• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    GoldMining Announces Positive PEA Highlighting $532 Million After-Tax NPV and 42% IRR at its São Jorge Project, Brazil

    6/11/26 6:30:00 AM ET
    $GLDG
    Precious Metals
    Basic Materials
    Get the next $GLDG alert in real time by email

    VANCOUVER, BC, June 11, 2026 /CNW/ - GoldMining Inc. (TSX:GOLD) (NYSE:GLDG) (the "Company" or "GoldMining") is pleased to announce the results of a preliminary economic assessment ("PEA") on its São Jorge Project (the "Project"), located in Pará State, Brazil. 

    All currency amounts herein are in US dollars unless otherwise indicated.

    PEA Highlights

    • Strong Base Case Economics: The PEA sets out a base case scenario with an after-tax net present value at a 5% discount rate ("NPV5%") of $532 million and an after-tax internal rate of return ("IRR") of 42.4% utilizing base case gold price of $3,500 per ounce ("oz") and an initial payback of 2.8 years.



    • Leverage to Gold Price: At spot gold prices ($4,400/oz), the after-tax NPV5% increases to $836.8 million, yielding an IRR of 58.6% and an initial payback of just 2.4 years.



    • High Capital Efficiency & Infrastructure Advantage: Initial capital is estimated at a highly manageable $202 million (including a 25% contingency), representing an attractive 2.6x base case NPV5% to initial capital ratio. This relatively low capital hurdle is directly supported by the Project's ideal location, situated adjacent to existing power lines, paved highways, and an available skilled workforce.



    • Balance Sheet Backing: The Company's strong balance sheet comprising approximately $183 million1 in cash and publicly traded securities positions it well to advance the Project through the next stages of development.



    • Cash Generator for the Company: The PEA envisages a robust internal free cash flow, supported by a stable gold production profile averaging an estimated 51,250 oz annually over a 10.6-year life of mine ("LOM"), with peak gold production of 57,200 oz per year in years 2 through 4.



    • Resilient Cost Profile: The PEA highlights relatively strong estimated margins, supported by an estimated life of mine All-In Sustaining Cost ("AISC") of $1,464/oz.



    • Conventional Operation: The PEA contemplates a conventional open-pit truck-and-shovel operation and a processing rate of 5,500 tonnes per day. A proven processing flowsheet utilizing standard gravity and leach circuits achieves high metallurgical recoveries of 90% Au.



    • Advancing Pre-Feasibility Studies: The Company plans to expeditiously commence pre-feasibility studies as the Project is further de-risked and moves forward with permitting towards a construction decision.

    Alastair Still, CEO of GoldMining commented, "The São Jorge PEA marks a significant milestone in the advancement of our corporate strategy. By combining a manageable $202 million initial capital investment with a robust $532 million base case NPV5%, we have outlined a highly efficient, construction-track asset on a regional-scale property that retains significant exploration potential for additional resource growth. More than just a standalone project, the PEA highlights that São Jorge has the potential for resilient margins and rapid payback potential to become a cornerstone self-funding asset for us. With robust economics, we look forward to rapidly advancing and de-risking the Project with permitting and pre-feasibility studies to unlock further value across our gold-focused multi-million ounce Americas portfolio."

    The PEA is preliminary in nature, and there is no certainty that the reported results will be realized. The PEA includes Inferred Mineral Resources, which are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that this PEA, including the conceptual economics set out therein, will be realized.

    Table 1: Summary of São Jorge PEA Selected Production Metrics

    São Jorge PEA Key Metrics





    Production

    Result 

    Units 

    Mine life

    10.6

    Years 

    LOM Strip ratio (waste:processed material)

    4.27

    Ratio 

    Total mined material

    109.1

    Mt

    Total processed material

    20.7

    Mt

    Nominal process plant rate

    5,500

    tpd

    Gold Production





    Average gold feed grade

    0.91

    g/t

    Average gold metallurgical recovery

    90.0

    %

    Total gold produced

    543.2

    koz

    Average annual gold production  (Years 1-5)

    53.4

    koz

    LOM

    51.2

    koz

    Numbers may not add due to rounding.

