• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    First Majestic Receives Construction Permits for Santo Niño and Navidad; Advances Development Across the Santa Elena District

    6/25/26 4:15:00 PM ET
    $AG
    Precious Metals
    Basic Materials
    Get the next $AG alert in real time by email

    Infill drilling at Santo Niño and Navidad returns multiple significant silver and gold intercepts, including high-grade results from resource-conversion drilling.

    Permits received for construction of the Santo Niño and Navidad portals.

    Additional $12 million investment planned in 2026 to advance underground access and position Santo Niño for near-term mining.

    Vancouver, British Columbia--(Newsfile Corp. - June 25, 2026) - First Majestic Silver Corp. (NYSE:AG) (TSX:AG) (FSE: FMV) (the "Company" or "First Majestic") is pleased to announce positive infill drilling results from the Santo Niño and Navidad targets at its Santa Elena Silver/Gold Mine in Sonora, Mexico. The Company has also received the permits required to construct the Santo Niño and Navidad portals and plans to invest an additional $12 million in 2026 to advance underground access, portal construction, and development work intended to position Santo Niño for near-term mining.

    "The continued advancement of Santo Niño and Navidad marks an important step in unlocking the next phase of growth at Santa Elena," stated Keith Neumeyer, CEO of First Majestic. "Infill drilling continues to return significant silver and gold intercepts at both targets. With construction permits now received for the Santo Niño and Navidad portals, and an additional $12 million investment planned in 2026, we are moving Santo Niño from discovery toward near-term mining readiness while continuing to advance Navidad, one of the most significant discoveries made at Santa Elena to date. Together, Santo Niño and Navidad are expected to become important contributors to the future mine plan and have the potential to materially extend Santa Elena's mine life."

    2026 EXPLORATION HIGHLIGHTS

    Santo Niño Vein System

    To date, a total of 26,904 metres ("m") of drilling has been completed across 69 holes in 2026 at Santo Niño as part of the Company's ongoing resource-conversion and development-focused drilling program. Drilling at Santo Niño has focused primarily on infilling the current Inferred Mineral Resources to support potential conversion to Indicated Mineral Resources and to advance near-term mine planning. Results received to date include significant silver and gold intercepts that are overall better than modeled and confirm the presence of higher-grade mineralization in the western portion of the vein.

    Navidad Vein System

    To date, a total of 7,704 m of drilling has been completed across 10 holes at Navidad in 2026. Drilling has focused primarily on supporting potential conversion of Inferred Mineral Resources to Indicated Mineral Resources at the Winter vein which, based on its geometric configuration, is expected to play an important role early in the future mine schedule. Results received to date include high-grade silver and gold intercepts near the edge of the current Inferred Mineral Resource.

    Cannot view this image? Visit: https://images.newsfilecorp.com/files/1475/302888_5632c92074479b28_002.jpg

    Figure 1: Santa Elena District Map Highlighting Santo Niño and Navidad Target Areas. Plan View.

    To view an enhanced version of this graphic, please visit:
    https://images.newsfilecorp.com/files/1475/302888_5632c92074479b28_002full.jpg

    KEY DRILLING HIGHLIGHTS

    Table 1 presents a selection of significant silver and gold drill hole intercepts from the 2026 Santa Elena drilling program at Santo Niño and Navidad. The selected intercepts include results from resource-conversion drilling at the Santo Niño vein and the Winter vein at Navidad.

    Table 1: Selection of Significant Drill Hole Intercepts from the Santa Elena 2026 Drill Program

     Drillhole  Target    Significant Intercept  
    From
    (m)
     
     To
    (m)
     
     True Width
    (m)
      
     Ag
     (g/t)
      
     Au
     (g/t)
     
    AgEq
    (g/t) 
    Santo Niño Target 
    SE-26-84Santo Niño Vein 229.35234.153.682528.46 886
    SE-26-76Santo Niño Vein 203.70216.905.58905.23 482
    SE-26-65Santo Niño Vein 197.35204.055.801114.04 414
    SE-26-86Santo Niño Vein 339.15341.201.5733315.21 1474
    SE-26-82Santo Niño Vein 365.35377.9010.87771.52 191
    Navidad Target  
    EWUG-26-089Winter Vein562.65565.302.4935923.592128 
    EWUG-26-091Winter Vein601.65617.5014.89283.5291 
    EWUG-26-088Winter Vein600.15605.003.4335811.99 1257

     

    Drilling remains ongoing at the Santo Niño and Navidad targets. At Santo Niño, drilling is being completed as part of a planned program of approximately 45,000 m in 2026. At Navidad, drilling is being completed as part of a planned program of approximately 17,000 m in 2026. The drilling is intended to increase data density, improve understanding of the mineralized volume, grade continuity, and vein geometry, and support potential conversion of Inferred Mineral Resources to Indicated Mineral Resources. This work is expected to strengthen geological confidence and support the basis for underground access design, mine planning, production scheduling, and economic evaluation.

    Significant silver and gold mineralization intersected within the Santo Niño vein currently extends approximately 1,100 m along strike and 425 m down dip and the mineralization averages approximately 4.0 m in thickness ranging from 1.0 m to 16.0 m (Figure 2). Mineralized secondary veins and breccias in the hanging wall and/or footwall of the principal vein have also been identified in several drill holes and remain under investigation.

    Cannot view this image? Visit: https://images.newsfilecorp.com/files/1475/302888_5632c92074479b28_003.jpg

    Figure 2: Santo Niño Vein Long Section Looking North with Significant Intercepts

    To view an enhanced version of this graphic, please visit:
    https://images.newsfilecorp.com/files/1475/302888_5632c92074479b28_003full.jpg

    Significant silver and gold mineralization intersected within the Winter vein currently extends approximately 1,000 m along strike and 350 m down dip, with true thickness ranging from 2.8 m to 4.4 m (Figure 3). The 2026 drilling continues to support evaluation of the Winter vein as a potentially important early mining area within the Navidad mineralized system.

    Cannot view this image? Visit: https://images.newsfilecorp.com/files/1475/302888_5632c92074479b28_004.jpg

    Figure 3: Winter Vein Long Section Looking Northwest with Significant Intercepts

    To view an enhanced version of this graphic, please visit:
    https://images.newsfilecorp.com/files/1475/302888_5632c92074479b28_004full.jpg

    ADVANCING UNDERGROUND ACCESS TO SANTO NIÑO AND NAVIDAD

    The Company is advancing Santo Niño and Navidad from resource definition toward underground development, supported by recently received portal construction permits and an additional $12 million investment planned for 2026. This next phase of work is expected to establish dedicated underground access to both areas, support decline and ramp development, and position higher-grade mineralization from Santo Niño and Navidad to contribute to the future Santa Elena district production profile.

    A recently completed scoping-level study identified dedicated underground access as the preferred approach to advance the Santo Niño and Navidad mineral resources. At Santo Niño, the preferred access concept includes a dedicated portal, the Santo Niño portal, and an approximately 450 m haul road connecting the portal area to the existing Ermitaño haul road.

    The study also indicates that development of an additional portal, the Navidad portal, located approximately 300 m from the Santa Elena processing facilities, together with ramp development from the lower levels of Ermitaño to provide secondary egress and ventilation, is expected to provide an efficient route to Navidad mineralization and support future haulage of mineralized material from the Navidad area (Figure 4).

    Preliminary mining and processing schedules for the Santa Elena district resources indicate that higher-grade mineralization from Santo Niño and Navidad has a positive impact on production profiles, displacing lower-grade mineralization from other deposits.

    The additional 2026 funding is planned to support construction of the Santo Niño and Navidad portals, advance hydrogeological studies, construct the haul road linking the Santo Niño portal to the Ermitaño haul road, complete approximately 800 m of decline development at Santo Niño, and complete an additional 1,300 m of development in the Ermitaño-to-Navidad ramp and from the Navidad portal.

    Cannot view this image? Visit: https://images.newsfilecorp.com/files/1475/302888_5632c92074479b28_005.jpg

    Figure 4: Proposed Santo Niño and Navidad Portals and Access Development. Plan View (Top) and Orthogonal View Looking North-Northwest (Bottom)

    To view an enhanced version of this graphic, please visit:
    https://images.newsfilecorp.com/files/1475/302888_5632c92074479b28_005full.jpg

    Permitting

    The Company has received the permits required for construction of the Santo Niño and Navidad portals, representing a key regulatory milestone in advancing toward underground development activities for the two mineral resources. With these permits now in hand, the Company plans to commence portal construction and related infrastructure work in the second half of 2026.

    Summary of Significant Assay Results

    A summary of significant assay results from exploration drilling completed at Santo Niño and Navidad during the first half of 2026 are provided in Table 2 and Table 3 below.

    Table 2: Summary of Significant Silver and Gold Drill Hole Intercepts at Santo Niño

     Drillhole Target  Target TypeSignificant Intercept 
     From
    (m)
    To
    (m)
     True Width
    (m)
     
    Au 
     (g/t)
     
    Ag 
     (g/t)
     
    AgEq 
     (g/t)
     
    SE-25-58Santo Niño VeinResource addition 935.85942.203.180.5863107
    SE-25-61Santo Niño VeinResource conversion811.00814.803.112.3479255
    SE-26-62Santo Niño VeinResource conversion201.85205.953.146.31131604

    IncludeResource conversion203.35203.850.3827.854772566
    SE-26-63VeinResource addition 467.20468.751.103.5163326

    Santo Niño VeinResource conversion478.55480.101.193.74172452
    SE-26-65Santo Niño VeinResource conversion197.35204.055.804.04111414

    IncludeResource conversion202.30202.750.3911.8993985
    SE-26-66Santo Niño VeinResource conversion198.65200.751.726.30145617

    IncludeResource conversion199.45200.250.6610.832911104
    SE-26-67Santo Niño Vein 1Resource conversion467.00469.101.611.7660192

    Santo Niño Vein 2Resource conversion470.50472.951.882.2317184
    SE-26-68Santo Niño VeinResource conversion165.60171.054.173.6389361

    IncludeResource conversion167.25167.800.4210.84111924
    SE-26-69Santo Niño Vein 1Resource conversion127.05131.853.682.9632254

    IncludeResource conversion129.45130.000.4213.46511061

    Santo Niño Vein 2Resource conversion132.80134.201.071.0130106

    BrecciaResource addition 192.65197.453.394.3972401

    IncludeResource addition 193.20193.550.2519.74781558
    SE-26-70Santo Niño Vein 1Resource conversion489.15490.551.072.9957282

    Santo Niño Vein 2Resource conversion496.30500.853.732.93117337
    SE-26-71Santo Niño VeinResource conversion156.15157.401.021.54123239
    SE-26-73Santo Niño VeinResource conversion354.70360.655.395.70120547

    IncludeResource conversion356.75357.750.9114.093071363
    SE-26-74Santo Niño VeinResource conversion178.80184.002.981.4624133
    SE-26-76VeinResource addition 150.30152.551.592.737212

    Santo Niño VeinResource conversion203.70216.905.585.2390482

    IncludeResource conversion211.45212.700.5322.993912116
    SE-26-78Santo Niño VeinResource conversion374.00380.605.063.9259353
    SE-26-80Santo Niño Vein 1Resource conversion223.90226.902.300.7544100

    Santo Niño Vein 2Resource conversion232.05238.004.873.21102342

    Santo Niño Vein 3Resource conversion239.75241.301.270.91112180

    Santo Niño Vein 4Resource conversion244.05249.204.670.8686150
    SE-26-82Santo Niño VeinResource conversion365.35377.9010.871.5277191
    SE-26-84Santo Niño Vein 1Resource conversion220.55227.755.522.1348208

    Santo Niño Vein 2Resource conversion229.35234.153.688.46252886

    Include 1Resource conversion230.15230.600.3416.603441589

    Include 2Resource conversion231.10231.550.3418.614071803

    Include 3Resource conversion231.90232.800.6917.235981891
    SE-26-86Santo Niño Vein 1Resource conversion335.10337.001.466.0791546

    IncludeResource conversion336.25336.650.3114.282191290

    Santo Niño Vein 2Resource conversion339.15341.201.5715.213331474

    IncludeResource conversion340.80341.200.3175.6315907262
    SE-26-88Santo Niño VeinResource conversion287.50291.452.542.1843206
    SE-26-90Santo Niño VeinResource conversion160.55162.501.251.7979213
    SE-26-91Santo Niño VeinResource conversion316.55318.351.1611.521831047

    IncludeResource conversion317.00317.450.2937.784533287
    SE-26-92Santo Niño VeinResource conversion193.55195.801.290.9399168
    SE-26-93Santo Niño VeinResource conversion356.40366.458.233.3681333

    IncludeResource conversion357.95358.650.5722.912872005
    SE-26-94Santo Niño VeinResource conversion193.50199.703.994.4070400

    IncludeResource conversion197.50198.200.4516.891911458
    SE-26-95Santo Niño VeinResource conversion295.20297.501.881.6078198
    SE-26-97Santo Niño VeinResource conversion386.15390.703.221.3863167
    SE-26-99Santo Niño VeinResource conversion320.30325.353.573.90136429

    IncludeResource conversion321.80322.350.3915.191481288

    IncludeResource conversion324.15324.450.217.1211251660
    SE-26-100VeinResource addition 775.85777.401.001.0258135
    SE-26-102-ASanto Niño VeinResource conversion287.25296.906.201.39100205

    IncludeResource conversion290.60291.100.3210.924361255
    SE-26-103Santo Niño VeinResource conversion272.30275.652.740.8274136
    SE-26-104Santo Niño Vein 1Resource conversion398.15402.052.042.25137306

