, including the Company’s most recent Annual Report on Form 10-K and subsequent reports on Forms 10-Q and 8-K. Further information on potential risks that could affect actual results will be included in the subsequent periodic and current reports and other filings that the Company makes with the Securities and Exchange Commission from time to time. Moreover, the Company operates in a very competitive and rapidly changing environment, and new risks and uncertainties may emerge that could have an impact on the forward-looking statements contained in this press release.

    Forward-looking statements speak only as of the date they are made. Readers are cautioned not to put undue reliance on forward-looking statements, and, except as required by law, the Company assumes no obligation and does not intend to update or revise these forward-looking statements, whether as a result of new information, future events, or otherwise.

    Key Metrics

    Backlog. Our backlog represents the amount of revenue that we expect to realize from existing agreements with our customers for the sale of our battery energy storage systems and performance of services. The backlog is calculated by adding new orders in the current fiscal period to the backlog as of the end of the prior fiscal period and then subtracting the shipments in the current fiscal period. If the amount of an order is modified or cancelled, we adjust orders in the current period and our backlog accordingly, but do not retroactively adjust previously published backlogs. There is no comparable US-GAAP financial measure to backlog. We believe that the backlog is a useful indicator regarding the future revenue of our Company.

    Pipeline. Our pipeline represents projects for which we have submitted technical proposals or non-binding quotes plus letters of intent ("LOI") or firm commitments from customers. Pipeline does not include lead generation projects.

    Booked Orders. Booked orders are orders where we have legally binding agreements with a Purchase Order ("PO"), or Master Supply Agreement ("MSA") executed by both parties.



    Primary Logo

    Get the next $EOSE alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $EOSE

    DatePrice TargetRatingAnalyst
    7/14/2026$7.00Buy
    Truist
    5/22/2026$11.00Buy
    Needham
    5/14/2026$7.00 → $8.00Hold
    TD Cowen
    2/27/2026$20.00Buy → Neutral
    Guggenheim
    12/17/2025$16.00Neutral
    Analyst
    9/5/2025$6.50Hold
    Jefferies
    8/1/2025$5.50 → $6.00Hold
    TD Cowen
    2/20/2025$4.00 → $5.00Buy → Neutral
    ROTH MKM
    More analyst ratings

    $EOSE
    SEC Filings

    View All

    SEC Form 25-NSE filed by Eos Energy Enterprises Inc.

    25-NSE - Eos Energy Enterprises, Inc. (0001805077) (Subject)

    7/20/26 4:20:05 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Inc. filed SEC Form 8-K: Results of Operations and Financial Condition, Regulation FD Disclosure, Other Events, Financial Statements and Exhibits

    8-K - Eos Energy Enterprises, Inc. (0001805077) (Filer)

    7/15/26 8:18:57 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Inc. filed SEC Form 8-K: Leadership Update, Other Events, Financial Statements and Exhibits

    8-K - Eos Energy Enterprises, Inc. (0001805077) (Filer)

    7/9/26 4:24:28 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $EOSE
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    SEC Form 4 filed by Director Song Haiyan

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    7/15/26 5:01:36 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    SEC Form 4 filed by Chief Legal Officer Martin Marie Batz

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    7/15/26 4:57:49 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    SEC Form 3 filed by new insider Song Haiyan

    3 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    7/15/26 4:54:59 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $EOSE
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Director Urban David bought $100,100 worth of shares (16,250 units at $6.16), increasing direct ownership by 35% to 62,471 units (SEC Form 4)

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    3/10/26 8:52:43 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Chief Executive Officer Mastrangelo Joe bought $157,262 worth of shares (23,900 units at $6.58), increasing direct ownership by 2% to 1,487,126 units (SEC Form 4)

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    3/5/26 8:48:21 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Director Dimitrief Alexander bought $90,600 worth of shares (15,000 units at $6.04), increasing direct ownership by 7% to 235,221 units (SEC Form 4)

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    3/4/26 8:56:17 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $EOSE
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Truist initiated coverage on Eos Energy with a new price target

    Truist initiated coverage of Eos Energy with a rating of Buy and set a new price target of $7.00

    7/14/26 9:03:58 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Needham initiated coverage on Eos Energy with a new price target

    Needham initiated coverage of Eos Energy with a rating of Buy and set a new price target of $11.00

    5/22/26 8:37:44 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    TD Cowen reiterated coverage on Eos Energy with a new price target

    TD Cowen reiterated coverage of Eos Energy with a rating of Hold and set a new price target of $8.00 from $7.00 previously

    5/14/26 7:59:24 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $EOSE
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Eos Energy Enterprises Selected to Deliver Mission-Ready Power for Golden Dome for America

    PITTSBURGH, July 15, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), America’s leading innovator in designing, manufacturing, and providing zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, today announced a strategic partnership with the Department of War to enhance the resilience of national defense infrastructure. Eos was awarded a Golden Dome for America contract to integrate mission-ready long-duration energy storage supporting requirements of the nation’s defense shield. The award was highlighted by President Donald Trump during Senator Dave McCormick's Defense and National Security Sum

    7/15/26 5:01:03 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Announces Preliminary Second Quarter 2026 Financial Results, Expects Record Quarterly Revenue and Backlog, and Sets Second Quarter 2026 Conference Call Date

    PITTSBURGH, July 15, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), America’s leading innovator in designing, manufacturing, and providing zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, today announced preliminary financial results for the second quarter ended June 30, 2026. Based on preliminary financial information, Eos currently expects: Revenue of $68 million to $69 million, representing the highest quarterly revenue in its history, driven by a more than three-fold increase in shipments compared to the prior-year period. Revenue recognized during the first half of 2026 surpassed the