    Table 2: Summary of São Jorge PEA Selected Financial Metrics

    São Jorge PEA Key Financial Metrics





    Operating Costs (OPEX)

    Units

    Result

    Mining unit cost

    $/t mined

    $/t milled

    1.98

    10.40

    Process unit cost

    $/t milled

    10.44

    General and Administrative (G&A) unit cost

    $/t milled

    1.29

    Royalty (including government royalites)

    $/t milled

    4.21

    Other (including maintenance and contingency)

    $/t milled

    8.55

    Total OPEX

    $/t milled

    34.88

    Transport & Refining Cost

    $/t milled

    0.16

    Total Cash Cost2

    $/t milled

    $/oz payable

    35.04

    1,344

    All-In Sustaining Costs (AISC)3

    $/oz payable

    1,464

    Capital Expenditures (CAPEX)

    Units

    Result

    Initial capital expenditure (includes pre-strip)

    $M

    202.2

    Sustaining capital expenditure

    $M

    53.0

    Closure costs

    $M

    12.0

    Total Capital

    $M

    267.2

    Base Case Economics ($3,500/oz Au)

    Units

    Result

    Net present value (NPV5%) – pre-tax

    $M

    645.7

    Internal rate of return (IRR) – pre-tax

    %

    48.9

    Net present value (NPV5%) – after-tax

    $M

    532.5

    Internal rate of return (IRR) – after-tax

    %

    42.4

    Payback – after-tax

    Years

    2.83

    Spot Price Economics ($4,400/oz Au) 3

    Units

    Result

    Net present value (NPV5%) – pre-tax

    $M

    1,004.8

    Internal rate of return (IRR) – pre-tax

    %

    67.3

    NPV5% – after-tax

    $M

    836.8

    IRR – after-tax

    %

    58.6

    Payback – after-tax

    Years

    2.38



    Numbers may not add due to rounding.

    (1) Total Cash Cost consists of total operating costs plus transportation and refining costs.

    (2) AISC includes Total Cash Cost plus sustaining capital and closure costs.

    (3) Spot price determined on June 9, 2026 based on the 10-day trailing average rounded down to the nearest hundred.

    São Jorge PEA Summary

    The São Jorge Project is located in the southeastern portion of Pará State, Brazil, in the municipality of Novo Progresso, approximately 460 km southeast of the main regional city of Santarem and approximately 70 km north of the town of Novo Progresso. Regional highway BR-163, an all-weather paved road, passes through the Project area. The city of Itaituba is located approximately 250 km north of the Project.

    The current mineral resource estimate for São Jorge was reported in the Company's technical report titled "NI 43-101 Technical Report São Jorge Project, Para State, Brazil" dated effective January 28, 2025. The PEA is based on such estimate.

    The PEA considers a conventional drill, blast, load, and haul open pit operation mining an average of 27,000 tpd (9.9 million tonnes per annum (Mtpa) over the 10.6 year life of mine. It contemplates that resources will be processed at a nominal rate of 5,500 tpd (1.9 Mtpa) at an average strip ratio of 4.27:1. Conventional gravity and leach circuit is planned to generate gold doré on site.

    The PEA includes on-site development including mining, haul roads, access roads, process facilities, tailings and waste storage facilities, and related ancillary facilities. Construction is anticipated to take approximately two years with an initial capital expenditure of $202.2 million, including a healthy 25% contingency, with operations continuing for 10.6 years. Sustaining capital expenditures over the LOM are expected to be approximately $53 million, consisting of a mix of mining capital equipment and staged expansion of the tailings and waste facilities. Closure costs have been estimated at $12 million. LOM operating costs are expected to average $34.88/t of material processed.

    Under the PEA, highest metal production occurs in the initial five years of production averaging 53.4 koz Au annual production. LOM average production is 51.2 koz Au.