    Santo Niño Vein 2Resource conversion418.85420.101.020.6573121
    SE-26-105Santo Niño Vein 1Resource conversion299.60301.551.381.8933175

    Santo Niño Vein 2Resource conversion310.80313.301.061.448116
    SE-26-106Santo Niño VeinResource conversion335.45336.951.151.9131174
    SE-26-108Santo Niño VeinResource conversion415.20416.801.131.25109203
    SE-26-113Santo Niño Vein 1Resource conversion392.40394.051.064.03112414

    Santo Niño Vein 2Resource conversion397.50400.852.152.2742212
    SE-26-114Santo Niño VeinResource conversion127.40130.151.940.90125192

     

    Table 3: Summary of Significant Silver and Gold Drill Hole Intercepts at Navidad

    Drillhole Target Target Type Significant Intercept
    From
    (m)
    To
    (m)
    True Width
     (m)
    Au
    (g/t)
    Ag
    (g/t)
    AgEq
    (g/t)
    EWUG-26-087Winter VeinResource conversion617.50619.001.301.4826137
    EWUG-26-088Winter VeinResource conversion600.15605.003.4311.993581257

    Include 1Resource conversion600.15601.050.6434.287733345

    Include 2Resource conversion601.35602.050.4926.055842538

    San Nicolas VeinResource addition 732.45736.702.733.1473308
    EWUG-26-089Winter VeinResource conversion562.65565.302.4923.593592128
    EWUG-26-091Winter VeinResource conversion601.65617.5014.893.5028291

    Include 1Resource conversion603.00603.350.3311.7088966

    Include 2Resource conversion605.35605.750.3810.2077843

    Include 3Resource conversion607.50608.000.4710.3249823

     

    Notes:

    1. All holes are Diamond Drill Core; AgEq grade = Ag grade (g/t) + [Au (g/t) * 75].
    2. From and To length indicated in metres, true width of the intercept is calculated per drill hole and vein angles.
    3. See Appendix for details regarding drill hole locations, sample type, azimuth, dip and total depth.
    4. Significant silver and gold drill hole intercepts were composited using the length weighted averages of uncapped sample assays, a 90 g/t AgEq minimum grade (Cut-off-Grade, "COG") for Santo Niño, and 110 g/t AgEq minimum grade for Navidad; minimum composite length of 1.0 m (true width). A maximum of 1.0 m below the minimum grade cut-off was allowed as internal dilution. Where necessary to achieve minimum length, a single sample below the COG but grading >70g/t AgEq was allowed to be composited for short intervals.
    5. Where present, single samples or intercepts with assay results higher than 1000 g/t Ag and/or 10 g/t Au are highlighted as "Include" in each intercept.

    DATA VERIFICATION

    First Majestic's drilling programs follow established Quality Assurance, Quality Control ("QA/QC") insertion protocols with standards, blanks, and duplicates introduced into the sample-stream. After geological logging, all drill core samples are cut in half. One half of the core is submitted to the laboratory for analysis, and the remaining half core is retained on-site for verification and reference purposes or for future metallurgical testing.

    Core samples were submitted to the SGS laboratory (ISO/IEC 17025:2017) and to the First Majestic Central laboratory (Central laboratory) (ISO 9001:2015). At SGS, gold is analyzed by 50 g fire assay atomic absorption finish (GE-FAA50V5). Results above 10 g/t gold are analyzed by 50 g fire assay gravimetric finish (GO-FAG50V). Silver is analyzed by 3-acid digest atomic absorption finish (GE-AAS33E50). Results above 100 g/t silver are analyzed by 50 g fire assay gravimetric finish (GO-FAG57V). At Central laboratory, gold is analyzed by 30g fire assay atomic absorption finish (AU-AA13). Results above 10 g/t are analyzed by 30 g fire assay gravimetric finish (ASAG-14). Silver is analyzed by 3-acid digestion atomic absorption finish (AAG-13). Results above 100 g/t are analyzed by 30 g fire assay gravimetric finish (ASAG-14, ASAG-13).

    For further information concerning QA/QC and data verification matters, key assumptions, parameters, and methods used by the Company to estimate Mineral Reserves and Mineral Resources, and for a detailed description of known legal, political, environmental, and other risks that could materially affect the Company's business and the potential development of Mineral Reserves and Mineral Resources, see the Company's most recently filed Annual Information Form available under the Company's SEDAR+ profile at www.sedarplus.ca and the Company's Annual Report on Form 40-F for the year ended December 31, 2025 filed with the United States Securities and Exchange Commission on EDGAR at www.sec.gov/edgar.

