• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Oracle, BorderPlex, and Bloom Energy to Power Project Jupiter with Cleaner, Water-Efficient Fuel Cell Technology

    4/27/26 4:05:00 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology
    Get the next $ORCL alert in real time by email

    AI data center campus in Doña Ana County will preserve electricity rates for residents, dramatically reduce water use, and protect local air quality

    AUSTIN, Texas, April 27, 2026 /PRNewswire/ -- Oracle and BorderPlex Digital Assets today announced Project Jupiter will utilize Bloom Energy fuel cells to fully power the AI data center campus in Doña Ana County, New Mexico. As part of Oracle and Bloom's previously announced expanded partnership, the data center will be supported by up to 2.45 GW of installed Bloom fuel cell capacity. This updated power design will replace Project Jupiter's previously planned gas turbines and diesel generators and consolidate the facility into one single microgrid campus.

    (PRNewsfoto/Oracle)

    Fuel cells generate electricity without combustion, meaning the Bloom microgrid is highly efficient with low emissions and water use. Compared to its previously planned gas turbines, Project Jupiter with the Bloom microgrid will reduce NOₓ emissions by approximately 92% and will use a negligible amount of water.

    "We are excited to move forward with this updated energy solution, which reflects our commitment to both the latest innovation and community priorities as we advance the next generation of AI infrastructure," said Mahesh Thiagarajan, executive vice president, Oracle Cloud Infrastructure. "Bloom's fuel cell technology enables us to deliver highly reliable on-site power with a lower environmental footprint—supporting the project's performance needs while contributing to stronger environmental outcomes."

    For BorderPlex, the announcement marks an important milestone in a vision that began with a simple conviction: that industrial land in the southern New Mexico desert could become a national platform for advanced computing, cleaner energy, and long-term economic growth. BorderPlex will continue supporting Project Jupiter's success in New Mexico while advancing additional growth infrastructure opportunities and other clean-energy initiatives in the state and beyond, including solar, storage and geothermal opportunities. BorderPlex and Oracle will continue working together on future initiatives that expand access to the infrastructure needed to support these priorities.

    "Project Jupiter started with a belief that Doña Ana County could become a Tier 1 industrial engine for New Mexico," said Lanham Napier, chairman, BorderPlex Digital Assets. "We said we could help bring cleaner energy, stronger infrastructure, more jobs and new investment to southern New Mexico, and that vision is becoming reality. With this announcement, Project Jupiter is becoming a platform for better jobs, stronger infrastructure, and generational opportunity in a region with the talent, work ethic, and ambition to help lead New Mexico's next chapter of growth."

    "Bloom has rapidly become the platform of choice for powering AI data centers responsibly," said Aman Joshi, chief commercial officer, Bloom Energy. "Bloom's fuel cell technology will power what is expected to be one of the largest data center microgrids operating in the United States at the time of completion. Our energy solution not only dramatically reduces water use, it is also cleaner, quieter, and helps protect electricity rates for local residents. This is a model that can be replicated across America—it is digital power for the digital age."

    Oracle will continue to bear all energy costs for Project Jupiter, ensuring the initiative has no impact on residents' electricity rates or grid stability. Together with the data center's closed-loop, non-evaporative cooling systems designed to minimize day-to-day water use, the fuel cell solution addresses community priorities around air quality and water stewardship. 

    Project Jupiter has also committed $50 million to help repair, upgrade, and improve local water systems; $360 million in direct support for schools, infrastructure, and local services; and $6.9 million to fund workforce development, the Boys and Girls Club of Las Cruces, clean drinking water, the community college, and habitat restoration.

    Construction continues to move forward on schedule. Over the life of the project, Oracle expects Project Jupiter to create 4,000 construction jobs and support 1,500 ongoing positions on-site and in the surrounding community, prioritizing local hiring, opportunities for New Mexico's skilled trades and union workforce, local suppliers, local contractors, and workforce partnerships that help New Mexicans access these opportunities.

    Additional Resources

    • Read more about Project Jupiter's approach to water
    • Learn about fuel cell technology
    • Read more about Oracle's data center projects

    About Oracle

    Oracle offers integrated suites of applications plus secure, autonomous infrastructure in the Oracle Cloud. For more information about Oracle (NYSE:ORCL), please visit us at www.oracle.com.

    About Bloom Energy

    Bloom Energy empowers enterprises to meet soaring energy demands and responsibly take charge of their power needs. The company's solid oxide fuel cell systems provide ultra-resilient, highly scalable onsite electricity for Fortune 500 customers around the world, including data centers, semiconductor manufacturing, large utilities, and other commercial and industrial sectors as well as mission-critical organizations in local communities, such as hospitals, college campuses and retailers. Headquartered in Silicon Valley, Bloom Energy employs more than 2,000 people worldwide and manufactures its systems in the United States. For more information, visit BloomEnergy.com.

    About BorderPlex Digital Assets

    BorderPlex Digital Assets is pioneering the development of Growth Infrastructure Campuses, combining land, power, industrial cooling, fiber, and compute in a single location. This unified platform is purpose-built to support innovation from data centers, advanced manufacturing, and logistics. The company's flagship campus in Santa Teresa, New Mexico, represents a new model for growth infrastructure – powering economic development and addressing critical resource challenges for the community.

    Trademarks

    Oracle, Java, MySQL, and NetSuite are registered trademarks of Oracle Corporation. NetSuite was the first cloud company—ushering in the new era of cloud computing.

    Forward-Looking Statements Disclaimer

    Statements in this article relating to Oracle's future plans, expectations, beliefs, and intentions are "forward-looking statements" and are subject to material risks and uncertainties. Many factors could affect Oracle's current expectations and actual results, and could cause actual results to differ materially. A discussion of such factors and other risks that affect Oracle's business is contained in Oracle's Securities and Exchange Commission (SEC) filings, including Oracle's most recent reports on Form 10-K and Form 10-Q under the heading "Risk Factors." These filings are available on the SEC's website or on Oracle's website at http://www.oracle.com/investor. All information in this article is current as of April 27, 2026 and Oracle undertakes no duty to update any statement in light of new information or future events.

    Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-cleaner-water-efficient-fuel-cell-technology-302754698.html

    SOURCE Oracle Corporation

    Get the next $ORCL alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $ORCL

    DatePrice TargetRatingAnalyst
    4/24/2026$225.00Outperform
    Wedbush
    4/10/2026Buy → Neutral
    Cleveland Research
    3/24/2026$200.00Buy
    BofA Securities
    3/11/2026$210.00Neutral → Overweight
    Analyst
    3/11/2026$205.00 → $200.00Outperform
    BMO Capital Markets
    3/11/2026$185.00 → $210.00Outperform
    Oppenheimer
    2/25/2026$185.00Perform → Outperform
    Oppenheimer
    2/9/2026Buy → Hold
    Melius
    More analyst ratings

    $ORCL
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    SEC Form 4 filed by EVP, Chief Legal Officer Levey Stuart

    4 - ORACLE CORP (0001341439) (Issuer)

    4/28/26 4:57:16 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    SEC Form 4 filed by Levey Stuart

    4 - ORACLE CORP (0001341439) (Issuer)

    4/20/26 5:33:53 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    SEC Form 4 filed by Henley Jeffrey

    4 - ORACLE CORP (0001341439) (Issuer)

    4/17/26 8:15:49 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    $ORCL
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Director Fairhead Rona Alison bought $112,258 worth of shares (480 units at $233.87), increasing direct ownership by 2% to 22,110 units (SEC Form 4)

    4 - ORACLE CORP (0001341439) (Issuer)

    7/9/25 4:39:51 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    Director Boskin Michael J bought $111,145 worth of shares (1,682 units at $66.08), increasing direct ownership by 2% to 92,458 units (SEC Form 4)

    4 - ORACLE CORP (0001341439) (Issuer)

    3/21/25 8:43:30 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    Director Moorman Charles W bought $947,913 worth of shares (5,500 units at $172.35) (SEC Form 4)

    4 - ORACLE CORP (0001341439) (Issuer)

    2/14/25 4:41:16 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    $ORCL
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    $ORCL
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    $ORCL
    SEC Filings

    View All

    Oracle, BorderPlex, and Bloom Energy to Power Project Jupiter with Cleaner, Water-Efficient Fuel Cell Technology

