• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    ZenaTech Enters the AI Data Center Construction Market with ZenaWorx, a Drone-based 3D Digital Progress Monitoring Software

    5/28/26 8:00:00 AM ET
    $ZENA
    Computer Software: Prepackaged Software
    Technology
    Get the next $ZENA alert in real time by email

    VANCOUVER, British Columbia, May 28, 2026 (GLOBE NEWSWIRE) -- ZenaTech, Inc. (NASDAQ:ZENA) (FSE: 49Q) (BMV:ZENA) ("ZenaTech"), a technology solution provider specializing in AI (Artificial Intelligence) drone, Drone as a Service (DaaS), enterprise SaaS, and Quantum Computing solutions, announces its entry into the rapidly growing AI data center construction market by commencing the initial development of ZenaWorx, a LiDAR (Light Detection and Ranging)-based VDC (Virtual Design and Construction) progress monitoring software. The software, designed to improve accuracy and costs across the construction lifecycle, will be jointly developed and offered through its Drone as a Service and Enterprise SaaS divisions. ZenaWorx uses drone-captured LiDAR data to create a detailed 3D digital map of a construction site that is used to track ongoing construction progress and identify deviations from planned design. The company has identified a potential beta customer about to begin a several hundred-acre AI data center construction project that it has targeted to use in the development of this service and is currently at the negotiation stage.

    "The AI data center market is experiencing unprecedented expansion as an important growth market for drone-powered surveying, analytics, and construction monitoring solutions," said Shaun Passley, Ph.D., CEO of ZenaTech. "With the development of ZenaWorx we plan to support construction and infrastructure operators with advanced aerial data collection, LiDAR-based 3D analytics, and a scalable subscription-based service designed to improve visibility, efficiency, and cost-effectiveness of project execution throughout the construction lifecycle."

    ZenaWorx is an Enterprise SaaS offering, also intended to be incorporated into Drone as a Service jobs, focused on processing drone and LiDAR-captured data and transforming it into visual, analytics-driven construction progress insights. The software, currently in early-stage development, is intended to support standardized reporting and performance tracking across construction projects, with broader applications expected to be explored over time.

    The offering will use of LiDAR-enabled aerial data capture to monitor construction progress across large-scale sites with high precision. LiDAR drone sensors use laser-based scanning to generate a highly accurate 3D representation of physical environments, allowing project teams to measure terrain, track elevation changes, and compare real-world construction progress against design specifications across the entire construction lifecycle.

    The North American AI data center market is growing at 30% CAGR until 2030 according to Mordor Intelligence while the sector is experiencing a global infrastructure investment super cycle according to JLL research. This expansion is being driven by accelerating demand for AI computer infrastructure and hyperscale cloud deployment. Within this environment, large-scale AI data center construction projects typically require 12 to 36 months to complete, involving significant earthworks, grading, and multi-phase infrastructure coordination.

    VDC progress monitoring, surveying, and digital site intelligence solutions represent an increasingly important enabling layer within the broader data center development ecosystem, supporting improved scheduling accuracy, cost control, and capital efficiency across complex building projects.

    About ZenaTech

    ZenaTech, Inc. (NASDAQ:ZENA) (FSE: 49Q) (BMV:ZENA) is a technology company that specializes in AI autonomy drone platforms to transform industrial, government, and defense sectors. Its subsidiaries include drone manufacturing through ZenaDrone, a global Drone as a Service (DaaS) business, and a separate enterprise SaaS division of multiple software brands. The Company is executing an acquisition-led DaaS roll-up strategy to digitize and automate legacy service industries like land surveys and inspections, driving drone-based scalable, recurring revenue growth. With an operating footprint spanning North America, Europe, the Middle East, and Asia, ZenaTech is advancing AI drones for agriculture and logistics, as well as ISR, cargo, and counter-UAS applications for U.S. defense and NATO allies. The company is investing in next-generation technologies, including drone swarms, quantum computing, and advanced AI autonomy to capture long-term opportunities in key markets through its R&D initiatives

    About ZenaDrone

    ZenaDrone, a wholly owned subsidiary of ZenaTech, develops and manufactures autonomous drone solutions that can incorporate machine learning software, AI, predictive modeling, Quantum Computing, and other software and hardware innovations. Created to revolutionize the hemp farming sector, its specialization has grown to multifunctional drone solutions for surveying, monitoring, inspection, tracking, process automation, and defense applications. Currently, the ZenaDrone 1000 drone is used for crop management applications and critical field cargo applications in the defense sector, the IQ Nano indoor drone is used for inventory management and security in the warehouse and logistics sectors, the IQ Square is an outdoor drone designed for power washing and inspections use in commercial and government sectors, and the IQ Quad is for land surveys.