    7/15/26 8:15:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Frontier Power USA Selects 400 MWh Wildfire BESS Project from Bimergen Energy, Bringing Closed and Selected Eos-Backed Project Capacity to 1.8 GWh

    NEW YORK and NEWPORT BEACH, Calif., July 14, 2026 (GLOBE NEWSWIRE) -- Frontier Power USA ("FPUSA" or the "Company"), a long-duration energy storage development and investment platform, and Bimergen Energy Corporation (NYSE:BESS) ("Bimergen"), a U.S. energy infrastructure developer, today announced that FPUSA has selected the Wildfire BESS Project, a 100 MW / 400 MWh battery energy storage project located in Caldwell County, Texas. The project has been selected for conversion onto the FPUSA platform under the parties’ existing strategic framework, is expected to utilize Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos") Z3 long-duration batteries, and closing remains contingent upon the neg

    7/14/26 8:30:00 AM ET
    $BESS
    $EOSE
    Electric Utilities: Central
    Utilities
    Industrial Machinery/Components
    Miscellaneous

    $EOSE
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    Amendment: SEC Form SC 13D/A filed by Eos Energy Enterprises Inc.

    SC 13D/A - Eos Energy Enterprises, Inc. (0001805077) (Subject)

    12/17/24 2:48:02 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Amendment: SEC Form SC 13D/A filed by Eos Energy Enterprises Inc.

    SC 13D/A - Eos Energy Enterprises, Inc. (0001805077) (Subject)

    11/4/24 4:56:35 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Amendment: SEC Form SC 13D/A filed by Eos Energy Enterprises Inc.

    SC 13D/A - Eos Energy Enterprises, Inc. (0001805077) (Subject)

    9/12/24 5:14:58 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $EOSE
    Leadership Updates

    Live Leadership Updates

    View All

    Eos Energy Enterprises Appoints Cybersecurity and Software Leader Haiyan Song to Board of Directors, Names Marie Martin Chief Legal Officer in Planned Transition

    Song brings deep technology, cybersecurity, software, edge computing, and digital infrastructure expertise as Eos scales American-made energy storage for an increasingly complex grid Pittsburgh-based Martin brings two decades of legal and governance leadership at global industrial companies to strengthen Eos’ foundation as it scales U.S. manufacturing and commercial deployment PITTSBURGH, July 09, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), America’s leading innovator in designing, manufacturing, and providing zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, today announced the appoint

    7/9/26 4:15:00 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Stockholders Approve All Proposals at 2026 Annual Meeting

    EDISON, N.J., June 05, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE), America's leading innovator in designing, manufacturing, and providing zinc-based long duration energy storage (LDES) systems sourced and manufactured in the United States, today announced that stockholders approved all five proposals presented at the Company's 2026 Annual Stockholders' Meeting held on June 3, 2026. Stockholders representing approximately 77.6% of the Company's outstanding shares (or 263,431,701 shares) participated and demonstrated strong support for the Company's proposals, including the election of Jeff Bornstein, Claude Demby, and Nathaniel Fick for three-year terms on the Boar

    6/5/26 9:00:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Appoints Alessandro Lagi as Chief Financial Officer to Advance American Storage Infrastructure at Scale

    PITTSBURGH, April 30, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), an American energy company and the leading innovator in designing, sourcing, manufacturing, and providing zinc-based battery energy storage systems (BESS), today announced the appointment of Alessandro Lagi as Chief Financial Officer, effective June 8, 2026. Lagi joins Eos from Johnson Controls, where he most recently led the Global FP&A and Growth finance team, overseeing planning, commercial, service, and system finance while helping drive stronger earnings performance, cash generation, operational accountability and enterprise transformation. "Alessandro has spent 25 yea

    4/30/26 8:30:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $EOSE
    Financials

    Live finance-specific insights

    View All

    Eos Energy Enterprises Announces Preliminary Second Quarter 2026 Financial Results, Expects Record Quarterly Revenue and Backlog, and Sets Second Quarter 2026 Conference Call Date

    PITTSBURGH, July 15, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), America’s leading innovator in designing, manufacturing, and providing zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, today announced preliminary financial results for the second quarter ended June 30, 2026. Based on preliminary financial information, Eos currently expects: Revenue of $68 million to $69 million, representing the highest quarterly revenue in its history, driven by a more than three-fold increase in shipments compared to the prior-year period. Revenue recognized during the first half of 2026 surpassed the

    7/15/26 8:15:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Reports First Quarter 2026 Financial Results and Announces Frontier Power USA

    Announced with Cerberus the formation of Frontier Power USA, a stand-alone purpose-built entity to develop, finance, and operate LDES projects to accelerate energy storage deployments Entered into a 2 GWh firm capacity reservation agreement with Frontier Power USA$57.0 million in quarterly revenue with the last two quarters surpassing full year 2025 revenue Achieved record quarterly production performance for shipments, battery output, and bipolar manufacturing Completed Factory Acceptance Testing for its second battery line with installation and power-on at the Thorn Hill facility underway; initial production is on schedule and expected to begin by the end of the second quarter Surpassed 6.

    5/13/26 6:34:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Announces Date for First Quarter 2026 Financial Results and Conference Call; Announces Participation at Upcoming Investor Conferences

    EDISON, N.J., April 23, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), an American energy company and the leading innovator in designing, sourcing, manufacturing, and providing zinc-based battery energy storage systems (BESS) manufactured in the United States, today announced it will release its first quarter 2026 financial results before the U.S. market opens on May 13, 2026. A conference call to discuss its results will take place the same morning at 8:30 a.m. Eastern Time. Eos partners with Say Technologies to allow retail and institutional shareholders to submit and vote on questions ahead of the earnings call. A selection of key question

    4/23/26 4:30:00 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous