• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    A Fully Permitted Tanzanian Gold Project Just Took a Key Step Toward Construction

    7/2/26 9:15:00 AM ET
    $NEM
    $B
    $AEM
    $AU
    Precious Metals
    Basic Materials
    Precious Metals
    Basic Materials
    Get the next $NEM alert in real time by email

    Issued on behalf of Lake Victoria Gold Ltd.

    Lake Victoria Gold Ltd. (TSXV:LVG) (OTCQB:LVGLF) (FSE: E1K) received Tanzania Mining Commission approval for a Tanzanian-led engineering, procurement and construction management team at its fully permitted Imwelo Gold Project, consolidating development workstreams under a single delivery framework as the Company advances toward construction.

    VANCOUVER, British Columbia, July 02, 2026 (GLOBE NEWSWIRE) -- Canada News Group News Commentary — Gold has spent 2026 trading near record levels, and the rally has done more than lift the share prices of the world’s largest producers. It has sharpened investor attention on the smaller developers working to turn permitted deposits into producing mines, where a single permitting or engineering milestone can re-rate an entire story. Against that backdrop, Lake Victoria Gold Ltd. (TSXV:LVG) (OTCQB:LVGLF) (FSE: E1K) has cleared an important step at its fully permitted Imwelo Gold Project in northwestern Tanzania, securing regulatory approval for the project-delivery team that will carry it through final engineering and into construction preparation.

    Key Takeaways

    • Lake Victoria Gold (TSXV:LVG) received Tanzania Mining Commission approval on June 29, 2026 for an integrated engineering, procurement and construction management (EPCM) structure at its fully permitted Imwelo Gold Project, structured under the country’s Mining (Local Content) Regulations, 2018.
    • City Engineering Company Ltd. (CECL), a 100% Tanzanian-owned engineering and environmental services firm, was appointed primary EPCM contractor and commercial lead, with Sutton Consulting International Limited serving as international technical-support partner.
    • The approved structure consolidates engineering and development workstreams already underway at Imwelo, coordinating final detailed engineering, procurement planning, infrastructure design, mine planning support and construction preparation under a single Tanzanian-led framework.
    • Project advancement continues alongside financing activities, including the previously announced gold loan facility term sheet of up to approximately US$25 million with Monetary Metals & Co., which remains subject to conditions and required regulatory approvals.
    • LVG advances within the prolific Lake Victoria Goldfield, the same northwestern Tanzania district that hosts established operations from senior producers tracked by investors, including Newmont (NYSE:NEM), Barrick Mining (NYSE:B), Agnico Eagle (NYSE:AEM), and AngloGold Ashanti (NYSE:AU), each distinct, far larger, and none a proxy for LVG.

    A Key Step Toward Construction

    Lake Victoria Gold’s wholly owned Tanzanian subsidiary, Tembo Gold (T) Limited, holds Mining Licence ML 538/2015 over the fully permitted Imwelo Gold Project. The Company has now formalized the appointment of City Engineering Company Ltd. as primary Engineering, Procurement and Construction Management contractor, working in association with Sutton Consulting International Limited as international technical-support partner. The appointment received approval from the Mining Commission on June 29, 2026 and is structured in accordance with Tanzania’s Mining (Local Content) Regulations, 2018.

    The significance is less about any single contract than about what it consolidates. According to the Company, the approved EPCM structure brings engineering and development workstreams already underway at Imwelo together under a single, Tanzanian-led project delivery framework. For a junior developer, moving from scattered work programs to one coordinated delivery structure is the kind of operational discipline that typically precedes a construction decision.

    "This is a key milestone in preparing Imwelo for construction," said Marc Cernovitch, President and CEO of Lake Victoria Gold. "With Mining Commission approval received and our EPCM structure now formalized, we have moved another important step closer to building one of Tanzania’s next new gold mines. Equally important, we are advancing Imwelo the right way. Tanzania has a clear regulatory framework for local content and mining project development, and we believe long-term success in the country requires working constructively with the Mining Commission, respecting that framework, and ensuring Tanzanian companies and professionals play a meaningful role in project execution."