    Contacts for more information:

    Company, Investors, and Media:

    Linda Montgomery

    ZenaTech

    312-241-1415

    investors@zenatech.com

    Investors:

    Michael Mason

    CORE IR

    investors@zenatech.com

    Safe Harbor

    This press release and related comments by management of ZenaTech, Inc. include "forward-looking statements" within the meaning of U.S. federal securities laws and applicable Canadian securities laws. These forward-looking statements are subject to the safe harbor provisions under the Private Securities Litigation Reform Act of 1995. This forward-looking information relates to future events or future performance of ZenaTech and reflects management's expectations and projections regarding ZenaTech's growth, results of operations, performance, and business prospects and opportunities. Such forward-looking statements reflect management's current beliefs and are based on information currently available to management. In some cases, forward-looking information can be identified by terminology such as "may", "will", "should", "expect", "plan", "anticipate", "aim", "seek", "is/are likely to", "believe", "estimate", "predict", "potential", "continue" or the negative of these terms or other comparable terminology intended to identify forward-looking statements. Forward-looking information in this document includes, but is not limited to ZenaTech's expectations regarding its revenue, expenses, production, operations, costs, cash flows, and future growth; expectations with respect to future production costs and capacity; ZenaTech's ability to deliver products to the market as currently contemplated, including its drone products including ZenaDrone 1000, IQ Square and IQ Nano; ZenaTech's ability to develop products for markets as currently contemplated; ZenaTech's anticipated cash needs and it's needs for additional financing; ZenaTech's intention to grow the business and its operations and execution risk; expectations with respect to future operations and costs; the volatility of stock prices and market conditions in the industries in which ZenaTech operates; political, economic, environmental, tax, security, and other risks associated with operating in emerging markets; regulatory risks; unfavorable publicity or consumer perception; difficulty in forecasting industry trends; the ability to hire key personnel; the competitive conditions of the industry and the competitive and business strategies of ZenaTech; ZenaTech's expected business objectives for the next twelve months; ZenaTech's ability to obtain additional funds through the sale of equity or debt commitments; investment capital and market share; the ability to complete any contemplated acquisitions; changes in the target markets; market uncertainty; ability to access additional capital, including through the listing of its securities in various jurisdictions; management of growth (plans and timing for expansion); patent infringement; litigation; applicable laws, regulations, and any amendments affecting the business of ZenaTech and other related risks ‎‎‎and uncertainties disclosed under the ‎heading "Risk Factors" ‎‎‎‎in the Company's Form F-1, Form 20-F and other filings filed ‎‎‎with the United States Securities and Exchange Commission (the "SEC") on EDGAR through the SEC's website at www.sec.gov. The Company undertakes ‎‎‎no obligation to update forward-‎looking ‎‎‎‎information except as required by applicable law. Such forward-‎‎‎looking information represents ‎‎‎‎‎managements' best judgment based on information currently available. ‎‎‎No forward-looking ‎‎‎‎statement ‎can be guaranteed and actual future results may vary materially. ‎‎‎Accordingly, readers ‎‎‎‎are advised not to ‎place undue reliance on forward-looking statements or ‎‎‎information.‎



    Primary Logo

    Get the next $ZENA alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $ZENA

    DatePrice TargetRatingAnalyst
    6/16/2025$9.00Buy
    Maxim Group
    More analyst ratings

    $ZENA
    SEC Filings

    View All

    SEC Form 6-K filed by ZenaTech Inc.

    6-K - ZenaTech, Inc. (0001997403) (Filer)

    6/3/26 2:20:56 PM ET
    $ZENA
    Computer Software: Prepackaged Software
    Technology

    SEC Form 6-K filed by ZenaTech Inc.

    6-K - ZenaTech, Inc. (0001997403) (Filer)

    6/3/26 8:07:39 AM ET
    $ZENA
    Computer Software: Prepackaged Software
    Technology

    SEC Form 6-K filed by ZenaTech Inc.

    6-K - ZenaTech, Inc. (0001997403) (Filer)

    5/22/26 5:08:27 PM ET
    $ZENA
    Computer Software: Prepackaged Software
    Technology

    $ZENA
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    SEC Form 3 filed by new insider Montgomery Linda

    3 - ZenaTech, Inc. (0001997403) (Issuer)

    4/2/26 12:45:51 PM ET
    $ZENA
    Computer Software: Prepackaged Software
    Technology

    SEC Form 3 filed by new insider Burns Thomas

    3 - ZenaTech, Inc. (0001997403) (Issuer)

    4/2/26 12:38:53 PM ET
    $ZENA
    Computer Software: Prepackaged Software
    Technology

