• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Osisko Development Extends Gold Mineralization at Cariboo Gold Project Beyond 700 m Vertical Depth in Previously Untested Areas; Intercepts Include 13.19 g/t Gold Over 3.60 m at 596 m Vertical Depth and 28.90 g/t Gold Over 0.50 m at 718 m Vertical Depth

    7/8/26 5:15:00 PM ET
    $ODV
    Precious Metals
    Basic Materials
    Get the next $ODV alert in real time by email

    HIGHLIGHTS

    • 8,971 m of new surface exploration drilling designed to test near mine potential at depth and in under-drilled gap zones between defined deposit footprints. Approximately 65% of drilling transected areas outside the Cariboo Gold deposit.
    • Highlight intercepts from outside the footprint of the current mineral resource across multiple zones on strike, include: 13.19 g/t Au over 3.60 m at 596 m vertical depth, 6.40 g/t Au over 6.30 m at 326 m vertical depth (including 40.60 g/t Au over 0.50 m, 19.10 g/t Au over 0.70 m, and 4.56 g/t Au over 0.70 m), 6.17 g/t Au over 7.10 m at 517 m vertical depth (including 73.20 g/t Au over 0.50 m, 10.40 g/t Au over 0.50 m, and 2.21 g/t Au over 0.50 m) and 28.90 g/t Au over 0.50 m at 718 m vertical depth.
    • Results to date confirm the presence of high-grade mineralization at depth and reinforce the strong potential for upside within under-tested gap zones and below the current Cariboo Gold deposit footprint, which extends to an average depth of approximately 350 metres.
    • 5 drill rigs continue operating at surface systematically testing targets down-dip of the current Mineral Resource to a maximum vertical depth of up to 800 metres.



    MONTREAL, July 08, 2026 (GLOBE NEWSWIRE) -- Osisko Development Corp. (NYSE:ODV, TSXV:ODV) ("Osisko Development" or the "Company") is pleased to announce new drilling results from eleven (11) surface diamond drill holes that were completed as part of an ongoing deeps and near mine gap infill exploration program at the Company's permitted, 100%-owned Cariboo Gold Project ("CGP" or the "Project"), located in central British Columbia, Canada.

    Chris Lodder, President, stated, "We are encouraged by the initial results of the surface exploration drill program at the Cariboo Gold Project, which intercepted mineralization in all eleven drill holes. Strong high-grade intercepts in previously untested areas and known under-tested gaps continue to demonstrate the at depth potential for resource growth beyond our current mineral inventory. These results reinforce our view that we are only beginning to define the full extent of the mineralized system at depth, while identifying compelling near-mine upside opportunities — all within the Project's existing permitted footprint. We are at an early stage of this program and are excited to keep drilling."

    DRILL ASSAY HIGHLIGHTS

    This news release includes assays from eleven (11) surface deeps and gap zone exploration diamond drill ("DD") holes totaling 8,971 metres ("m") with depths ranging from 114 to 1,159 m (see Table 1 and Figure 2) completed between December 2025 and April 2026. Approximately 65%, or 5,823 m of drilling transected areas outside the current Cariboo Gold Mineral Resources, as defined by a 15 m buffer around optimized Mineral Reserves and Mineral Resources stope shapes1. All holes were collared in HQ (63.5 millimetre diameter) and reduced to NQ (47.6 millimetre diameter) where necessary to continue advance or implement directional drilling. Available tooling for directional drilling requires advance in NQ with a BQ (36.5 millimetre diameter) output while steering is active. All assays were received by June 1, 2026. Select assay highlights from intercepts outside the current Mineral Resources footprint include:

    • 42.42 grams per tonne ("g/t") gold ("Au") over 1.50 m in IM-26-001 at 111 m vertical depth (Figure 2), including:
      • 122.50 g/t Au over 0.50 m, and
      • 3.17 g/t Au over 0.50 m
    • 6.40 g/t Au over 6.30 m in IM-26-001 at 326 m vertical depth, including:
      • 40.60 g/t Au over 0.50 m, and
      • 19.10 g/t Au over 0.70 m, and
      • 4.56 g/t Au over 0.70 m
    • 6.17 g/t Au over 7.10 m in IM-26-003 at 517 m vertical depth, including:
      • 73.20 g/t Au over 0.50 m, and
      • 10.40 g/t Au over 0.50 m, and
      • 2.21 g/t Au over 0.50 m
    • 13.19 g/t Au over 3.60 m in IM-26-003 at 596 m vertical depth, including:
      • 73.10 g/t Au over 0.50 m, and
      • 15.95 g/t Au over 0.50 m, and
      • 2.25 g/t Au over 0.60 m, and
      • 1.93 g/t Au over 0.50 m
    • 4.87 g/t Au over 5.90 m in IM-26-003 at 524 m vertical depth, including:
      • 29.00 g/t Au over 0.50 m, and
      • 17.15 g/t Au over 0.50 m, and
      • 4.56 g/t Au over 0.50 m, and
      • 2.81 g/t Au over 0.50 m
    • 6.61 g/t Au over 4.50 m in IM-26-003 at 425 m vertical depth (Figure 3), including:
      • 41.00 g/t Au over 0.50 m, and
      • 5.84 g/t Au over 0.50 m, and
      • 4.40 g/t Au over 0.50 m, and
      • 2.91 g/t Au over 0.50 m, and
      • 2.24 g/t Au over 0.50 m
    • 2.79 g/t Au over 8.25 m in IM-26-001 at 436 m vertical depth, including:
      • 19.65 g/t Au over 0.50 m, and
      • 9.30 g/t Au over 0.50 m, and
      • 3.06 g/t Au over 0.50 m, and
      • 6.36 g/t Au over 0.50 m, and
      • 4.03 g/t Au over 0.50 m
    • 13.83 g/t Au over 1.55 m in IM-26-003 at 277 m vertical depth, including:
      • 38.70 g/t Au over 0.55 m
    • 8.81 g/t Au over 2.25 m in CM-26-001 at 370 m vertical depth, including:
      • 23.10 g/t Au over 0.50 m, and
      • 16.00 g/t Au over 0.50 m
    • 17.32 g/t Au over 1.00 m in CM-25-003 at 371 m vertical depth, including:
      • 33.10 g/t Au over 0.50 m