    AI data center campus in Doña Ana County will preserve electricity rates for residents, dramatically reduce water use, and protect local air qualityAUSTIN, Texas, April 27, 2026 /PRNewswire/ -- Oracle and BorderPlex Digital Assets today announced Project Jupiter will utilize Bloom Energy fuel cells to fully power the AI data center campus in Doña Ana County, New Mexico. As part of Oracle and Bloom's previously announced expanded partnership, the data center will be supported by up to 2.45 GW of installed Bloom fuel cell capacity. This updated power design will replace Project Jupiter's previously planned gas turbines and diesel generators and consolidate the facility into one single microgri

    4/27/26 4:05:00 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    Related Digital Announces Financing for $16 Billion Oracle Data Center Project in Saline Township, Michigan

    Related Digital and Funds Affiliated with Blackstone Commit Equity to Fund Project; Fixed Rate, Long-Term Debt Financing Anchored by PIMCO-Managed Funds and AccountsCampus Creates Thousands of Union Construction Jobs and Significant Community Investment DALLAS, April 24, 2026 /PRNewswire/ -- Related Digital, a vertically integrated data center development and investment platform, and Blackstone (NYSE:BX) announced today that financing has been secured for Related Digital's $16 billion data center campus in Saline Township, Michigan, purpose-built for Oracle. The financing includes equity from Related Digital and funds affiliated with Blackstone, and fixed-rate, long term debt financing ancho

    4/24/26 7:17:00 PM ET
    $BAC
    $BX
    $ORCL
    Major Banks
    Finance
    Investment Managers
    Computer Software: Prepackaged Software

    Oracle Expands Powerful AI Capabilities in Oracle AI Database@Google Cloud to Supercharge Enterprise Data Innovation

    Secure, natural language access to Oracle data through Gemini Enterprise speeds insights without writing SQL AUSTIN, Texas, April 22, 2026 /PRNewswire/ -- Oracle has expanded its partnership with Google Cloud to give joint customers new ways to operationalize AI across enterprise data. Under the expanded partnership, the Oracle AI Database Agent for Gemini Enterprise gives Oracle AI Database@Google Cloud customers a simpler way to interact with their Oracle data using natural language. In addition, Oracle AI Database@Google Cloud now offers new capabilities and broader regional availability as global organizations, such as Worldline, use it to drive innovation and accelerate cloud migrations

    4/22/26 8:00:00 AM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    Wedbush initiated coverage on Oracle with a new price target

    Wedbush initiated coverage of Oracle with a rating of Outperform and set a new price target of $225.00

    4/24/26 8:06:10 AM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    Oracle downgraded by Cleveland Research

    Cleveland Research downgraded Oracle from Buy to Neutral

    4/10/26 8:47:06 AM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    BofA Securities resumed coverage on Oracle with a new price target

    BofA Securities resumed coverage of Oracle with a rating of Buy and set a new price target of $200.00

    3/24/26 8:49:56 AM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    SEC Form 11-K filed by Oracle Corporation

    11-K - ORACLE CORP (0001341439) (Filer)

    4/24/26 4:10:13 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    Oracle Corporation filed SEC Form 8-K: Regulation FD Disclosure

    8-K - ORACLE CORP (0001341439) (Filer)

    4/6/26 8:12:11 AM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    Amendment: SEC Form SCHEDULE 13G/A filed by Oracle Corporation

    SCHEDULE 13G/A - ORACLE CORP (0001341439) (Subject)

    3/27/26 11:08:37 AM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    $ORCL
    Leadership Updates

    Live Leadership Updates

    View All

    Oracle Appoints Hilary Maxson as Chief Financial Officer

    AUSTIN, Texas, April 6, 2026 /PRNewswire/ -- Oracle Corporation (NYSE:ORCL) today announced the appointment of Hilary Maxson as Chief Financial Officer (CFO). Maxson will report to Chief Executive Officer (CEO) Clay Magouyrk and lead the company's global finance organization, effective April 6, 2026. Maxson joins Oracle during a period of rapid growth as customer demand for cloud infrastructure exceeds supply. This growing demand for AI training and inferencing, multicloud database, and cloud applications has given Oracle the opportunity to build and scale its cloud infrastructu

    4/6/26 8:00:00 AM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    Oracle Scales Up Nashville Offices to Support Rapid Growth

    New lease at the Neuhoff Development adds over 116,000 square feet to Oracle's Nashville footprintAUSTIN, Texas, March 26, 2026 /PRNewswire/ -- To accommodate future growth of its Nashville workforce, Oracle has signed a new 116,000 square foot lease within The Neuhoff District, at 1320 Adams Street. With this latest investment, Oracle will bring its office capacity in Nashville to about 2,000 seats across three locations, marking significant progress in the company's plans to create thousands of new tech jobs and become a cornerstone of the local economy. "New candidates as wel