    SEC Form 3 filed by new insider Asif Sajjad

    3 - ZenaTech, Inc. (0001997403) (Issuer)

    3/31/26 4:58:27 PM ET
    $ZENA
    Computer Software: Prepackaged Software
    Technology

    $ZENA
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Drones-as-a-Service Market Surges as AI, Automation, and Industrial Demand Drive Billion-Dollar Growth

    Market forecasts point to multi-billion-dollar expansion as businesses increasingly adopt outsourced drone operations to reduce costs and improve efficiencyNEW YORK, June 3, 2026 /CNW/ -- Market News Updates News Commentary - The concept of Drones as a Service (DaaS) is rapidly gaining momentum within the broader AI, automation, and industrial technology sectors. This trend is driven by businesses seeking cost-effective solutions for drone operations without the need to internally manage fleets. Instead of investing heavily in various aspects like hardware, software, pilots, compliance, and maintenance, companies are turning to subscription and on-demand service models to outsource their dro

    6/3/26 9:20:00 AM ET
    $ONDS
    $QUCY
    $UAVS
    Radio And Television Broadcasting And Communications Equipment
    Technology
    Biotechnology: Pharmaceutical Preparations
    Health Care

    ZenaTech Reports 640% Increase in First Quarter 2026 Revenue Year-over-Year Growth Powered by its Drone Division

    VANCOUVER, British Columbia, June 03, 2026 (GLOBE NEWSWIRE) -- ZenaTech, Inc. (NASDAQ:ZENA) (FSE: 49Q) (BMV:ZENA) ("ZenaTech"), a technology solution provider specializing in AI (Artificial Intelligence) drone, Drone as a Service (DaaS), enterprise SaaS, and Quantum Computing solutions, announces its financial results for the three months ended March 31, 2026. Highlights included revenue of $8.4 million representing a 640% increase from the same period in 2025. All financial figures are reported in Canadian dollars. First Quarter 2026 and Recent Highlights Total revenue of $8.4 million for the first quarter of 2026, an increase of 640% over the prior-year comparable period revenue of $1.

    6/3/26 8:15:00 AM ET
    $ZENA
    Computer Software: Prepackaged Software
    Technology

    ZenaTech Completes its 23rd Drone as a Service Acquisition Expanding Colorado Presence in Southeast Denver Growth Corridor

    VANCOUVER, British Columbia, June 02, 2026 (GLOBE NEWSWIRE) -- ZenaTech, Inc. (NASDAQ:ZENA) (FSE: 49Q) (BMV:ZENA) ("ZenaTech"), a technology solution provider specializing in AI (Artificial Intelligence) drone, Drone as a Service (DaaS), enterprise SaaS, and Quantum Computing solutions, today announces it has closed its 23rd acquisition and second land survey engineering firm in Colorado with the acquisition of High Prairie Survey Company. The acquired company has a longstanding track record serving real estate clients, residential developers, construction companies, and infrastructure clients across the southeastern Denver metropolitan area and growth corridor. As ZenaTech's 23rd acquisit

    6/2/26 7:45:00 AM ET
    $ZENA
    Computer Software: Prepackaged Software
    Technology

    $ZENA
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Maxim Group initiated coverage on ZenaTech with a new price target

    Maxim Group initiated coverage of ZenaTech with a rating of Buy and set a new price target of $9.00

    6/16/25 8:13:15 AM ET
    $ZENA
    Computer Software: Prepackaged Software
    Technology

    $ZENA
    Financials

    Live finance-specific insights

    View All

    ZenaTech Completes Acquisition of NOW Solutions Inc., Expanding its Enterprise SaaS Division with Government and Public Sector Customers and Strengthening Recurring Revenue Growth

    VANCOUVER, British Columbia, April 14, 2026 (GLOBE NEWSWIRE) -- ZenaTech, Inc. (NASDAQ:ZENA) (FSE: 49Q) (BMV:ZENA) ("ZenaTech"), a technology solution provider specializing in AI (Artificial Intelligence) drones, Drone as a Service (DaaS), enterprise SaaS, and Quantum Computing solutions, announces the acquisition of all material assets of NOW Solutions Inc., a Richardson, Texas-based, HR and payroll software company with a long-standing list of customers including schools, hospitals, municipal organizations, and government entities across the U.S. and Canada. The material assets of the Human Resource Management System (HRMS) company, which serves small to mid-market-sized customers with w

    4/14/26 8:15:00 AM ET
    $ZENA
    Computer Software: Prepackaged Software
    Technology

    Defense Sector Turns to Drone-as-a-Service as Military Forces Seek Faster, Smarter Intelligence Solutions