    A Tanzanian-Led Delivery Model

    The EPCM structure combines established Tanzanian engineering and environmental capability with international technical review. CECL is a 100% Tanzanian-owned engineering and environmental services company registered with Tanzania’s National Environment Management Council, Engineers Registration Board and the Department of Water Resources. Its capabilities span geotechnical investigation, tailings storage facility and dam design, hydrology and hydrogeology modelling, environmental impact assessment support, water treatment design and independent project management.

    Sutton, a multi-disciplinary mining and engineering consultancy and member of the Sutton Global Group, brings experience developing and operating gold and multi-commodity projects across Africa, including process plant design, tailings and dam engineering, geotechnical and environmental services, mine planning and EPCM project management. Under the structure, CECL leads project delivery and holds the primary contractual relationship as a qualifying Indigenous Tanzanian Company, providing the majority of project management, procurement and construction supervision through Tanzanian nationals, while Sutton provides specialist international engineering and technical review as sub-consultant, supported by an embedded knowledge-transfer programme consistent with Regulation 26 of the Mining (Local Content) Regulations, 2018.

    Key development workstreams are advancing in parallel, including tailings and water infrastructure design, geotechnical and hydrogeological studies, process plant optimization, procurement support and construction quality assurance. The Company has framed the model as one designed to deliver more than engineering services alone, aiming to strengthen local engineering capability, expand opportunities for Tanzanian professionals and suppliers, and facilitate knowledge transfer intended to benefit Tanzania’s mining sector beyond Imwelo itself.

    Why Local Content Matters in Tanzania

    Tanzania’s Mining (Local Content) Regulations are designed to ensure the country’s mineral resources support broad-based national development by prioritizing Tanzanian ownership, employment, procurement and the transfer of skills and technology to local firms and professionals. For developers, working within that framework is not optional; it is a condition of advancing a project. LVG has positioned its approach to local content not merely as a regulatory requirement but as part of responsible mine development, with the Imwelo EPCM structure intended to support Tanzanian participation while maintaining international technical standards through Sutton’s specialist support.

    That posture also reflects a practical reality of operating in the region. Tanzania has become one of Africa’s most active gold jurisdictions, and the government has made clear that future mine development should deliver tangible local benefit. By building its delivery model around a qualifying Tanzanian lead contractor from the outset, LVG is aligning the project with the direction the country’s regulators have set, which the Company believes is important to the continued growth of Tanzania’s mining-services sector and the successful development of new mines.

    A Near-Term Developer in a Tier-One Goldfield

    Imwelo sits in the Lake Victoria Goldfield, one of Africa’s most prolific gold districts and the namesake of the Company itself. LVG holds a 100% interest in the fully permitted Imwelo Project, located west of AngloGold Ashanti’s Geita Gold Mine, and a 100% interest in the Tembo project, which has more than fifty thousand metres of drilling and sits adjacent to Barrick’s Bulyanhulu Mine. The Company has also drawn validation from an equity investment by Barrick and a strategic partnership with Tanzania’s Taifa Group, whose mining arm is contracted to conduct contract mining and civil works at Imwelo.

    The neighborhood is instructive. The same goldfield that hosts Imwelo and Tembo is home to large-scale operations run by some of the sector’s biggest names, a reminder of the geological endowment LVG is working within, even as the Company remains an early-stage developer whose scale and risk profile differ sharply from those of the senior producers operating nearby.

    The Gold Producers Investors Watch

    LVG is a junior gold developer and is not directly comparable to the established producers below. These comparisons are for industry context only; each company pursues a different strategy and operates at vastly greater scale, and none is a proxy for LVG or implies any partnership or comparable performance.

    Newmont (NYSE:NEM) is the world’s largest gold producer, with operations and assets spanning North and South America, Australia, Africa and beyond. As a roughly $100-billion-market-cap senior producer, Newmont represents the large-cap anchor of the gold sector and a barometer for how record gold prices are translating into producer cash flows.

    Barrick Mining (NYSE:B), formerly Barrick Gold, is one of the most recognizable names in the sector and a direct presence in LVG’s goldfield: its Bulyanhulu Mine sits adjacent to the Tembo project, and Barrick is among LVG’s equity investors. Barrick has been expanding its copper footprint while gold remains at the core of its business, and reported record quarterly free cash flow in its most recent results.

    Agnico Eagle (NYSE:AEM), the largest mining company in Canada and the world’s second-biggest gold producer, operates mines across Canada, Australia, Finland and Mexico. Known for operational discipline in politically stable jurisdictions, Agnico Eagle illustrates the premium the market places on consistent, low-cost production and a track record of value-accretive consolidation.

    AngloGold Ashanti (NYSE:AU) is the comp closest to home: its flagship Geita mine lies in the Lake Victoria goldfields of northwestern Tanzania, the very district where Imwelo is located, with Imwelo positioned west of Geita. A global producer with assets across Africa, Australia and the Americas, AngloGold offers a view of large-scale production within the same goldfield LVG is working to develop.

    The Bottom Line

    Regulatory approval of an EPCM structure is a preparation milestone, not a production decision, and LVG itself is careful to note that no feasibility study establishing mineral reserves under NI 43-101 has been completed for Imwelo. But in a year when gold has traded near record highs and investors are scrutinizing which permitted projects can actually reach construction, consolidating engineering and development work under a single, Mining-Commission-approved, Tanzanian-led delivery team is a concrete step in the right direction. With financing activities advancing in parallel, Lake Victoria Gold’s progress at Imwelo is a development story worth watching, with the financing close, final engineering, and any eventual construction decision the markers that matter from here.

    SIGNAL OVER NOISE

    Signal over noise. Gold, mining, and junior-developer headlines move fast, and the crowd often moves first. Eagle Eye is a real-time investor signal-intelligence platform that surfaces sentiment shifts, news flow, and trending tickers as they happen, so you see the move forming instead of reading about it later. See it at eagle-eye.dev.

    CONTACT

    Canada News Group

    info@canadanewsgroup.com

    SOURCES

    [1] Lake Victoria Gold Ltd., "Lake Victoria Gold Formalizes Tanzanian-Led EPCM Team, Advancing the Fully Permitted Imwelo Gold Project Toward Construction" (news release dated July 2, 2026; Mining Commission approval June 29, 2026; CECL and Sutton appointments; Mining (Local Content) Regulations, 2018).

    [2] Newmont Corporation (NYSE:NEM), corporate disclosures and Q1 2026 results, 2026.

    [3] Barrick Mining Corporation (NYSE:B), corporate disclosures and recent quarterly results, 2026.

    [4] Agnico Eagle Mines Limited (NYSE:AEM), corporate disclosures, 2026.

    [5] AngloGold Ashanti plc (NYSE:AU), corporate disclosures and Q1 2026 results, 2026.

    QUALIFIED PERSON

    The scientific and technical information in this news release has been reviewed and approved by David Scott, Pr. Sci. Nat., who is a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Mr. Scott is a Director and Officer of the Company.

    CAUTIONARY NOTE ON PRODUCTION DECISION

    Although Imwelo has been the subject of JORC-compliant PEA, PFS and updated PFS work, these foreign-code studies are not current under NI 43-101. The Company has not completed a feasibility study on Imwelo that establishes mineral reserves demonstrating economic and technical viability and is not treating the JORC-based estimates or analyses as current under CIM Definition Standards. Any decision to commence production would not be based on a feasibility study of mineral reserves and would therefore involve increased uncertainty and a higher risk of economic and technical failure. There is no certainty that the planned low-capex open-pit operation will be economically viable or that production will occur as anticipated. Risks include, without limitation, variations in grade and recovery, unexpected geotechnical or metallurgical challenges, cost overruns, funding availability, operational risks, regulatory risks and permitting risks.

    DISCLAIMER

    Nothing in this publication should be considered as personalized financial advice. We are not licensed under securities laws to address your particular financial situation. No communication by our employees to you should be deemed as personalized financial advice. Please consult a licensed financial advisor before making any investment decision. This is a paid advertisement and is neither an offer nor recommendation to buy or sell any security. We hold no investment licenses and are thus neither licensed nor qualified to provide investment advice. The content in this report or email is not provided to any individual with a view toward their individual circumstances. This article is being distributed for Market IQ Media Group Limited, a company incorporated under the laws of Ireland ("MIQL"), which wholly owns and operates Canada News Group. MIQL has been paid a fee directly by Lake Victoria Gold Ltd. for advertising and digital media. MIQL and its owner/operators currently own shares of Lake Victoria Gold Ltd., and reserve the right to buy and sell shares of Lake Victoria Gold Ltd. at any time thereafter without any further notice. There may be 3rd parties who may have shares of Lake Victoria Gold Ltd., and may liquidate their shares which could have a negative effect on the price of the stock. This compensation and share ownership constitute a conflict of interest as to our ability to remain objective in our communication regarding the profiled company. Because of this conflict, individuals are strongly encouraged to not use this publication as the basis for any investment decision. We also expect further compensation as an ongoing digital media effort to increase visibility for the company, no further notice will be given, but let this disclaimer serve as notice that all material, including this article, which is disseminated by MIQL has been reviewed by Lake Victoria Gold Ltd. While all information is believed to be reliable, it is not guaranteed by us to be accurate. Individuals should assume that all information contained in our newsletter is not trustworthy unless verified by their own independent research. Always consult a licensed investment professional before making any investment decision. Be extremely careful, investing in securities carries a high degree of risk; you may likely lose some or all of the investment.

    CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS: This publication contains forward-looking statements, including statements regarding the appointment of CECL and Sutton and the anticipated scope, performance and benefits of the EPCM arrangement; the advancement of the Imwelo Gold Project toward a construction decision; the planned EPCM work programmes and expected timing; the anticipated benefits of the Tanzanian local-content structure; the previously announced gold loan facility term sheet with Monetary Metals & Co. and the satisfaction of conditions and receipt of regulatory approvals in connection therewith; and the receipt of other required regulatory and governmental approvals. Forward-looking statements are subject to known and unknown risks and uncertainties, certain of which are beyond the Company’s control, including the ability of CECL and Sutton to perform the EPCM services as anticipated; the negotiation and execution of definitive agreements; delays in engineering, permitting, financing or construction activities; the availability of financing, including completion of the Monetary Metals gold loan facility on the terms described or at all; receipt of all required regulatory approvals; the volatility of metal prices and LVG’s common shares; actual development plans and costs differing materially from estimates; and other risks disclosed in the Company’s public filings, that could cause actual results to differ materially. Except as required by law, the Company undertakes no obligation to update any forward-looking statement. References to other companies are based on those companies’ public disclosures, are provided for industry context only, and do not imply any partnership, endorsement, affiliation, or comparable performance.

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.



    Primary Logo

    Get the next $NEM alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $NEM
    $B
    $AEM
    $AU

    CompanyDatePrice TargetRatingAnalyst
    Newmont Corporation
    $NEM
    7/14/2026$127.00Hold → Buy
    TD Cowen
    Agnico Eagle Mines Limited
    $AEM
    7/6/2026$200.00Hold → Buy
    Jefferies
    Newmont Corporation
    $NEM
    5/22/2026$133.00Overweight
    Barclays
    Barrick Mining Corporation
    $B
    5/22/2026$41.00Equal Weight
    Barclays
    Agnico Eagle Mines Limited
    $AEM
    5/22/2026$213.00Overweight
    Barclays
    Newmont Corporation
    $NEM
    4/17/2026$130.00Outperform → Sector Perform
    National Bank Financial
    Agnico Eagle Mines Limited
    $AEM
    3/24/2026Buy → Hold
    Erste Group
    Agnico Eagle Mines Limited
    $AEM
    3/5/2026Hold → Buy
    Erste Group
    More analyst ratings

    $NEM
    $B
    $AEM
    $AU
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Barrick Announces Investment in Kingfisher Metals

    TORONTO, July 21, 2026 (GLOBE NEWSWIRE) -- Barrick Mining Corporation (NYSE:B)(TSX:ABX) announced today that it has agreed to subscribe for 15,470,934 units ("Units") of Kingfisher Metals Corp. ("Kingfisher") in a non-brokered private placement ("Private Placement") at a price of C$1.35 per Unit, for total consideration of approximately C$20,885,761. Each Unit is comprised of one common share (each, a "Kingfisher Share") and one-half of a common share purchase warrant, where each whole warrant will entitle the holder for a period of two years to acquire one Kingfisher common share at a price of C$1.70 per common share. Barrick does not currently own any Kingfisher Shares. Following closin

    7/21/26 7:00:00 AM ET
    $B
    Precious Metals
    Basic Materials

    America Needs Antimony, and This Nevada Explorer Just Defined One of the Largest Domestic Resources of It

    Issued on behalf of NevGold Corp. NevGold Corp. (TSXV:NAU) (OTCQX:NAUFF) (Frankfurt: 5E50) has announced a maiden gold-antimony Mineral Resource Estimate at its Limousine Butte Project in Nevada, defining a large-scale, oxide antimony-gold resource in the United States with near-term production potential for a critical mineral the country urgently needs to source domestically. VANCOUVER, British Columbia, July 15, 2026 (GLOBE NEWSWIRE) -- Canada News Group News Commentary — Antimony is not a metal most investors think about, but the U.S. government thinks about it constantly. It hardens ammunition, it is essential to flame retardants and night-vision equipment, and it has no easy substit

    7/15/26 10:38:09 AM ET
    $UAMY
    $PPTA
    $AEM
    Metal Fabrications
    Industrials
    Precious Metals
    Basic Materials

    Tanzania's Next Gold Mine Has Its Team, Its Financing, and Its Permits - Now It Just Has to Build

    Issued on behalf of Lake Victoria Gold Ltd. In the span of three weeks, a junior gold developer in northwestern Tanzania cleared its construction site of mineralization, secured regulatory advancement on a gold-denominated project loan, and formalized a Tanzanian-led EPCM team with Mining Commission approval. The checklist is getting short.VANCOUVER, BC, July 15, 2026 /PRNewswire/ -- USA News Group News Commentary — The Lake Victoria Goldfield in northwestern Tanzania is one of Africa's great producing gold belts — home to world-class mines operated by two of the industry's largest companies, and a region whose geological endowment has been drawing international mining capital for decades. A

    7/15/26 9:50:00 AM ET
    $AU
    $B
    $TRX
    Precious Metals
    Basic Materials

    $NEM
    $B
    $AEM
    $AU
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    EVP, Chief Sustain & Dev Off Toth Peter sold $277,140 worth of shares (3,000 units at $92.38) as part of a pre-agreed trading plan, decreasing direct ownership by 6% to 43,315 units (SEC Form 4)

    4 - NEWMONT Corp /DE/ (0001164727) (Issuer)

    7/6/26 4:39:21 PM ET
    $NEM
    Precious Metals
    Basic Materials

    New insider Cage Joshua claimed ownership of 14,643 shares (SEC Form 3)

    3 - NEWMONT Corp /DE/ (0001164727) (Issuer)

    7/6/26 4:35:01 PM ET
    $NEM
    Precious Metals
    Basic Materials

    President & CEO Viljoen Natascha sold $408,852 worth of shares (3,882 units at $105.32) as part of a pre-agreed trading plan, decreasing direct ownership by 3% to 142,999 units (SEC Form 4)

    4 - NEWMONT Corp /DE/ (0001164727) (Issuer)

    6/3/26 4:42:16 PM ET
    $NEM
    Precious Metals
    Basic Materials

    $NEM
    $B
    $AEM
    $AU
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Newmont Corporation upgraded by TD Cowen with a new price target

    TD Cowen upgraded Newmont Corporation from Hold to Buy and set a new price target of $127.00

    7/14/26 8:57:23 AM ET
    $NEM
    Precious Metals
    Basic Materials

    Agnico-Eagle Mines upgraded by Jefferies with a new price target

    Jefferies upgraded Agnico-Eagle Mines from Hold to Buy and set a new price target of $200.00

    7/6/26 8:48:59 AM ET
    $AEM
    Precious Metals
    Basic Materials

    Barclays initiated coverage on Newmont Corporation with a new price target

    Barclays initiated coverage of Newmont Corporation with a rating of Overweight and set a new price target of $133.00

    5/22/26 8:43:43 AM ET
    $NEM
    Precious Metals
    Basic Materials

    $NEM
    $B
    $AEM
    $AU
    SEC Filings

    View All

    SEC Form 6-K filed by AngloGold Ashanti PLC

    6-K - AngloGold Ashanti PLC (0001973832) (Filer)

    7/13/26 6:04:13 AM ET
    $AU
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Agnico Eagle Mines Limited

    6-K - AGNICO EAGLE MINES LTD (0000002809) (Filer)

    7/2/26 11:39:31 AM ET
    $AEM
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by AngloGold Ashanti PLC

    6-K - AngloGold Ashanti PLC (0001973832) (Filer)

    7/1/26 6:16:13 AM ET
    $AU
    Precious Metals
    Basic Materials

    $NEM
    $B
    $AEM
    $AU
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Director Conger Harry M. Iv bought $400,335 worth of shares (9,498 units at $42.15) (SEC Form 4)

    4 - NEWMONT Corp /DE/ (0001164727) (Issuer)

    12/2/24 5:11:53 PM ET
    $NEM
    Precious Metals
    Basic Materials

    Mangum Mylle H bought $1,912 worth of shares (67 units at $28.65), increasing direct ownership by 0.25% to 26,367 units (SEC Form 4)

    4 - BARNES GROUP INC (0000009984) (Issuer)

    12/12/23 3:48:02 PM ET
    $B
    Precious Metals
    Basic Materials

    Manner Hans-Peter bought $1,138,815 worth of shares (50,000 units at $22.78), increasing direct ownership by 311% to 66,079 units (SEC Form 4)

    4 - BARNES GROUP INC (0000009984) (Issuer)

    11/9/23 3:12:45 PM ET
    $B
    Precious Metals
    Basic Materials

    $NEM
    $B
    $AEM
    $AU
    Leadership Updates

    Live Leadership Updates

    View All

    Tanzania's Next Gold Mine Has Its Team, Its Financing, and Its Permits - Now It Just Has to Build

    Issued on behalf of Lake Victoria Gold Ltd. In the span of three weeks, a junior gold developer in northwestern Tanzania cleared its construction site of mineralization, secured regulatory advancement on a gold-denominated project loan, and formalized a Tanzanian-led EPCM team with Mining Commission approval. The checklist is getting short.VANCOUVER, BC, July 15, 2026 /PRNewswire/ -- USA News Group News Commentary — The Lake Victoria Goldfield in northwestern Tanzania is one of Africa's great producing gold belts — home to world-class mines operated by two of the industry's largest companies, and a region whose geological endowment has been drawing international mining capital for decades. A

    7/15/26 9:50:00 AM ET
    $AU
    $B
    $TRX
    Precious Metals
    Basic Materials

    A Fully Permitted Tanzanian Gold Project Just Took a Key Step Toward Construction

    Issued on behalf of Lake Victoria Gold Ltd. Lake Victoria Gold Ltd. (TSXV:LVG) (OTCQB:LVGLF) (FSE: E1K) received Tanzania Mining Commission approval for a Tanzanian-led engineering, procurement and construction management team at its fully permitted Imwelo Gold Project, consolidating development workstreams under a single delivery framework as the Company advances toward construction. VANCOUVER, British Columbia, July 02, 2026 (GLOBE NEWSWIRE) -- Canada News Group News Commentary — Gold has spent 2026 trading near record levels, and the rally has done more than lift the share prices of the world’s largest producers. It has sharpened investor attention on the smaller developers working to

    7/2/26 9:15:00 AM ET
    $NEM
    $B
    $AEM
    Precious Metals
    Basic Materials

    TransAct Technologies Appoints Troy Ingianni as Chief Financial Officer

    Leadership Transition Continues to Support Focus on Recurring Revenue Growth TransAct Technologies Incorporated (NASDAQ:TACT) ("TransAct" or the "Company"), a leading provider of SaaS platform and integrated hardware solutions, today announced the appointment of Troy Ingianni as Chief Financial Officer, effective July 1, 2026. Mr. Ingianni brings more than 25 years of financial leadership experience across publicly traded and privately held international organizations. Most recently, Mr. Ingianni served as Vice President, Global Controller and Chief Accounting Officer at Barnes Group Inc. (NYSE:B), a global aerospace and industrial manufacturer which was acquired by Apollo Funds for $3.