    Table 3: Estimated Capital Breakdown

     Capital Area

    Initial

    ($M)

    Sustaining

     ($M)

    Total

     ($M)

    Site General & Pre-Construction

    33.0



    33.0

    Power Distribution

    16.8



    16.8

    Mining & Equipment

    11.6

    30.7

    42.3

    Process Plant

    47.0

    9.4

    56.4

    Tailing Storage & Water Management

    4.5



    4.5

    Indirect Costs

    13.9



    13.9

    Owner's Cost and General Services

    40.5



    40.5

    Contingency (25%)

    34.9

    13.0

    47.9

    Sub-total Capital

    202.2

    53.0

    255.2

    Mine Closure



    12.0

    12.0

    Total Capital

    202.2

    65.0

    267.2

    Numbers may not add due to rounding



    Figure 1: Mined Material Schedule

    Figure 2: Process Schedule

    The São Jorge Deposit

    The São Jorge Gold Project is located in the Tapajós gold district (see Figure 3) in the south-central portion of the Amazon Craton. The São Jorge gold deposit is a granite-hosted, intrusion-related gold mineral system which is a similar style to the Tocantinzinho gold mine owned and operated by G Mining located approximately 80 km northwest of São Jorge, that commenced commercial production in 2024 and produced 171,871 ounces of gold in 2025.

    Exploration activities at the Project carried out by the Company over the past two years have successfully delineated several new exploration targets comprising gold ± copper ± molybdenum ± silver soil geochemical anomalies, which cumulatively outline a large mineral system (see news releases dated March 18, 2025 and April 14, 2025). The São Jorge mineral system is defined by a comprehensive exploration data set which the Company has developed over previous systematic exploration campaigns. Surrounding the currently delineated São Jorge deposit, which has a defined 1.4 km strike length, the broader mineral system comprises a zone of contiguous surface geochemical anomalies over an area of 12 km x 7 km, which the Company interprets to be the surface expression of a broad intrusion related gold system.

    Figure 3: São Jorge Project location

    Mineral Resource Estimate

    The PEA is based on the Company's existing previously disclosed mineral resource estimate, which is summarized in the table below.

    Table 4: Pit Constrained Mineral Resource Estimate

    Category

    Tonnage

    (000 t)

    Grade

    (g/t Au)

    Contained Metal

    (000 oz Au)

    Indicated  

    19,418

    1.00

    624

    Inferred

    5,557

    0.72

    129



    Notes:

    1.

    See technical report titled "NI 43-101 Technical Report São Jorge Project, Para State, Brazil" dated effective January 28, 2025.

    2.

    CIM (2014) definitions were followed for Mineral Resources.

    3.

    Mineral Resource are estimated at a break-even cut-off grade of 0.27 g/t Au for classified blocks above a constraining pit shell.

    4.

    Mineral Resources are estimated using a long-term gold price of US$1,950 per ounce.

    5.

    A minimum mining width of five meters was used.

    6.

    There are no Mineral Reserves estimated at São Jorge Project. Mineral Resources that are not Mineral Reserves have not demonstrated economic viability.

    7.

    Numbers may not add due to rounding.

    8.

    The Qualified Person (QP) of the mineral resource estimate is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the mineral resource estimates.

    For a description of the data verification, assay procedures and the quality assurance program and quality control measures applied by the Company, please see the Company's Annual Information Form for the year ended November 30, 2025, filed under the Company's profile on SEDAR+ at www.sedarplus.ca. Further information about the PEA referenced in this news release, including information in respect of data verification, key assumptions, parameters, risks and other factors, will be contained in a technical report, which will be filed by the Company in respect of the PEA within 45 days under its profile at SEDAR+ at www.sedarplus.ca.

    Opportunities

    This new PEA highlights strong potential for the advancement of the Project and sets out several opportunities for future study which may further enhance project value, including:

    Opportunity

    Potential Benefits









    Metallurgical test work & Process design

    Variability test work to optimize process flowsheet and improve gold

    recoveries.





    Infill Drilling

    Increase confidence in the geological models and controls on and

    interpolation of grade; may increase resource grade overall and

    convert mineral resources to higher categories.









    Exploration Drilling

    Expansion opportunities at the existing deposits to delineate

    additional resources.

















    Geotechnical test work

    Optimize pit wall slopes and potentially reduce strip ratio and to

    assess potential waste rock and tailings storage sites.









    Infrastructure design & Scheduling

    Optimize site layout, material handling and pit backfill to reduce

    LOM operating costs.









    Environmental & Sustainability Governance (ESG)

    Environmental baseline & heritage studies, and community

    stakeholder engagement to inform the local community about the

    potential mining opportunity and economic benefits.