    3/26/26 6:49:00 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    Health Systems Simplify Secure Data Exchange with Oracle Health

    New Oracle Health Connection Hub delivers single, unified console to enable data sharing control, auditing, and governance so health systems can easily manage a broad range of interoperability services Early adopters see 50 percent reduction in processing times of Social Security Administration disability benefit claims AUSTIN, Texas, Oct. 9, 2025 /PRNewswire/ -- Oracle Health Connection Hub is now generally available for U.S. healthcare providers, enabling them to use a single console to more easily onboard, access, and manage preferences for Oracle Health interoperability solutions. The latest step in Oracle's strategy to increase interoperability and reduce friction between payers and pr

    10/9/25 9:00:00 AM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    $ORCL
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G/A filed by Oracle Corporation (Amendment)

    SC 13G/A - ORACLE CORP (0001341439) (Subject)

    2/9/24 4:33:37 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    SEC Form SC 13G/A filed by Oracle Corporation (Amendment)

    SC 13G/A - ORACLE CORP (0001341439) (Subject)

    2/10/23 4:31:02 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    SEC Form SC 13G/A filed by Oracle Corporation (Amendment)

    SC 13G/A - ORACLE CORP (0001341439) (Subject)

    2/10/22 8:28:11 AM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    $ORCL
    Financials

    Live finance-specific insights

    View All

    Oracle Announces Fiscal Year 2026 Third Quarter Financial Results

    Q3 Remaining Performance Obligations $553 billion, up 325% year-over-year in USDQ3 GAAP Earnings per Share up 24% to $1.27, Non-GAAP Earnings per Share up 21% to $1.79Q3 Total Revenue $17.2 billion, up 22% in USD and up 18% in constant currencyQ3 Cloud Revenue (IaaS plus SaaS) $8.9 billion, up 44% in USD and up 41% in constant currency Q3 Cloud Infrastructure Revenue (IaaS) $4.9 billion, up 84% in USD and up 81% in constant currencyQ3 Oracle Cloud Database (IaaS) Revenue up 35%, Multicloud Database Revenue up 531% in USDQ3 Cloud Application (SaaS) Revenue $4.0 billion, up 13% in USD and up 11% in constant currencyQ3 Fusion Cloud ERP (SaaS) Revenue $1.1 billion, up 17% in USD and up 14% in co

    3/10/26 4:05:00 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    Oracle Sets the Date for its Third Quarter Fiscal Year 2026 Earnings Announcement

    Earnings Results to be released on March 10, 2026, After the Close of the MarketAUSTIN, Texas, March 3, 2026 /PRNewswire/ -- Oracle Corporation today announced that its third quarter fiscal year 2026 results will be released on Tuesday, March 10th, after the close of the market. Oracle will host a conference call and live webcast at 4:00 p.m. Central Time to discuss the financial results.  The live webcast will be available on the Oracle Investor Relations website at www.oracle.com/investor. About OracleOracle offers integrated suites of applications plus secure, autonomous infr

    3/3/26 4:00:00 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology

    Oracle Announces Fiscal Year 2026 Second Quarter Financial Results

    Q2 Remaining Performance Obligations $523 billion, up 438% in USDQ2 GAAP Earnings per Share up 91% to $2.10, Non-GAAP Earnings per Share up 54% to $2.26Q2 Total Revenue $16.1 billion, up 14% in USD and up 13% in constant currencyQ2 Cloud Revenue (IaaS plus SaaS) $8.0 billion, up 34% in USD and up 33% in constant currencyQ2 Cloud Infrastructure (IaaS) Revenue $4.1 billion, up 68% in USD and up 66% in constant currencyQ2 Cloud Application (SaaS) Revenue $3.9 billion, up 11% in both USD and constant currencyQ2 Fusion Cloud ERP (SaaS) Revenue $1.1 billion, up 18% in USD and up 17% in constant currencyQ2 NetSuite Cloud ERP (SaaS) Revenue $1.0 billion, up 13% in both USD and constant currencyAUSTI

    12/10/25 4:05:00 PM ET
    $ORCL
    Computer Software: Prepackaged Software
    Technology