    Complete assay highlights, including true width estimates and vertical depths from surface, are presented in Tables 1 and 2, split by relative position within and outside of the current footprint of the Cariboo Gold Mineral Resources1. Drill hole locations and collar orientations are listed in Table 2. Intervals not recovered by drilling were assigned zero grade. Top cuts have not been applied to high grade assays.

    Figure 1: Plan view Cariboo deep and gap zone surface drilling select intercept highlights.

    Figure 1: Plan view Cariboo deep and gap zone surface drilling select intercept highlights.

    Figure 2: 42.42 g/t Au over 1.50 m in IM-26-001 at 111 m vertical depth.

    Figure 2: 42.42 g/t Au over 1.50 m in IM-26-001 at 111 m vertical depth.

    Figure 3: 6.61 g/t au over 4.50 m in IM-26-003 at 425 m vertical depth.

    Figure 3: 6.61 g/t au over 4.50 m in IM-26-003 at 425 m vertical depth.

    Figure 4: 2.79 g/t Au over 8.25 m in IM-26-001 at 436 m vertical depth.

    Figure 4: 2.79 g/t Au over 8.25 m in IM-26-001 at 436 m vertical depth.

    Figure 5: Long section displaying Cariboo deeps and gap zone surface drilling with select intercept highlights.

    Figure 5: Long section displaying Cariboo deeps and gap zone surface drilling with select intercept highlights.

    DISCUSSION OF RESULTS

    • Results to date confirm the presence of high-grade mineralization at depth and reinforce the strong potential for resource growth upside well beyond the 350 m average of depth of the current deposit.
    • The consistency of broad high-grade intercepts in drill holes testing through and under the Shaft-Mosquito Gap, as seen in IM-26-002 and IM-26-003 (Figure 5), suggests high potential for near mine upside within this previously undertested zone.
    • Significant number of intercepts in Table 1 (length weighted assay composites and individual samples>=1.8 g/t Au within the footprint of the current Mineral Resources) demonstrate notable continuity and possible resource upside potential.
    • All eleven holes released encountered assay composites >=1.8 g/t Au, with ten holes encountering assay composites >=1.8 g/t Au outside the current Mineral Resources. One hole (CM-25-001) was stopped early at 114 m due to historical workings intercepted at 108 m downhole.



    ABOUT THE CARIBOO DEEP PROGRAM

    This ongoing program is designed to test the potential for vein corridor extensions of the existing Cariboo Gold deposit down to vertical depths of up to 800 m. The defined limit of the existing Cariboo Gold Mineral Resources and Mineral Reserves reflects limitations imposed by local topography and the practical depth of surface drills for achieving intercept spacing required for a mineral resource estimate, which is approximately 350 m vertical on average across the 4.4 km strike of the deposit. The program is also designed to target under-tested gap areas between defined deposit zones where historic mining was observed, including, for example, the ~1.2 km gap between the Shaft and Mosquito Creek Zones. Drillholes collared within the defined resource provide additional infill intercepts at shallower depths. Directional drilling has been implemented on select drillholes for higher precision targeting to depth.

    Ongoing surface drilling will continue to systematically test down-dip of the current resource to a maximum along strike target spacing of 300 m. Additional holes at target spacing 50 m near surface and 100 m at depth will be drilled to test continuity around the most prospective intercepts outside the current Mineral Resources footprint. New lithologic data incorporated into updated and extended geologic models is expected to aid in further refining of at depth targets.

    Table 1: Length weighted assay composites and individual samples>=1.8 g/t for Cariboo Deep diamond drill intercepts within the footprint of the current resource.