    QUALIFIED PERSONS

    Gonzalo Mercado, P. Geo., the Company's Vice-President, Exploration & Technical Services and a "Qualified Person" as defined under National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"), has reviewed and approved the scientific and technical information contained in this news release. Mr. Mercado has verified the exploration data contained in this news release, including the sampling, analytical and test data underlying such information.

    ABOUT FIRST MAJESTIC

    First Majestic is a publicly traded mining company focused on silver and gold production in Mexico and the United States. The Company presently owns and operates four producing underground mines in Mexico: the Santa Elena Silver/Gold Mine, the Los Gatos Silver Mine (the Company holds a 70% interest in the Los Gatos Joint Venture that owns and operates the mine), the San Dimas Silver/Gold Mine, and the La Encantada Silver Mine, as well as a portfolio of development and exploration assets, including the Jerritt Canyon Gold Mine located in northeastern Nevada, U.S.A, which the Company is currently in the process of re-starting.

    First Majestic is proud to own and operate its own minting facility, First Mint, LLC, and to offer a portion of its silver production for sale to the public. Bars, ingots, coins, and medallions are available for purchase online at www.firstmint.com, at some of the lowest premiums available.

    For further information, contact info@firstmajestic.com visit our website at www.firstmajestic.com or call our toll-free number 1.866.529.2807.

    FIRST MAJESTIC SILVER CORP.

    "signed"

    Keith Neumeyer, CEO

    Cautionary Note Regarding Forward Looking Statements

    This news release contains "forward‐looking information" and "forward-looking statements" under applicable Canadian and U.S. securities laws (collectively, "forward‐looking statements"). These statements relate to future events or the Company's future performance, business prospects or opportunities that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management made in light of management's experience and perception of historical trends. Forward-looking statements in this news release include but are not limited to statements with respect to: the Company's plans to invest an additional $12 million in 2026 to advance underground access, portal construction, and development work to position Santo Niño for near-term mining; the Company's expectations regarding the impact of the Santo Niño and Navidad vein systems on the future mine plans at Santa Elena; and the Company's planned drilling programs for Santo Niño and Navidad for 2026 and the results of such programs. These statements are not based on a pre-feasibility level study of Mineral Reserves that demonstrate the economic and technical viability of Santo Niño and Navidad. There is increased uncertainty related to the economics of mining Santo Niño and Navidad and increased technical risks of failure associated with a decision to initiate production from these areas prior to completing a pre-feasibility level study. The statements made relating to initiating mining at Santo Niño and Navidad are not based on a current technical report. Assumptions may prove to be incorrect and actual results and future events may differ materially from those anticipated. As such, investors are cautioned not to place undue reliance upon forward-looking statements as there can be no assurance that the plans, assumptions, or expectations upon which they are placed will occur. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives or future events or performance (often, but not always, using words or phrases such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "project", "predict", "forecast", "potential", "target", "intend", "could", "might", "should", "believe" and similar expressions) are not statements of historical fact and may be "forward‐looking statements". Statements concerning proven and probable mineral reserves and mineral resource estimates may also be deemed to constitute forward-looking statements to the extent that they involve estimates of the mineralization that will be encountered as and if the property is developed, and in the case of Measured and Indicated Mineral Resources or Proven and Probable Mineral Reserves, such statements reflect the conclusion based on certain assumptions that the mineral deposit can be economically exploited.

    Actual results may vary from forward-looking statements. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results to materially differ from those expressed or implied by such forward-looking statements, including but not limited to: material adverse changes; general economic conditions including inflation risks; labour relations; relations with local communities; changes in national or local governments; exchange rate fluctuations; environmental risks; requirements for additional capital; outcomes of pending litigation; unexpected changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts with the company to perform as agreed; social or labour unrest; changes in commodity prices; and the failure of exploration programs or studies to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations as well as those factors discussed in the section entitled "Risk Factors" in the Company's most recent Annual Information Form for the year ended December 31, 2025 filed with the Canadian securities regulatory authorities under the Company's SEDAR+ profile at www.sedarplus.ca and in the Company's Annual Report on Form 40-F for the year ended December 31, 2025 filed with the United States Securities and Exchange Commission on EDGAR at www.sec.gov/edgar. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated, or intended.

    The Company believes that the expectations reflected in these forward‐looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward‐looking statements included herein should not be unduly relied upon. These statements speak only as of the date hereof. The Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by applicable laws.

    Cautionary Note to United States Investors

    The Company is a "foreign private issuer" as defined in Rule 3b-4 under the United States Securities Exchange Act of 1934, as amended, and is eligible to rely upon the Canada-U.S. Multi-Jurisdictional Disclosure System, and is therefore permitted to prepare the technical information contained herein in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of the securities laws currently in effect in the United States. Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.