    Qualified Persons

    The PEA was prepared for the Company by Beck Nader,DSc, MSc.,FAIG, CBRR , who is independent of the Company and a Qualified Person, as such term is defined in NI 43-101.

    The Mineral Resources were estimated by Reno Pressacco, M.Sc. (A), P.Geo., FGC, who is independent of the Company and a Qualified Person, as such term is defined in NI 43-101.

    The specific sections of the technical report for which each such Qualified Person is responsible will be set out in the technical report relating to the PEA. Each such Qualified Person has reviewed and approved the scientific and technical information regarding the PEA as disclosed in this news release.

    Imola Götz, M.Sc. P.Eng., F.E.C., Vice President, Project Development of the Company and a Qualified Person, as such term is defined in NI 43-101, has supervised the preparation of this news release and has reviewed and approved the scientific and technical information contained herein.

    About GoldMining Inc.

    GoldMining Inc. is a public mineral exploration company focused on acquiring and developing gold assets in the Americas. Through its disciplined acquisition strategy, GoldMining now controls a diversified portfolio of resource-stage gold and gold-copper projects in Canada, the U.S.A., Brazil, Colombia, and Peru.

    Notice to Readers

    Disclosure regarding the Project, including the PEA and Mineral Resource Estimates included herein, has been prepared by the Company in accordance with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for public disclosure by issuer of scientific and technical information concerning mineral projects. NI 43-101 differs significantly from the disclosure requirements of the United States Securities and Exchange Commission ("SEC") generally applicable to U.S. companies subject to the SEC's disclosure requirements. For example, the terms "Indicated Mineral Resource" and "Inferred Mineral Resource" are defined in NI 43-101 by reference to the guidelines set out in the CIM Definition Standards on Mineral Resources and Mineral Reserves. Accordingly, information contained herein or in the Company's descriptions of its projects may not be comparable to similar information made public by U.S. companies reporting pursuant to SEC disclosure requirements.

    Investors are cautioned not to assume that all or any part of "Measured" or "Indicated" Mineral Resource will ever be converted into "reserves". Investors should also understand that "Inferred Mineral Resources" have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. Under Canadian rules, estimated "Inferred Mineral Resources" may not form the basis of feasibility or pre-feasibility studies except in rare cases. 

    For further information regarding the Company's projects and the resource estimates disclosed herein, please refer to the Company's most recent Annual Information Form and the technical reports filed under the Company's profile at www.sedarplus.ca and www.sec.gov.

    Forward-Looking Statements

    Certain of the information contained in this news release constitutes "forward-looking information" and "forward-looking statements" within the meaning of applicable Canadian and U.S. securities laws ("forward-looking statements"), which involve known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance and achievements to be materially different from the results, performance or achievements expressed or implied therein. Forward-looking statements, which are all statements other than statements of historical fact, include, but are not limited to the results of the PEA, the Company's plans and expectations regarding future opportunities and proposed work at the Project and the Company's other plans and expectations regarding the Project. Forward-looking statements are based on the then-current expectations, beliefs, assumptions, estimates and forecasts about the business and the markets in which GoldMining operates. Investors are cautioned that all forward-looking statements involve risks and uncertainties, including: the inherent risks involved in the exploration and development of mineral properties, fluctuating metal prices, unanticipated costs and expenses, risks related to government and environmental regulation, social, permitting and licensing matters, and uncertainties relating to the availability and costs of financing needed in the future. These risks, as well as others, including those set forth in GoldMiningꞌs Annual Information Form for the year ended November 30, 2025, and other filings with Canadian securities regulators and the SEC, could cause actual results and events to vary significantly. Accordingly, readers should not place undue reliance on forward-looking statements. There can be no assurance that forward-looking statements, or the material factors or assumptions used to develop such forward-looking statements, will prove to be accurate. The Company does not undertake to update any forward-looking statements, except in accordance with applicable securities law.

    GoldMining Inc. Logo

    Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/goldmining-announces-positive-pea-highlighting-532-million-after-tax-npv-and-42-irr-at-its-sao-jorge-project-brazil-302797434.html

    SOURCE GoldMining Inc.

    Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/June2026/11/c3978.html

    Get the next $GLDG alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $GLDG

    DatePrice TargetRatingAnalyst
    11/9/2021$6.00 → $6.25Buy
    HC Wainwright & Co.
    8/30/2021$5.75 → $6.00Buy
    HC Wainwright & Co.
    More analyst ratings

    $GLDG
    SEC Filings

    View All

    SEC Form 6-K filed by GoldMining Inc.

    6-K - GoldMining Inc. (0001538847) (Filer)

    6/25/26 7:00:54 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by GoldMining Inc.

    6-K - GoldMining Inc. (0001538847) (Filer)

    6/11/26 6:45:04 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by GoldMining Inc.

    6-K - GoldMining Inc. (0001538847) (Filer)

    6/8/26 6:32:36 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    $GLDG
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    HC Wainwright & Co. reiterated coverage on GoldMining with a new price target

    HC Wainwright & Co. reiterated coverage of GoldMining with a rating of Buy and set a new price target of $6.25 from $6.00 previously

    11/9/21 5:59:33 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    HC Wainwright & Co. reiterated coverage on GoldMining with a new price target

    HC Wainwright & Co. reiterated coverage of GoldMining with a rating of Buy and set a new price target of $6.00 from $5.75 previously

    8/30/21 6:02:26 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    Roth Capital reiterated coverage on GoldMining with a new price target

    Roth Capital reiterated coverage of GoldMining with a rating of Buy and set a new price target of $3.30 from $3.20 previously

    6/2/21 12:36:12 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    $GLDG
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    GoldMining Issues Mid-Year 2026 Shareholder Update

    VANCOUVER, BC, June 25, 2026 /CNW/ - GoldMining Inc. (TSX:GOLD) (NYSE:GLDG) (the "Company" or "GoldMining") is pleased to provide the following message from the President and CEO of GoldMining to update shareholders on the Company's recent progress in advancing and unlocking value from its portfolio of assets, while enhancing its balance sheet that includes cash and publicly traded securities. Key First-Half 2026 Highlights:Balance Sheet Strength: The Company has no debt and holds approximately US$185 million1 in cash and publicly traded securities, the balance of which almost e

    6/25/26 6:30:00 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    GoldMining Announces Positive PEA Highlighting $532 Million After-Tax NPV and 42% IRR at its São Jorge Project, Brazil

    VANCOUVER, BC, June 11, 2026 /CNW/ - GoldMining Inc. (TSX:GOLD) (NYSE:GLDG) (the "Company" or "GoldMining") is pleased to announce the results of a preliminary economic assessment ("PEA") on its São Jorge Project (the "Project"), located in Pará State, Brazil. All currency amounts herein are in US dollars unless otherwise indicated.PEA HighlightsStrong Base Case Economics: The PEA sets out a base case scenario with an after-tax net present value at a 5% discount rate ("NPV5%") of $532 million and an after-tax internal rate of return ("IRR") of 42.4% utilizing base case gold price of $3,500 per ounce ("oz") and an initial payback of 2.8 years.Leverage to Gold Price: At spot gold prices ($4,40

    6/11/26 6:30:00 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    This Gold Story Is Starting to Look Bigger Than a Few High-Grade Samples

    Equity Insider News CommentaryIssued on behalf of Golden Goose Resources Corp.Companies mentioned: Golden Goose Resources Corp. (CSE:GGR), Aya Gold & Silver Inc. (TSX:AYA) (NASDAQ:AYA), GoldMining Inc. (TSX:GOLD) (NYSE:GLDG), Dryden Gold Corp. (TSXV:DRY) (OTCQB:DRYGF), Tocvan Ventures Corp. (CSE:TOC) (OTCQB:TCVNF)KEY TAKEAWAYSGolden Goose just put real numbers on the map at Gran Esperanza. The company reported first channel-sampling results from the project in Río Negro, Argentina, including 0.70 m of 8.84 g/t gold at Bonanza, 1.14 m of 3.99 g/t gold at Chapita, and 0.72 m of 4.19 g/t gold at Genaro.The bigger point may be the growing footprint. Management said high-grade gold mineralization

    6/9/26 10:25:00 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    $GLDG
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    SEC Form 4 filed by Goldmining Inc.

    4 - GoldMining Inc. (0001538847) (Reporting)

    5/23/23 9:15:51 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    SEC Form 4 filed by Goldmining Inc.