    Drillhole ID From (m)To (m)Length (m)Au g/tEst. True

    Width (m)
    Vertical

    Depth (m)
    CM-25-001 100.30104.253.952.732.5478 
     Including102.65103.751.108.68  
    CM-25-002 65.4065.900.501.910.3551 
      101.80104.803.002.742.1280 
     Including101.80103.301.503.24  
     and103.30104.801.502.23  
      177.10180.503.409.312.30140 
     Including177.10177.600.502.57  
     and177.60178.100.5038.10  
     and179.50180.000.5016.25  
     and180.00180.500.503.03  
      187.25187.800.559.300.39147 
      191.70196.204.504.413.18153 
     Including193.70194.200.5012.75  
     and195.70196.200.5025.00  
      208.00211.753.753.632.41166 
     Including209.00209.500.5024.90  
      230.40231.901.502.261.41184 
     Including230.90231.400.506.45  
      233.50234.000.5016.050.50186 
      235.00236.001.0017.470.42188 
     Including235.00235.500.5034.50  
      248.30251.202.9012.091.77200 
     Including249.70250.450.7526.50  
     and250.45251.200.7519.60  
      264.90266.902.0012.831.41214 
     Including265.40265.900.505.61  
     and265.90266.400.5045.40  
    CM-25-003 86.5087.000.503.190.2572 
      142.35142.850.503.100.25117 
      178.85179.851.001.830.77147 
     Including179.35179.850.502.00  
      197.45200.152.701.882.24163 
     Including199.65200.150.508.22  
      215.30215.800.501.870.35177 
      248.70249.701.002.440.91204 
     Including249.20249.700.504.39  
      312.85313.851.002.260.67255 
     Including312.85313.350.504.21  
      321.40322.401.002.110.71262 
     Including321.40321.900.503.86  
     and346.00347.001.008.400.71281 
      351.85353.501.6510.621.13286 
     Including351.85353.001.1515.20  
      355.90357.001.103.350.90290 
     Including355.90356.500.605.94  
      364.25364.750.503.060.38296 
      365.90368.152.2564.131.87298 
     Including367.65368.150.50288.00  
      392.05392.550.502.340.39320 
    CM-26-001 171.10172.851.757.301.39129 
     Including172.35172.850.5024.90  
      198.80199.801.002.060.64149 
     Including199.30199.800.503.43  
      340.70343.602.902.931.96254 
     Including340.70341.851.155.61  
     and341.85342.550.702.45  
      344.75346.201.452.200.98257 
     Including345.25346.200.953.20  
      352.70353.801.102.200.63263 
     Including353.20353.800.603.81  
     and356.10356.600.502.810.41265 
      473.75474.751.001.880.76356 
     Including474.25474.750.502.09  
    CM-26-002 35.4036.551.155.760.7415 
     Including35.9036.550.6510.00  
      61.5064.252.751.852.1124 
     Including62.0062.500.509.38  
      73.0074.401.403.491.0328 
     Including73.0073.600.602.43  
     and73.6074.400.804.29  
      76.4584.007.553.265.3431 
     Including77.4577.950.502.06  
     and78.4579.501.0513.10  
     and80.1081.000.908.55  
      92.8597.004.155.303.9936 
     Including93.3594.000.6513.05  
     and94.0094.500.5025.80  
      172.00172.500.505.770.4372 
      201.50202.901.402.481.0790 
      207.85208.350.501.820.3892 
      213.20213.700.501.860.3894 
      222.80226.753.9511.112.9199 
     Including223.55224.050.5066.80  
     and224.55225.050.5016.85  
      232.90234.001.102.190.71102 
     Including233.40234.000.603.85  
      253.90257.003.108.292.61114 
     Including253.90254.400.502.97  
     and254.40254.900.5045.00  
     and254.90255.400.503.14  
      261.25264.303.053.371.96118 
     Including261.25261.750.5015.45  
     and262.85263.550.703.12  
      268.50269.501.002.420.64123 
     Including269.00269.500.504.60  
      305.30305.800.5010.600.32145 
      319.00322.003.005.502.12154 
     Including321.50322.000.5031.80  
      390.50392.351.851.931.31197 
     Including390.50391.000.505.35  
      410.00418.008.002.416.13212 
     Including411.00411.500.5010.80  
     and415.00415.500.5015.80  
     and416.00416.500.509.69  
      442.00443.101.102.350.78231 
      449.15449.850.702.220.45236 
      452.65457.004.352.342.80240 
     Including456.40457.000.6016.25  
      458.30461.853.5512.302.91243 
     Including459.50460.901.4017.50  
     and460.90461.850.9519.75  
      485.90486.400.508.400.37260 
      537.50542.905.4021.354.14300 
     Including540.65541.150.503.15  
     and541.15542.401.2589.80  
    CM-26-003 36.0036.500.5011.200.3829 
      153.00153.700.703.040.43115 
      264.00264.500.502.071.00198 
      353.90354.901.002.220.64265 
     Including353.90354.400.504.10  
      373.00374.001.002.280.82279 
      377.00377.500.502.090.32281 
    IM-25-001 46.2547.000.7538.300.6537 
      49.0550.051.008.410.8740 
     Including49.0549.550.5016.70  
      93.0094.701.702.741.6084 
     Including93.6594.200.557.53  
      128.65129.150.504.310.41118 
      180.00181.001.002.171.65169 
      190.00192.252.251.891.84180 
     Including190.70191.200.503.96  
     and191.75192.250.504.03  
      248.50249.000.502.020.32237 
      296.60297.601.002.020.57285 
     Including297.10297.600.503.11  
      334.60336.401.802.501.56324 
     Including334.60335.200.605.42  
      340.45352.5012.055.077.47335 
     Including340.95341.850.9020.20  
     and341.85342.450.602.70  
     and343.00343.550.556.62  
     and343.55344.050.5014.75  
     and344.70345.500.801.81  
     and345.50346.050.552.73  
     and346.05347.451.4015.15  
      361.00365.004.002.563.06351 
     Including361.50362.000.5016.20  
     and363.00363.550.552.68  
      371.85372.851.002.470.69360 
     Including371.85372.350.503.55  
      379.75383.253.503.132.92369 
     Including379.75380.250.503.57  
     and380.25380.750.503.55  
     and381.25381.750.504.52  
     and381.75382.250.505.93  
     and382.25382.750.504.05  
      399.05401.052.009.111.65388 
     Including399.05399.550.5032.10  
     and400.55401.050.504.00  
      410.75412.701.954.391.83399 
     Including410.75411.250.505.91  
     and411.25412.200.955.80  
      516.75517.751.001.830.77504 
     Including516.75517.250.503.19  
    IM-26-001 237.00238.501.502.131.36215 
      456.55457.100.552.640.44401 
    IM-26-002 90.5092.652.1513.481.8252 
     Including90.5091.000.5055.60  
      152.20153.701.501.851.2393 
     Including152.70153.200.501.93  
     and153.20153.700.503.50  
      221.00222.601.609.181.41144 
     Including221.00221.500.5025.80  
     and221.50222.000.503.29  
      241.40243.702.305.051.99161 
     Including241.40242.501.1010.40  
      290.30292.652.355.341.80201 
     Including290.30291.501.209.48  
      306.75309.753.004.142.57214 
     Including308.75309.250.501.95  
     and309.25309.750.5021.60  
    IM-26-004 56.1559.052.901.812.2253 
     Including56.1557.000.854.53  
      62.4066.804.407.623.8160 
     Including62.4063.401.001.84  
     and64.1564.650.502.41  
     and64.6565.150.5058.30  
      73.2074.701.5011.581.1569 
     Including73.2073.700.5016.10  
     and74.2074.700.5018.60  
      76.0077.151.154.601.0072 
      223.15224.501.352.091.03208 
     Including224.00224.500.505.45  
      233.75234.801.052.750.91215 
     Including233.75234.250.505.56  
      279.00279.500.503.700.49250 
      283.50284.000.503.810.49253 
      294.00294.500.504.370.47261 
      378.00378.800.801.930.51307 
      387.50388.000.503.290.49310 



