• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    NexGen's Final Batch of 2025 Assays Return Multiple High-Grade Intercepts

    5/7/26 6:30:00 AM ET
    $NXE
    Other Metals and Minerals
    Basic Materials
    Get the next $NXE alert in real time by email

    Confirming Both Expansion and Continuity of Primary High-Grade Subdomain and Confirmation of New High-Grade Subdomain at Depth

    Highlights:

    • RK-25-239 returns 13.0 m at 5.2% U3O8, including 0.5 m at 30.2% U3O8 confirming expansion of the growing high-grade subdomain 33 m up dip of RK-25-232 (15.0 m at 15.9% U3O8)
    • RK-25-240 returns 10.0 m at 3.95% U3O8, including 0.5 m at 33.3% U3O8 in the down dip portion of the high-grade subdomain 266 m below RK-25-232
    • Assays from RK-25-230 (7.5 m at 5.3% U3O8 including 0.5 m at 35.9% U3O8), RK-25-233 (6.0 m at 2.4% U3O8 including 0.5 m at 23.4% U3O8), RK-25-236 (5.5 m at 2.3% U3O8 including 0.5 m at 13.3% U3O8) confirm continuity of high-grade subdomain; 47 m, 151 m, and 40 m respectively from RK-25-232
    • Confirmed the new high-grade subdomain, at 850 m below surface with RK-25-257 returning 4.5 m at 4.8% U3O8 including 0.5 m at 33.3% U3O8 located 67 m up dip of RK-24-202 (0.5 m at 6.9% U3O8). Confirms significant growth potential.

    Vancouver, British Columbia--(Newsfile Corp. - May 7, 2026) - NexGen Energy Ltd. (TSX:NXE) (NYSE:NXE) (ASX: NXG) ("NexGen" or the "Company") announces the final receipt of 2025 assay results that highlight the expansion and continuity of the high-grade subdomain at the Company's 100% owned Patterson Corridor East (PCE) discovery located 3.5 km from the Arrow Deposit. The expansion of the high-grade subdomain is especially confirmed by RK-25-239 which returned 13.0 m at 5.2% U3O8, including 0.5 m at 30.2% U3O8, at 400 m below surface and RK-25-240 which returned 10.0 m at 3.95% U3O8, including 0.5 m at 33.3% U3O8, at 670 m below surface. Both of these holes share strong similarities with respect to their overall geological characteristics which span across 292 m of mineralized dip extent. (Figures 1-3, Table 1).

    Results from RK-25-240 emphasize the potential extension of mineralization at depth where the system is open. Together with these results, the grades from RK-25-230 (Figure 4), RK-25-233, RK-25-236 have confirmed a strong core zone within the high-grade subdomain which remains open in most directions.

    Within the overall mineralized footprint, a new secondary high-grade subdomain is now confirmed by RK-25-257 (Figures 1 and 5). This hole has several intercepts with the best being 4.5 m at 4.8% U3O8 including 0.5 m at 33.3% U3O8 located 67 m up dip of RK-24-202 (0.5 m at 6.9% U3O8). This new subdomain has high prospectivity for continued growth and is open in most directions.

    Exploration drilling in 2026 has already driven further growth at PCE with the majority of the campaign (29,241.8 m of the planned 42,000 m) scheduled to recommence the week of May 25, 2026 (see news release April 22, 2026). All samples from 2026 drilling to date are submitted to the independent Saskatchewan Research Council Geoanalytical Laboratory (SRC), with results to follow.

    Leigh Curyer, Founder & Chief Executive Officer, commented: "These assay results from 2025 drilling confirm high-grade mineralization and the expanding scale of PCE. The combination of high-grades, continuity, scale and geotechnical characteristics continue to highlight the similarities between PCE and the mighty Arrow Deposit. The opening up of a new high-grade subdomain emphasizes significant growth potential remains at PCE. With the structural supply deficit in the market widening, and the impacts of the industry wide underinvestment in the uranium supply chain for a generation, the urgency of finding and bringing online new, reliable uranium supply has never been greater. As the Rook I Project enters into major construction this summer, we continue to advance PCE to ensure that NexGen optimizes its unparalleled opportunity to become one of the world's most important mining company in delivering energy fuel for the current and future generations."