    Technical disclosure contained in this news release has not been prepared in accordance with the requirements of United States securities laws and uses terms that comply with reporting standards in Canada with certain estimates prepared in accordance with NI 43-101.

    NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning the issuer's material mineral projects.

    APPENDIX - DRILL HOLE DETAILS

    Table A1: Drill Hole Collar Location, Sample Type, Azimuth, Dip and Total Depth from Santa Elena

    DrillholeEastNorthElevationAzimuthDipDepth (m)Type
    SE-25-585821853320633832190-58982Core
    SE-25-615818323320637793170-47878.1Core
    SE-26-625811773320194770210-52.4250Core
    SE-26-635815113320381837192-43.62516Core
    SE-26-655811783320194770195-52.71255Core
    SE-26-665811793320194770180-51.65224Core
    SE-26-675815113320382837201-43.61513Core
    SE-26-685810973320166771201-64.96216Core
    SE-26-695810973320165771196-49.03273Core
    SE-26-705815113320382837187-47.44530Core
    SE-26-715810963320166771217-56.95350Core
    SE-26-735813053320294814181-46.84387Core
    SE-26-745810973320166771238-57.64261Core
    SE-26-765810973320167771247-63.94312Core
    SE-26-785813053320295813177-51.37417Core
    SE-26-805811803320195770207-60.82309Core
    SE-26-825813053320295814186-51.67423Core
    SE-26-845811793320195770226-56.38294Core
    SE-26-865813043320295814202-44.86381Core
    SE-26-885814393320175820199-58.8321Core
    SE-26-905812643320128778198-54.21193.8Core
    SE-26-915814393320175820204-63.47348Core
    SE-26-925812653320128778199-63.9233Core
    SE-26-935813063320295814197-48.24392Core
    SE-26-945812673320128778173-63.73255Core
    SE-26-955814383320175820214-54.6333Core
    SE-26-975813063320296814208-55.07420Core
    SE-26-995814383320175820219-57.65372Core
    SE-26-1005820443320613814183-57.341000Core
    SE-26-102-A5809723320358748190-43.06339Core
    SE-26-1035814403320175820180-55.73387Core
    SE-26-1045813063320296814209-59.86462Core
    SE-26-1055814403320175820171-60.35393Core
    SE-26-1065814403320175820165-65.9399Core
    SE-26-1085813073320296814196-59.51459Core
    SE-26-1135813073320295814188-56.79444Core
    SE-26-1145812933320075777180-57.6207Core
    EWUG-26-087583615331950257917665681Core
    EWUG-26-088583615331950257919164789Core
    EWUG-26-089583615331950257919058879Core
    EWUG-26-091583614331950257920352660Core

     

    Notes:

    1. All drill hole collar coordinates are determined using total station equipment after hole completion with UTM WGS84, Zone 12 (metres) as the reference system.

    Corporate Logo

    To view the source version of this press release, please visit https://www.newsfilecorp.com/release/302888

    Get the next $AG alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $AG

    DatePrice TargetRatingAnalyst
    3/24/2026Market Perform → Outperform
    BMO Capital Markets
    10/8/2025Hold → Buy
    TD Securities
    9/14/2023Market Perform
    BMO Capital Markets
    3/11/2022$22.50 → $22.00Buy
    HC Wainwright & Co.
    1/19/2022$25.00 → $22.50Buy
    HC Wainwright & Co.
    12/7/2021Hold → Buy
    TD Securities
    7/15/2021$23.50 → $25.00Buy
    HC Wainwright & Co.
    More analyst ratings

    $AG
    SEC Filings

    View All

    SEC Form 6-K filed by First Majestic Silver Corp.

    6-K - FIRST MAJESTIC SILVER CORP (0001308648) (Filer)

    6/22/26 10:03:32 AM ET
    $AG
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by First Majestic Silver Corp.

    6-K - FIRST MAJESTIC SILVER CORP (0001308648) (Filer)

    6/10/26 8:52:40 PM ET
    $AG
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by First Majestic Silver Corp.