    Table 2:
    Length weighted assay composites and individual samples>=1.8 g/t for Cariboo Deep diamond drill intercepts outside the footprint of the current resource.

    Drillhole ID From (m)To (m)Length (m)Au g/tEst. True

    Width (m)
    Vertical

    Depth (m)
    CM-25-002 424.25424.750.503.560.42354 
    CM-25-003 440.50441.501.002.890.77360 
     Including441.00441.500.505.62  
      454.50455.501.0017.320.77371 
     Including455.00455.500.5033.10  
      643.85644.350.5010.350.38524 
      704.25704.750.504.010.29564 
    CM-26-001 492.50494.752.258.811.72370 
     Including492.50493.000.5023.10  
     and493.00493.500.5016.00  
      496.75497.250.502.640.38372 
      540.00542.502.503.482.11404 
     Including540.70541.400.703.56  
     and542.00542.500.5011.95  
      546.30548.302.002.251.49409 
     Including546.80547.300.505.22  
     and547.30547.800.503.23  
      550.75551.250.504.140.38411 
    CM-26-002 642.30642.950.652.290.50378 
      655.60658.402.803.581.94388 
     Including655.60657.051.456.07  
      698.00698.500.504.880.29418 
      790.65791.951.301.970.75494 
      892.70893.200.504.570.29572 
    CM-26-003 442.35442.850.501.920.43323 
      445.40445.900.502.370.41324 
      456.50457.501.001.890.64325 
     Including456.50457.000.502.72  
      459.50460.000.503.330.47325 
      462.00462.500.503.850.35326 
      477.05479.001.952.431.67328 
     Including477.05478.000.952.72  
     Including478.00478.500.504.09  
      543.40550.757.352.125.42347 
     Including544.90545.400.5014.80  
     and548.00548.500.502.00  
     and549.90550.750.854.49  
      552.25557.104.851.802.61350 
      555.10556.601.504.29  
      565.75566.751.009.850.61355 
     Including565.75566.250.5019.60  
      568.15568.650.503.240.29355 
      659.50660.000.502.410.35400 
      708.60709.100.502.850.47430 
      801.50802.000.502.650.35490 
      822.90823.901.003.940.71506 
     Including822.90823.400.502.19  
     and823.40823.900.505.68  
      830.60831.200.601.860.39511 
    IM-25-001 563.80564.801.002.070.87551 
     Including564.30564.800.503.78  
    IM-26-001 115.40115.900.505.010.35101 
      126.05127.551.5042.421.27111 
     Including126.05126.550.503.17  
     and126.55127.050.50122.50  
      151.00152.601.602.161.39135 
     Including151.00151.600.605.52  
      359.30365.606.306.405.85326 
     Including359.30360.000.7019.10  
     and360.50361.000.5040.60  
     and362.50363.200.704.56  
      424.00427.603.602.343.01376 
     Including424.00424.500.5012.30  
     and425.00425.500.502.21  
      456.55457.100.552.640.44401 
      494.25502.508.252.796.92436 
     Including494.25494.750.5019.65  
     and495.25495.750.509.30  
     and498.50499.000.503.06  
     and499.50500.000.506.36  
     and501.00501.500.504.03  
      515.50516.000.504.200.41472 
      536.85537.851.003.200.87452 
     Including537.35537.850.506.24  
      555.75556.250.5021.900.35490 
      628.00629.501.502.931.41559 
      798.50799.000.5028.900.29718 
    IM-26-002 505.75507.001.251.980.98358 
     Including505.75506.300.554.21  
      578.00578.500.507.720.38413 
      619.30619.800.502.220.38442 
      646.90647.550.654.770.50463 
    IM-26-003 26.6028.602.007.421.7318 
     Including27.1028.101.0013.75  
      289.10289.600.505.780.41210 
      308.00309.401.403.920.70225 
      377.45379.001.5513.831.19277 
     Including377.95378.500.5538.70  
      554.50555.000.5023.300.35404 
      579.50584.004.506.613.32425 
     Including579.50580.000.505.84  
     and581.00581.500.5041.00  
     and581.50582.000.502.24  
     and582.00582.500.502.91  
     and582.50583.000.504.40  
      694.45695.451.002.880.57501 
     Including694.95695.450.505.46  
      708.60709.150.554.140.32510 
      717.40724.507.106.175.22517 
     Including717.90718.400.502.21  
     and722.00722.500.5073.20  
     and724.00724.500.5010.40  
      725.75726.751.002.790.66520 
     Including726.25726.750.504.95  
      730.35736.255.904.874.40524 
     Including731.50732.000.502.81  
     and732.00732.500.5029.00  
     and734.75735.250.504.56  
     and735.75736.250.5017.15  
      771.75773.101.351.981.05548 
     Including772.60773.100.505.07  
      818.80819.300.504.610.41578 
      842.30845.903.6013.191.89596 
     Including842.30842.800.5015.95  
     and843.30843.800.5073.10  
     and844.30844.900.602.25  
     and844.90845.400.501.93  
      938.70940.201.505.250.93664 
     Including938.70939.200.502.47  
     and939.70940.200.5013.25  