    Growing reliance on real-time intelligence, surveillance, and reconnaissance is accelerating demand for scalable drone service platforms across defense operations worldwideNEW YORK, March 12, 2026 /CNW/ -- Market News Updates News Commentary -  Drones are becoming a much bigger part of modern defense operations, and a growing trend within this space is Drone-as-a-Service (DaaS). Instead of militaries buying, maintaining, and operating every drone themselves, they can now work with specialized providers that supply the drones, pilots, software, and data analytics as a service. This approach allows defense organizations to quickly deploy drone capabilities for missions such as surveillance, re

    3/12/26 9:00:00 AM ET
    $EH
    $ONDS
    $UAVS
    Aerospace
    Industrials
    Radio And Television Broadcasting And Communications Equipment
    Technology

    ZenaTech Closes Acquisition of Vara 3D, a Utah-Based Surveying and Mapping Firm Expanding Drone-as-a-Service to the High-Growth Solar Infrastructure Market

    VANCOUVER, British Columbia, Dec. 23, 2025 (GLOBE NEWSWIRE) -- ZenaTech, Inc. (NASDAQ:ZENA) (FSE: 49Q) (BMV:ZENA) ("ZenaTech"), a technology business solutions company specializing in AI (Artificial Intelligence) drone, Drone as a Service (DaaS), enterprise SaaS, and Quantum Computing solutions, announces the acquisition of Vara 3D Inc., a well established Salt Lake City-area surveying and 3D mapping company. Vara 3D serves clients across Utah with a strong footprint in California's solar energy ecosystem. This acquisition marks the expansion of ZenaTech's Drone as a Service business into the high-growth solar infrastructure market and provides a foundation to expand drone-enabled offering

    12/23/25 8:00:00 AM ET
    $ZENA
    Computer Software: Prepackaged Software
    Technology

    $ZENA
    Leadership Updates

    Live Leadership Updates

    View All

    ZenaTech Opens New Chapter of Growth Through Partnerships — Inviting Founder-Led Companies to Join Its Platform in Defense, Enterprise SaaS and AI Infrastructure

    VANCOUVER, British Columbia, May 26, 2026 (GLOBE NEWSWIRE) -- ZenaTech, Inc. (NASDAQ:ZENA) (FSE: 49Q) (BMV:ZENA) ("ZenaTech"), a technology solution provider specializing in AI (Artificial Intelligence) drone, Drone as a Service (DaaS), enterprise SaaS, and Quantum Computing solutions, announces the next chapter of its growth strategy: a partnership program that invites established, founder-led companies to join the ZenaTech platform and grow alongside it. The acquisition program focuses on profitable, revenue-generating companies across ZenaTech's core verticals — defense technology, enterprise SaaS, and related AI infrastructure. ZenaTech has identified several appropriate companies and

    5/26/26 7:45:00 AM ET
    $ZENA
    Computer Software: Prepackaged Software
    Technology

    Military UAV Sector Forecast to Surpass $40+ Billion as Modern Warfare Evolves

    NEW YORK, Feb. 19, 2026 (GLOBE NEWSWIRE) -- Market News Updates News Commentary - Unmanned aerial vehicles (UAVs), commonly known as drones, have become a transformative technology in modern defense and military operations, reshaping strategies from reconnaissance to precision strike capabilities. Military drones offer armed forces enhanced situational awareness, reduced risk to personnel, and cost-efficient mission profiles across surveillance, target acquisition, logistics, and electronic warfare. As autonomous systems incorporating artificial intelligence and advanced sensor suites continue to mature, they are increasingly integral to networked battlefield operations and force multiplie

    2/19/26 8:30:00 AM ET
    $NOC
    $PRZO
    $UAVS
    Industrial Machinery/Components
    Industrials
    Military/Government/Technical
    Aerospace

    Use of Drones for Land Surveying and Mapping Reaching New Levels Becoming a Billion Dollar Opportunity

    MarketNewsUpdates News Commentary NEW YORK, Sept. 25, 2025 /PRNewswire/ -- Recently huge R&D investments by companies in the global drone surveying market are maximizing the growth of the Global Drone Mapping Market. The influx of funds is enabling them to utilize AI-driven analytics and cloud-based data platforms to enable real-time decision-making. Collaboration between the providers of geospatial data and the manufacturers of drones is unleashing synergies that benefit the end-user. The smart city trend, green energy mapping, and infrastructure digitization are solid growth drivers for industry players.  A report from Fact.MR analysis projected that the Global Drone Market industry will g

    9/25/25 9:15:00 AM ET
    $ONDS
    $RCAT
    $SPAI
    Radio And Television Broadcasting And Communications Equipment
    Technology
    Computer Software: Prepackaged Software
    Industrial Specialties