    6-K - FIRST MAJESTIC SILVER CORP (0001308648) (Filer)

    5/12/26 7:07:18 AM ET
    $AG
    Precious Metals
    Basic Materials

    $AG
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    First Majestic Silver upgraded by BMO Capital Markets

    BMO Capital Markets upgraded First Majestic Silver from Market Perform to Outperform

    3/24/26 8:26:58 AM ET
    $AG
    Precious Metals
    Basic Materials

    First Majestic Silver upgraded by TD Securities

    TD Securities upgraded First Majestic Silver from Hold to Buy

    10/8/25 8:45:01 AM ET
    $AG
    Precious Metals
    Basic Materials

    BMO Capital Markets resumed coverage on First Majestic Silver

    BMO Capital Markets resumed coverage of First Majestic Silver with a rating of Market Perform

    9/14/23 9:12:17 AM ET
    $AG
    Precious Metals
    Basic Materials

    $AG
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    First Majestic Receives Construction Permits for Santo Niño and Navidad; Advances Development Across the Santa Elena District

    Infill drilling at Santo Niño and Navidad returns multiple significant silver and gold intercepts, including high-grade results from resource-conversion drilling.Permits received for construction of the Santo Niño and Navidad portals.Additional $12 million investment planned in 2026 to advance underground access and position Santo Niño for near-term mining.Vancouver, British Columbia--(Newsfile Corp. - June 25, 2026) - First Majestic Silver Corp. (NYSE:AG) (TSX:AG) (FSE: FMV) (the "Company" or "First Majestic") is pleased to announce positive infill drilling results from the Santo Niño and Navidad targets at its Santa Elena Silver/Gold Mine in Sonora, Mexico. The Company has also received th

    6/25/26 4:15:00 PM ET
    $AG
    Precious Metals
    Basic Materials

    Sierra Madre and First Majestic Announce Closing of Acquisition of the Del Toro Silver Mine for up to US$60M

    Vancouver, British Columbia--(Newsfile Corp. - June 22, 2026) - Sierra Madre Gold and Silver Ltd. (TSXV:SM) (OTCQX:SMDRF) ("Sierra Madre") and First Majestic Silver Corp. (NYSE:AG) (TSX:AG) (FSE: FMV) ("First Majestic", and together with Sierra Madre, the "Parties") are pleased to announce that, pursuant to the share purchase agreement dated December 17, 2025 (the "Share Purchase Agreement") between Sierra Madre and First Majestic, Sierra Madre has completed its previously announced acquisition (the "Acquisition") of First Majestic Del Toro, S.A. de C.V. ("Subco"), a wholly-owned subsidiary of First Majestic incorporated under the laws of Mexico that holds a 100% interest in the Del Toro Sil

    6/22/26 7:00:00 AM ET
    $AG
    Precious Metals
    Basic Materials

    First Majestic Announces Voting Results from 2026 Annual General Meeting

    Vancouver, British Columbia--(Newsfile Corp. - June 10, 2026) - First Majestic Silver Corp. (NYSE:AG) (TSX:AG) (FSE: FMV) (the "Company" or "First Majestic") is pleased to announce the voting results for its Annual General Meeting of shareholders that was held on Wednesday, June 10, 2026 in Vancouver, British Columbia (the "2026 AGM"). Each of the matters that were voted upon at the 2026 AGM are described in detail in the Company's Management Information Circular dated April 29, 2026 (the "Circular"), which is available on the Company's website at www.firstmajestic.com/investors/agm-materials/ and under the Company's profile on SEDAR+ at www.sedarplus.ca.A total of 290,164,319 common shares

    6/10/26 8:00:00 PM ET
    $AG
    Precious Metals
    Basic Materials

    $AG
    Leadership Updates

    Live Leadership Updates

    View All

    First Majestic Announces Voting Results from 2026 Annual General Meeting

    Vancouver, British Columbia--(Newsfile Corp. - June 10, 2026) - First Majestic Silver Corp. (NYSE:AG) (TSX:AG) (FSE: FMV) (the "Company" or "First Majestic") is pleased to announce the voting results for its Annual General Meeting of shareholders that was held on Wednesday, June 10, 2026 in Vancouver, British Columbia (the "2026 AGM"). Each of the matters that were voted upon at the 2026 AGM are described in detail in the Company's Management Information Circular dated April 29, 2026 (the "Circular"), which is available on the Company's website at www.firstmajestic.com/investors/agm-materials/ and under the Company's profile on SEDAR+ at www.sedarplus.ca.A total of 290,164,319 common shares

    6/10/26 8:00:00 PM ET
    $AG
    Precious Metals
    Basic Materials

    First Majestic Reports Continued Exploration Success at Santa Elena and Announces Senior Management Update

    New drilling significantly expands the gold and silver mineralization of the Santo Niño and Navidad discoveriesDrilling completed at Luna expected to convert substantial amount of Inferred Mineral Resources to Indicated Mineral ResourcesStart of scoping-level studies for Navidad and Santo Niño provide guidance on potential mining strategiesMani Alkhafaji promoted to President & Chief Corporate Development OfficerVancouver, British Columbia--(Newsfile Corp. - December 15, 2025) - First Majestic Silver Corp. (NYSE:AG) (TSX:AG) (FSE: FMV) (the "Company" or "First Majestic") is pleased to announce the start of preliminary mine planning studies for the Navidad and Santo Niño discoveries located a