    Table 3:
    Surface DD collar locations, orientations, and max drillhole depths. Negative dips point down.

    Drillhole IDTarget AreaEasting

    (UTM Zn 10N)
    Northing

    (UTM Zn 10N)
    Elevation

    (m)
    Depth

    (m)
    Collar

    Dip
    Collar

    Azimuth
    CM-25-001Valley59534958839991201.37114-50100 
    CM-25-002Valley / Cow59536458839941201.40757.4-51101 
    CM-25-003Valley / Cow59529858841771200.79891.5-55100 
    CM-26-001Cow59564458837701282.971003-45100 
    CM-26-002Cow / Valley59564358837641284.381027-45323 
    CM-26-003Cow59590058836101359.411159.1-45105 
    IM-25-001Shaft59491858841841295.53720-45315 
    IM-26-001Shaft59498958843451302.34808.35-45310 
    IM-26-002Shaft / Mosquito-Shaft Gap59461558845201396.15868.4-45305 
    IM-26-003Mosquito-Shaft Gap59424458847321411.35983.3-50320 
    IM-26-004Shaft59491458841871292.45639-45305 



    CORPORATE NAME CHANGE

    As previously announced, Osisko Development Corp. intends to change its name to Osisko Gold Group Inc., after receiving shareholder approval for the change of name at its annual and special meeting held on June 23, 2026. Also as previously announced, the Company intends to change the trading symbol for its common shares on both the TSX Venture Exchange ("TSXV") and the New York Stock Exchange ("NYSE") from "ODV" to "OGG".

    The Company anticipates the legal change in name to become effective on July 20, 2026, and expects its common shares to begin trading under the new symbol "OGG" on both the TSXV and the NYSE effective at market open on July 20, 2026. The trading symbols for the Company's common share purchase warrants are also expected to change effective at market open on July 20, 2026: (i) warrants trading under "ODVWZ" on the Nasdaq Stock Market ("Nasdaq") and "ODV.WT.U" on the TSXV will change to "OGGWZ" and "OGG.WT.U", respectively; and (ii) warrants trading on the TSXV under "ODV.WT.A" and "ODV.WT.V" will change to "OGG.WT.A", and "OGG.WT.V", respectively.

    In connection with the name and symbol changes of the Company's listed securities, the CUSIPs and ISIN's of the Company's securities will change as well. For the Company's common shares, the CUSIP and ISIN will be changed to 68827X105 and CA68827X1050, respectively. In addition, the following new CUSIP and ISIN numbers have been assigned to the warrants of the Company: (i) OGG.WT.A: CUSIP 68827X139 and ISIN CA68827X1399; (ii) OGG.WT.U (TSXV) and OGGWZ (Nasdaq): CUSIP 68827X113 and ISIN CA68827X1134; and (iii) OGG.WT.V: CUSIP 68827X121 and ISIN CA68827X1217.

    ABOUT CARIBOO GOLD PROJECT

    The Cariboo Gold Project is a permitted, 100%-owned feasibility-stage project located in the historic Wells-Barkerville mining camp of central British Columbia, Canada. Spanning approximately 186,740 hectares, the Company's land package includes 443 mineral titles and covers an area that extends approximately 77-kilometres from northwest to southeast. In late 2024, the Project was granted the Mines Act and Environmental Management Act (British Columbia) permits, marking the successful completion of the permitting process for key approvals, solidifying the Project's shovel-ready status.

    The Cariboo Gold Project hosts Probable Mineral Reserves of 2.07 million ounces of contained Au (17,815 kt grading 3.62 g/t Au); Measured Mineral Resources of 8,000 ounces of contained Au (47 kt grading 5.06 g/t Au); Indicated Mineral Resources of 1.60 million ounces of contained Au (17,332 kt grading 2.88 g/t Au); and Inferred Mineral Resources of 1.86 million ounces of contained Au (18,774 kt grading 3.09 g/t Au). Mineral Resources are reported exclusive of Mineral Reserves.

    Technical Reports

    Scientific and technical information relating to the Cariboo Gold Project and the 2025 feasibility study on the Cariboo Gold Project is supported by the technical report, titled "NI 43-101 Technical Report, Feasibility Study for the Cariboo Gold Project, District of Wells, British Columbia, Canada" and dated June 11, 2025 (with an effective date of April 25, 2025) (the "Cariboo Technical Report").

    For readers to fully understand the information in the Cariboo Technical Report, reference should be made to the full text of the Cariboo Technical Report in its entirety, including all assumptions, parameters, qualifications, limitations and methods therein. The Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context. The Technical Report was prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") and is available electronically on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) under Osisko Development's issuer profile and on the Company's website at www.osiskodev.com.