    Cannot view this image? Visit: https://images.newsfilecorp.com/files/1745/296430_b77e710374b1785f_002.jpg

    Figure 1: Interpreted PCE long section (as of April 22, 2026 release) with notable assays collected since discovery and new results outlined in red; view is a long section that looks perpendicular to the primary mineralized plane; total mineralized footprint in orange and the high-grade subdomains in red

    To view an enhanced version of this graphic, please visit:
    https://images.newsfilecorp.com/files/1745/296430_b77e710374b1785f_002full.jpg

    Cannot view this image? Visit: https://images.newsfilecorp.com/files/1745/296430_b77e710374b1785f_003.jpg

    Figure 2: Core photo of assays from RK-25-239 with grades shown as % U3O8

    To view an enhanced version of this graphic, please visit:
    https://images.newsfilecorp.com/files/1745/296430_b77e710374b1785f_003full.jpg

    Cannot view this image? Visit: https://images.newsfilecorp.com/files/1745/296430_b77e710374b1785f_004.jpg

    Figure 3: Core photo of assays from RK-25-240 with grades shown as % U3O8

    To view an enhanced version of this graphic, please visit:
    https://images.newsfilecorp.com/files/1745/296430_b77e710374b1785f_004full.jpg

    Cannot view this image? Visit: https://images.newsfilecorp.com/files/1745/296430_b77e710374b1785f_005.jpg

    Figure 4: Core photo of assays from RK-25-230 with grades shown as % U3O8

    To view an enhanced version of this graphic, please visit:
    https://images.newsfilecorp.com/files/1745/296430_b77e710374b1785f_005full.jpg

    Cannot view this image? Visit: https://images.newsfilecorp.com/files/1745/296430_b77e710374b1785f_006.jpg

    Figure 5: Core photo of assays from RK-25-257 highlighting the new subdomain with grades shown as % U3O8

    To view an enhanced version of this graphic, please visit:
    https://images.newsfilecorp.com/files/1745/296430_b77e710374b1785f_006full.jpg

    Table 1: Assays received since December 1, 2025 news release

    Drillhole Unconformity Depth (m) SRC Geoanalytical Results
    (Cutoff 0.01%)
    Hole ID Azimuth Dip Total Depth (m) From (m) To (m) Width (m) U3O8 (wt%)
    RK-25-210c1310-70894.0-794794.50.50.01





    801.5803.521.00




    incl.801.5802.511.92





    80480730.04





    81181210.09





    812.58141.50.15





    814.58150.50.03





    817.58180.50.07





    819.5820.510.13





    82182210.48





    824.58250.50.08
    RK-25-210c2310-70909.0-811.5813.520.14





    81481510.13





    816.5817.510.06





    818818.50.50.01





    819819.50.50.03





    821.58253.50.61




    incl.822822.50.52.97





    84184210.05





    852.58530.50.03





    868.58690.50.03





    887.5888.510.01
    RK-25-229350-70681.4113.2570.55721.50.04





    57357410.02





    574.55750.50.01





    576.55792.50.04





    582582.50.50.02





    604604.50.50.03





    606.56081.50.57




    incl.606.56070.51.62





    623623.50.50.15





    636.56370.50.24
    RK-25-230330-70598112.5441.54442.50.20





    446.54492.50.06





    450451.51.50.01





    452.54530.50.02





    456456.50.50.02





    45745920.03





    459.54600.50.02





    462.5463.510.01





    46746810.02





    469469.50.50.02





    471.54720.50.01





    47347410.01





    475490.515.50.25





    492.55007.55.32




    incl.493493.50.535.9




    incl.498.54990.527.4





    511511.50.50.02





    51251310.03





    513.55140.50.03





    517.5519.520.04





    520521.51.50.05





    525526.51.50.02





    532533.51.50.01





    537.5538.510.06





    539.55400.50.05





    588.55890.50.02
    RK-25-233330-70694109.753954010.03





    555.55582.50.02





    558.55590.50.02





    560.5568.580.04





    569570.51.50.02





    57157210.11





    572.55730.50.03





    574.5575.510.02





    57658262.42




    incl.57858026.98




    incl.578.55790.523.4





    582.5589.571.59




    incl.58658824.70





    59059660.08





    602602.50.50.04





    603.5609.560.53




    incl.60460512.35





    624.5625.510.11





    628628.50.50.06





    629.5630.510.04





    633633.50.50.02





    63463620.36




    incl.635.56360.51.04
    RK-25-235270-70858105.5No significant intersections
    RK-25-236267-65541129376.53803.50.04