    6/29/26 8:00:00 AM ET
    $TACT
    $B
    Computer peripheral equipment
    Technology
    Precious Metals
    Basic Materials

    $NEM
    $B
    $AEM
    $AU
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    Amendment: SEC Form SC 13G/A filed by Newmont Corporation

    SC 13G/A - NEWMONT Corp /DE/ (0001164727) (Subject)

    11/12/24 4:43:51 PM ET
    $NEM
    Precious Metals
    Basic Materials

    Amendment: SEC Form SC 13G/A filed by Newmont Corporation

    SC 13G/A - NEWMONT Corp /DE/ (0001164727) (Subject)

    11/4/24 1:16:52 PM ET
    $NEM
    Precious Metals
    Basic Materials

    SEC Form SC 13D/A filed by Barnes Group Inc. (Amendment)

    SC 13D/A - BARNES GROUP INC (0000009984) (Subject)

    3/7/24 9:15:35 AM ET
    $B
    Precious Metals
    Basic Materials

    $NEM
    $B
    $AEM
    $AU
    Financials

    Live finance-specific insights

    View All

    Barrick Announces Investment in Kingfisher Metals

    TORONTO, July 21, 2026 (GLOBE NEWSWIRE) -- Barrick Mining Corporation (NYSE:B)(TSX:ABX) announced today that it has agreed to subscribe for 15,470,934 units ("Units") of Kingfisher Metals Corp. ("Kingfisher") in a non-brokered private placement ("Private Placement") at a price of C$1.35 per Unit, for total consideration of approximately C$20,885,761. Each Unit is comprised of one common share (each, a "Kingfisher Share") and one-half of a common share purchase warrant, where each whole warrant will entitle the holder for a period of two years to acquire one Kingfisher common share at a price of C$1.70 per common share. Barrick does not currently own any Kingfisher Shares. Following closin

    7/21/26 7:00:00 AM ET
    $B
    Precious Metals
    Basic Materials

    Barrick to Report Second Quarter 2026 Results on August 10

    TORONTO, July 10, 2026 (GLOBE NEWSWIRE) -- Barrick Mining Corporation (NYSE:B)(TSX:ABX) will release its second quarter 2026 results before markets open on Monday, August 10, 2026 at 6:00 AM ET. The management team will host a live webcast and presentation at 11:00 AM ET the same day, followed by a question-and-answer session with analysts. Event Details – August 10, 2026 Results release – 6:00 AM ETLive webcast and presentation – 11:00 AM ET To join the webcast, please register here. Presentation materials will be available on Barrick’s website prior to the event with a replay available soon after. About Barrick Mining Corporation Barrick is a leading global mining, exploration, and

    7/10/26 7:00:00 AM ET
    $B
    Precious Metals
    Basic Materials

    AGNICO EAGLE REPORTS WALL MOVEMENT AT BARNAT OPEN PIT AT CANADIAN MALARTIC

    Stock Symbol: AEM (NYSE and TSX)TORONTO, July 2, 2026 /CNW/ - Agnico Eagle Mines Limited (NYSE: AEM) (TSX:AEM) ("Agnico Eagle" or the "Company") reports that a rock mass movement occurred on July 1, 2026, along the north wall of the Barnat open pit at the Canadian Malartic complex in Quebec, Canada. There were no injuries, equipment damage or environmental impact as a result of the event. As a precautionary measure, the Company has temporarily suspended mining operations in the Barnat open pit.The rock mass movement occurred within an area that had been previously identified as having weaker geological structures within the north wall at Barnat and was subject to enhanced geotechnical monito

    7/2/26 7:47:00 AM ET
    $AEM
    Precious Metals
    Basic Materials