    Qualified Persons

    The scientific and technical information contained in this news release has been reviewed, verified and approved by Scott Smith, P. Geo., Vice President, Exploration of Osisko Development, a "qualified person" within the meaning of NI 43-101. Verification includes core photo and three-dimensional review of logged drillhole data and assays consistent with the Company's standard procedures.

    Quality Assurance (QA) – Quality Control (QC)

    HQ and NQ diameter drill core is cut (halved) on site at the Cariboo Project subsequent to QAQC checks for logging and sampling errors. BQ core (limited to directional intervals) are whole core sampled following daily QAQC. Any BQ intercepts external to the footprint of the current resource (none herein) are to be excluding from informing any new resource shapes. Quality control (QC) samples are inserted at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. Samples are bagged, labeled, sealed with numbered security tags

    All drill core samples are submitted to ALS Geochemistry's analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays, and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed, and 250 grams is pulverized. Analysis for gold is by 50 gram fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed by fire-assay with gravimetric finish (upper limit 10,000 ppm). Select samples containing visible gold and/or cosalite are flagged during logging for an additional 1,000-gram screen metallic fire assay to ensure accurate quantification of any coarse fraction. All samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS).

    End Notes (excluding tables)

    1. Refer to the Cariboo Technical Report for the assumptions, qualifications and limitations relating to disclosure about the Cariboo Gold Project and the 2025 feasibility study on the Cariboo Gold Project.



    ABOUT OSISKO DEVELOPMENT CORP.

    Osisko Development Corp. is a continental North American gold development company focused on past producing mining camps with district scale potential. The Company's objective is to become an intermediate gold producer through the development of its flagship, fully permitted, 100%-owned Cariboo Gold Project, located in central British Columbia, Canada. Its project pipeline is complemented by the Tintic Project located in the historic East Tintic mining district in Utah, U.S.A., a brownfield property with significant exploration potential, extensive historical mining data, and access to established infrastructure. Osisko Development is focused on developing long-life mining assets in mining-friendly jurisdictions while maintaining a disciplined approach to capital allocation, development risk management, and mineral inventory growth.

    For further information, visit our website at www.osiskodev.com or contact:

    Sean RoosenPhilip Rabenok
    Chairman and CEOVice President, Investor Relations
    Email: sroosen@osiskodev.comEmail: prabenok@osiskodev.com
    Tel: +1 (514) 940-0685Tel: +1 (437) 423-3644
      

    CAUTION REGARDING FORWARD LOOKING STATEMENTS

    This news release contains "forward-looking information" (within the meaning of applicable Canadian securities laws) and "forward-looking statements" (within the meaning of the U.S. Private Securities Litigation Reform Act of 1995, as amended) (collectively, "forward-looking statements"). Such forward-looking statements are identified with words such as "may", "will", "would", "could", "anticipate", "believe", "expect", "plan", "intend", "potential", "estimate", "propose", "project", "outlook", "foresee", "objective", "strategy", variants of these words or the negative or comparable terminology, as well as terms usually used in the future and the conditional. Information contained in forward-looking statements is based upon certain material assumptions that were applied in drawing a conclusion or making a forecast or projection, including the assumptions, qualifications, limitations or statements pertaining to: the utility and significance of the exploration drilling designed to test near mine potential at depth and in under-drilled gap zones; the results and interpretation thereof confirming the presence of high-grade mineralization at depth; the strong potential for upside and resource growth beyond the current mineral inventory at the Cariboo Gold Project; the utility and significance of the results and interpretation in providing positive indication of understanding (if any) of the potential full extent of the mineralized system at depth and whether compelling near-mine upside opportunities exist (if at all); the significance of continued drilling at depth and in underexplored zones; the interpretation and accuracy of intercepts to suggest possible extensions of vein corridors, with potential for resource conversion and upside mineralization; the interpretation of drill results being outside the current areas of the Cariboo Gold deposit; the strong potential for resource growth upside well beyond the 350 metre average of depth of the current deposit (if at all); the consistency of broad high-grade intercepts in drill holes testing through and under the Shaft-Mosquito Gap and the potential for near mine upside within this previously untested zone (if at all); the interpretation and accuracy of intercepts demonstrating continuity and possible resource upside potential ; the utility and significance of incorporating new lithologic data into updated and extended geologic models and its expectation of aiding in further refining of at depth targets (if at all); the prospectivity of exploration in targets outside of currently defined mineral reserves and/or mineral resources; the interpretation and accuracy of spatial geometries, geological structure and local variability modeling and assumptions in regard to potential reserve or resource revisions (if at all); the results (if any) of further exploration work and ability of the Company to define and expand mineral resources beyond current mineral resource estimates; the ability and utility of exploration work (including drilling) to inform resource modeling, mine planning, production stope design procedures and parameters, refinement of infill drill requirements, and the appropriate drill spacing for future infill drilling (if at all); assumptions, qualifications and parameters underlying the Cariboo Technical Report (including, but not limited to, the mineral resources, mineral reserves, production profile, mine design and project economics); the results of the Cariboo Technical Report as an indicator of quality and robustness of the Cariboo Gold Project, as well as other considerations that are believed to be appropriate in the circumstances; the ability of the Company to achieve the estimates outlined in the Cariboo Technical Report in the timing contemplated (if at all); mineral resource category conversion; the future development and operations at the Cariboo Gold Project; management's perceptions of historical trends, current conditions and expected future developments; the utility and significance of historic data, including the significance of the district hosting past producing mines; the ability of exploration work (including drilling and sampling) to accurately predict mineralization; the ability of the Company to complete its exploration and development objectives for its projects in the timing contemplated and within expected costs (if at all); the ability to adapt to changes in gold prices, estimates of costs, estimates of planned exploration and development expenditures; the Company's strategy and objectives relating to the Cariboo Gold Project as well as its other projects; the assumptions, qualifications and limitations relating to the Cariboo Gold Project being permitted; the exploration potential and prospectivity (if any) of its properties; the Company's anticipated name change and trading of its securities under its updated stock ticker symbols (including timing thereof); regulatory framework remaining defined and understood as well as other considerations that are believed to be appropriate in the circumstances, and any other information herein that is not a historical fact may be "forward looking information". Actual results could differ materially due to a number of factors, including, without limitation: the change in the Company's trading symbols and the marketplace effective date of such changes, risks relating to third-party approvals, including the issuance of permits by governments, capital market conditions and the Company's ability to access capital on terms acceptable to the Company for the contemplated exploration and development at the Company's properties; risks related to the exploration, development and operation of the Cariboo Gold Project; risks related to geological modeling and resource estimation; health, safety and security incidents; regulatory delays or changes in regulatory framework and applicable laws; labour shortages or disputes; general economic and market conditions and business conditions in the mining industry; fluctuations in commodity and currency exchange rates; changes in regulatory framework and applicable laws, as well as those risks and factors disclosed in the Company's most recent annual information form, financial statements and management's discussion and analysis as well as other public filings on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov).