    12/15/25 4:30:00 PM ET
    $AG
    Precious Metals
    Basic Materials

    First Majestic Announces Voting Results from 2025 Annual General Meeting

    Vancouver, British Columbia--(Newsfile Corp. - May 20, 2025) - First Majestic Silver Corp. (NYSE:AG) (TSX:AG) (FSE: FMV) (the "Company" or "First Majestic") is pleased to announce the voting results for its Annual General Meeting of Shareholders held on Tuesday, May 20, 2025 in Vancouver, British Columbia (the "2025 AGM"). Each of the matters that were voted upon at the 2025 AGM are described in detail in the Company's Management Information Circular dated April 9, 2025 (the "Circular"), which is available on the Company's website at www.firstmajestic.com or at www.firstmajesticagm.com.A total of 281,059,326 common shares of First Majestic were represented at the 2025 AGM, representing 57.9

    5/20/25 8:16:00 PM ET
    $AG
    Precious Metals
    Basic Materials

    $AG
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G/A filed by First Majestic Silver Corp. (Amendment)

    SC 13G/A - FIRST MAJESTIC SILVER CORP (0001308648) (Subject)

    2/14/24 12:01:36 PM ET
    $AG
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by First Majestic Silver Corp. (Amendment)

    SC 13G/A - FIRST MAJESTIC SILVER CORP (0001308648) (Subject)

    2/14/23 12:39:37 PM ET
    $AG
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by First Majestic Silver Corp. (Amendment)

    SC 13G/A - FIRST MAJESTIC SILVER CORP (0001308648) (Subject)

    2/7/23 7:23:23 PM ET
    $AG
    Precious Metals
    Basic Materials

    $AG
    Financials

    Live finance-specific insights

    View All

    First Majestic Announces Q1 2026 Financial Results and Increased Quarterly Dividend Payment; Provides Management Updates

    Vancouver, British Columbia--(Newsfile Corp. - May 12, 2026) - First Majestic Silver Corp. (NYSE:AG) (TSX:AG) (FSE: FMV) (the "Company" or "First Majestic") is pleased to announce the Company's unaudited condensed interim consolidated financial results for the first quarter ended March 31, 2026. The full version of the quarterly financial statements and the accompanying management's discussion and analysis can be viewed on the Company's website at www.firstmajestic.com or under the Company's profiles on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov/edgar. All amounts are in U.S. dollars unless stated otherwise. First Majestic delivered a strong first quarter, with silver and gold pr

    5/12/26 7:00:00 AM ET
    $AG
    Precious Metals
    Basic Materials

    Silver Investment Demand Set to Surge 20% as Supply Deficit Deepens

    VANCOUVER, British Columbia, March 11, 2026 (GLOBE NEWSWIRE) -- USANewsGroup.com Sector Commentary — Physical investment demand for silver is on track to jump 20% in 2026, with bar and coin purchases climbing to 227 million ounces as Western buyers re-enter the market alongside sustained Indian appetite[1]. The capital rotation comes as the metal's structural supply deficit stretches into a sixth consecutive year, projected at 67 million ounces even with total mine output reaching a decade high[2]. Americore Resources (TSXV:AMCO) (OTCQB:AMCOF), Pan American Silver (NYSE:PAAS), Coeur Mining (NYSE:CDE), First Majestic Silver (NYSE:AG), and Endeavour Silver (NYSE:EXK) are delivering record re

    3/11/26 9:00:00 AM ET
    $AG
    $CDE
    $EXK
    Precious Metals
    Basic Materials

    The Numbers Are In: Silver Mining's Best Year Just Set a New Floor

    Issued on behalf of Americore Resources Corp.VANCOUVER, BC, March 5, 2026 /CNW/ -- USANewsGroup.com News Commentary -- The global silver market is heading for a sixth consecutive annual deficit in 2026, with the shortfall projected at 67 million ounces as mine production continues to fall short of industrial consumption[1]. The U.S. Department of the Interior added silver to the official Critical Minerals List in November, recognizing it as essential to national security alongside lithium and cobalt[2]. These supply fundamentals are drawing capital toward Americore Resources (TSXV:AMCO) (OTCQB:AMCOF), Pan American Silver (NYSE:PAAS) (TSX:PAAS), Coeur Mining (NYSE:CDE), First Majestic Silver

    3/5/26 9:00:00 AM ET
    $AG
    $CDE
    $EXK
    Precious Metals
    Basic Materials