    4 - GoldMining Inc. (0001538847) (Reporting)

    5/12/23 8:04:33 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    SEC Form 4 filed by Goldmining Inc.

    4 - GoldMining Inc. (0001538847) (Reporting)

    5/5/23 8:43:26 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    $GLDG
    Leadership Updates

    Live Leadership Updates

    View All

    GoldMining Announces 2026 Annual Meeting Voting Results

    VANCOUVER, BC, May 14, 2026 /CNW/ - GoldMining Inc. (TSX:GOLD) (NYSE:GLDG) (the "Company" or "GoldMining") is pleased to announce that shareholder voting at the Company's annual meeting of shareholders (the "Meeting") held on May 14, 2026, has resulted in the election of all of the directors listed as nominees in management's information circular dated March 23, 2026.A quorum of 27.04% of the votes attached to the outstanding shares of the Company was present in person or by proxy at the Meeting.Each of the following six nominees proposed by management was elected as a director. The results of such vote were as follows:DirectorTotal Votes ForTotal Votes% of Votes ForAmir Adnani25,742,48028,0

    5/14/26 8:53:00 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    GoldMining Appoints Imola Götz as Vice President, Project Development

    VANCOUVER, BC, March 5, 2026 /CNW/ - GoldMining Inc. (the "Company" or "GoldMining") (TSX:GOLD) (NYSE:GLDG) is pleased to announce the appointment of Imola Götz as Vice President, Project Development. Ms. Götz is a veteran mining engineer with over 30 years of international experience in both underground and open-pit mining environments including in world renowned northern Ontario gold mining camps of Hemlo and Timmins. Prior to joining the company, Ms. Götz held progressive leadership roles at Goldcorp, Newmont, Eldorado Gold, Sandstorm Gold Royalties, Horizon Copper, and most

    3/5/26 6:30:00 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    GoldMining Appoints Martin Dumont as VP, Corporate Development and Investor Relations

    VANCOUVER, BC, Jan. 22, 2026 /PRNewswire/ - GoldMining Inc. (the "Company" or "GoldMining") (TSX:GOLD, NYSE:GLDG) is pleased to announce the appointment of Martin Dumont as Vice President, Corporate Development & Investor Relations. Alastair Still, President & Chief Executive Officer of GoldMining commented: "We are pleased to welcome Martin to the GoldMining team. His mining industry experience across corporate development, capital markets, and investor relations within the gold sector will play a key role as we continue to advance our portfolio and pursue value-accretive opp

    1/22/26 6:30:00 AM ET
    $GLDG
    $GROY
    $USGO
    Precious Metals
    Basic Materials

    $GLDG
    Financials

    Live finance-specific insights

    View All

    GoldMining Acquires Existing NSR Royalty on Its Yarumalito Project, Colombia

    VANCOUVER, BC, March 14, 2022 /PRNewswire/ - GoldMining Inc. (the "Company" or "GoldMining") (TSX:GOLD) (NYSE:GLDG) is pleased to announce that it has acquired an existing 1% net smelter return ("NSR") royalty on the Company's Yarumalito Project in Colombia from Newrange Gold Corp. ("Newrange"). Pursuant to the agreement, the Company paid Newrange CAD$100,000 in cash and delivered 10,000 common shares of the Company. Alastair Still, CEO of GoldMining, commented, "Yarumalito was acquired by the Company in 2019 as part of a strategic consolidation of three projects in the Mid Cauca Belt of Colombia that form a district-scale property package in one of the underexplored gold-copper belts in the

    3/14/22 7:00:00 AM ET
    $GLDG
    $GROY
    Precious Metals
    Basic Materials

    $GLDG
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G/A filed by GoldMining Inc. (Amendment)

    SC 13G/A - GoldMining Inc. (0001538847) (Subject)

    2/5/24 6:06:01 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    SEC Form SC 13D filed by GoldMining Inc.

    SC 13D - GoldMining Inc. (0001538847) (Filed by)

    4/27/23 9:17:22 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by GoldMining Inc. (Amendment)

    SC 13G/A - GoldMining Inc. (0001538847) (Subject)

    2/14/23 1:05:49 PM ET
    $GLDG
    Precious Metals
    Basic Materials