    Although the Company believes the expectations conveyed by the forward-looking statements are reasonable based on information available as of the date hereof, no assurances can be given as to future results, levels of activity and achievements. The Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by law. Forward-looking statements are not guarantees of performance and there can be no assurance that these forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

    Photos accompanying this announcement are available at

    https://www.globenewswire.com/NewsRoom/AttachmentNg/4eeeff64-1f84-49a7-8179-5ac9fde4dabb

    https://www.globenewswire.com/NewsRoom/AttachmentNg/88fe5c1e-b6a9-4d12-ac25-ac28fb0e4a89

    https://www.globenewswire.com/NewsRoom/AttachmentNg/e9b03dde-4ba8-4fac-98f5-6d752d906961

    https://www.globenewswire.com/NewsRoom/AttachmentNg/c8bb4b85-0070-4da0-a48f-81e56f9a6ed2

    https://www.globenewswire.com/NewsRoom/AttachmentNg/65b665c5-659e-43b4-9d66-6d362f846146



    Primary Logo

    Get the next $ODV alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $ODV

    DatePrice TargetRatingAnalyst
    More analyst ratings

    $ODV
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Osisko Gold Completes Name Change from Osisko Development

    TORONTO, July 15, 2026 (GLOBE NEWSWIRE) -- Osisko Gold Group Inc. (NYSE:ODV, TSXV:ODV) ("Osisko Gold" or the "Company") is pleased to announce the completion of its previously announced name change to "Osisko Gold Group Inc." from "Osisko Development Corp." (and "Groupe Aurifère Osisko Inc." from "Osisko Développement Corp."), effective July 14, 2026 (the "Name Change"), following receipt of shareholder approval at its annual and special meeting of shareholders held on June 23, 2026, and receipt of other applicable regulatory approvals. The Osisko Gold common shares are expected to commence trading under its new name and stock ticker symbol "OGG" on the TSX Venture Exchange ("TSXV") and t

    7/15/26 8:30:00 AM ET
    $ODV
    Precious Metals
    Basic Materials

    Osisko Development Extends Gold Mineralization at Cariboo Gold Project Beyond 700 m Vertical Depth in Previously Untested Areas; Intercepts Include 13.19 g/t Gold Over 3.60 m at 596 m Vertical Depth and 28.90 g/t Gold Over 0.50 m at 718 m Vertical Depth

    HIGHLIGHTS 8,971 m of new surface exploration drilling designed to test near mine potential at depth and in under-drilled gap zones between defined deposit footprints. Approximately 65% of drilling transected areas outside the Cariboo Gold deposit.Highlight intercepts from outside the footprint of the current mineral resource across multiple zones on strike, include: 13.19 g/t Au over 3.60 m at 596 m vertical depth, 6.40 g/t Au over 6.30 m at 326 m vertical depth (including 40.60 g/t Au over 0.50 m, 19.10 g/t Au over 0.70 m, and 4.56 g/t Au over 0.70 m), 6.17 g/t Au over 7.10 m at 517 m vertical depth (including 73.20 g/t Au over 0.50 m, 10.40 g/t Au over 0.50 m, and 2.21 g/t Au over 0.50 m

    7/8/26 5:15:00 PM ET
    $ODV
    Precious Metals
    Basic Materials

    Osisko Development Announces Results of Annual and Special Meeting of Shareholders and Grant of Deferred Share Units

    MONTREAL, June 24, 2026 (GLOBE NEWSWIRE) -- Osisko Development Corp. (NYSE:ODV, TSXV:ODV) ("Osisko Development" or the "Company") announces below the results of its annual and special meeting of shareholders of the Company (the "Meeting") held on June 23, 2026. Further information regarding the business of the Meeting is contained in the Company's management information circular dated May 11, 2026 (the "Circular"), which is available on SEDAR+ (www.sedarplus.ca) under the Company's issuer profile. A total of 226,058,370 common shares were voted at the Meeting, representing approximately 74.19% of the total issued and outstanding common shares of the Company as of the record date of the

    6/24/26 8:10:00 AM ET
    $ODV
    Precious Metals
    Basic Materials

    $ODV
    SEC Filings

    View All

    SEC Form 6-K filed by Osisko Development Corp.

    6-K - Osisko Gold Group Inc. (0001431852) (Filer)

    7/20/26 7:27:10 PM ET
    $ODV
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Osisko Development Corp.

    6-K - Osisko Gold Group Inc. (0001431852) (Filer)

    7/16/26 4:27:32 PM ET
    $ODV
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Osisko Development Corp.

    6-K - Osisko Development Corp. (0001431852) (Filer)

    7/15/26 8:39:47 AM ET
    $ODV
    Precious Metals
    Basic Materials

    $ODV
    Leadership Updates

    Live Leadership Updates

    View All

    Osisko Development Announces Results of Annual and Special Meeting of Shareholders and Grant of Deferred Share Units

    MONTREAL, June 24, 2026 (GLOBE NEWSWIRE) -- Osisko Development Corp. (NYSE:ODV, TSXV:ODV) ("Osisko Development" or the "Company") announces below the results of its annual and special meeting of shareholders of the Company (the "Meeting") held on June 23, 2026. Further information regarding the business of the Meeting is contained in the Company's management information circular dated May 11, 2026 (the "Circular"), which is available on SEDAR+ (www.sedarplus.ca) under the Company's issuer profile. A total of 226,058,370 common shares were voted at the Meeting, representing approximately 74.19% of the total issued and outstanding common shares of the Company as of the record date of the

    6/24/26 8:10:00 AM ET
    $ODV
    Precious Metals
    Basic Materials

    Osisko Development Appoints Vice President, Sustainable Development

    MONTREAL, May 19, 2026 (GLOBE NEWSWIRE) -- Osisko Development Corp. (NYSE:ODV, TSXV:ODV) ("Osisko Development" or the "Company") is pleased to announce the appointment of Mr. Greg Perrins as Vice President, Sustainable Development, effective May 18, 2026. "We are pleased to welcome Greg to the Osisko Development team, where his deep knowledge of and experience in Indigenous relations and public sector engagement in BC will further strengthen our approach to sustainable project development," stated Sean Roosen, Chairman and CEO. Mr. Perrins is an Indigenous relations professional with over 15 years of experience in leadership roles across the natural resource sector in British Columbia. M

    5/19/26 7:00:00 AM ET
    $ODV
    Precious Metals
    Basic Materials

    Osisko Development Appoints Vice President, Construction Contracting and Commercial

    MONTREAL, May 04, 2026 (GLOBE NEWSWIRE) -- Osisko Development Corp. (NYSE:ODV, TSXV:ODV) ("Osisko Development" or the "Company") is pleased to announce the appointment of Ms. Sarah MacDonald as Vice President, Construction Contracting and Commercial, effective immediately. "Sarah's appointment to the Osisko Development team further strengthens our execution capabilities, which will be instrumental as we continue to advance the Cariboo Gold Project," stated Sean Roosen, Chairman and CEO. Ms. MacDonald is a senior legal professional with more than 18 years of experience in leadership roles spanning legal, contract and corporate affairs. Ms. MacDonald joins from Dumas Contracting Ltd., a ST

    5/4/26 5:00:00 PM ET
    $ODV
    Precious Metals
    Basic Materials

    $ODV
    Financials

    Live finance-specific insights

    View All

    Osisko Development Announces Optimized Feasibility Study for Permitted Cariboo Gold Project with C$943 Million After-Tax NPV5% and 22.1% IRR at US$2,400/oz Base Case Gold Price; at US$3,300/oz Spot Gold C$2.1 Billion After-Tax NPV5% and 38.0% IRR

    (All dollar amounts are expressed in CAD dollars, unless stated otherwise) HIGHLIGHTS1 Robust returns with base case after-tax NPV5% of $943 million, unlevered after-tax IRR of 22.1% and payback2 of 2.8 years at $2,400/oz gold price assumption. Using spot gold price of $3,300/oz, NPV5% improves to $2,066 million, IRR 38.0%, and payback2 of 1.6 yearsAverage annual production of ~190,000 ounces of gold over a 10-year mine life (202,000 ounces in the first 5 years) with first gold anticipated in H2 2027, assuming construction commences in Q3 2025, subject to progress on ongoing project financing discussionsAverage TCC of US$947/oz and AI

    4/28/25 7:00:00 AM ET
    $ODV
    Precious Metals
    Basic Materials

    BTV Features: Champion Iron Limited, Defence Therapeutics, Nouveau Monde Graphite, Talisker Resources, Osisko Development & more on FOX Business News

    Vancouver, British Columbia--(Newsfile Corp. - May 4, 2023) - On FOX Business News broadcast on Sunday, May 7 at 5:30 ET - BTV - Business Television interviews emerging companies in the markets with the following companies: Cannot view this video? Visit:https://www.youtube.com/watch?v=1GTcEUiLUzUChampion Iron Limited (OTCQX:CIAFF) (TSX:CIA) (ASX: CIA) - BTV checks in with Champion Iron, a leading producer of high-purity iron ore contributing to decarbonize the steel industry. Its Québec-based mine recently completed a US$1.6B expansion, doubling production to 15M tonnes per year and possesses a net debt-free balance sheet with recent dividends to shareholders. Defence Therapeutics Inc. (OTC

    5/4/23 9:00:00 AM ET
    $NMG
    $ODV
    Other Metals and Minerals
    Basic Materials
    Precious Metals

    $ODV
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G filed by Osisko Development Corp.

    SC 13G - Osisko Development Corp. (0001431852) (Subject)

    2/9/24 9:28:31 AM ET
    $ODV
    Precious Metals
    Basic Materials