    380.53821.50.29





    393.53940.50.02





    395397.52.50.07





    40140320.44





    41141430.03





    414.54150.50.03





    425.54260.50.02





    42743030.03





    431431.50.50.01





    433433.50.50.01





    440440.50.50.03





    441.5442.510.01





    445445.50.50.02





    447447.50.50.01





    457.5460.530.07





    461.5462.510.09





    464464.50.50.01





    465470.55.52.34




    incl.467.5468.5110.7




    incl.467.54680.513.3





    475.54771.50.02





    477.54791.50.05





    516517.51.50.02
    RK-25-239278-68594123.4364.53661.50.02





    367.5368.510.02





    390.5392.520.06





    39339740.06





    397.53991.50.06





    400.54010.50.03





    402402.50.50.01





    407410.53.50.41




    incl.407.54080.51.54





    411411.50.50.01





    41441510.08





    416.54170.50.01





    417.5418.510.01





    419420.51.50.04





    421421.50.50.04





    422.54230.50.02





    424.54250.50.01





    426426.50.50.01





    429429.50.50.02





    430431.51.50.03





    433446135.21




    incl.438441.53.514.4




    incl.441441.50.530.2





    44844910.01





    449.5450.510.06





    451452.51.50.15





    454.54550.50.01





    456.54570.50.05





    463.5464.510.01





    466.5467.510.02





    468.54690.50.01





    469.54700.50.02





    471473.52.50.40




    incl.472472.50.51.28





    47647710.02





    478479.51.50.30





    482.54830.50.03





    48448510.04





    486.54881.50.42





    490.5491.514.58





    494.54950.50.01





    497.55002.50.10





    501501.50.50.02





    50250310.02





    503.5504.512.69





    50550610.04





    507.5508.510.78




    incl.508508.50.51.32





    509.55100.50.02





    514.55150.50.08





    51852020.06
    RK-25-240270-70893106.1653.5654.510.02





    659659.50.50.01





    660669.59.50.76




    incl.66466511.99




    incl.665.56660.56.40




    incl.668668.50.52.10





    67067110.40





    671.5672.510.13





    67367411.00





    675679.54.50.27




    incl.675675.50.51.21





    68068330.09





    683.5693.5103.95




    incl.685686132.7





    694.57049.50.08





    705.57071.50.08





    714.57150.50.85





    717.57180.50.07





    718.57190.50.02





    726.57270.50.02





    729.5730.510.03





    732.57341.51.50





    734.5736.520.51





    737742.55.50.37




    incl.738738.50.51.87





    750750.50.50.02





    75275310.06





    75575610.03





    756.57570.50.04





    757.57580.50.01





    76076660.14





    766.5767.510.10





    77477620.30





    776.57770.50.12





    77877910.02





    78078110.73





    798.57990.50.26





    804804.50.50.02
    RK-25-243276-66579126.8365369.54.50.78




    incl.36836913.01





    371373.52.50.08





    374374.50.50.04





    37537610.01





    376.53770.50.11





    382.5383.510.02





    384.5388.540.11





    400.54010.50.01





    402.54030.50.03





    403.54040.50.02





    404.54083.50.04





    40941340.17





    413.5414.510.02





    416420.54.50.07





    42142320.03





    423.54273.50.48




    incl.426426.50.51.43





    427.54280.50.02





    429.54300.50.16





    43243530.05





    435.54371.50.74




    incl.435.54360.52.06





    446.54470.50.03





    452454.52.50.04





    455.54571.50.02





    458.54612.50.02





    471.5474.530.10





    475475.50.50.01





    476.54770.50.03





    480482.52.50.27





    48849130.24





    491.54920.50.02





    503503.50.50.12
    RK-25-247330-70738.0114.4571584.513.50.39




    incl.577.55780.53.20





    581.55820.53.29





    585585.50.50.02





    586590.54.50.05





    591600.59.50.39




    incl.593.5594.511.91





    60160980.13





    610610.50.50.04





    61161210.03





    613.5614.510.03
    RK-25-248283-69501.0123.3339339.50.50.03





    340.5341.510.01





    342342.50.50.03





    343.5344.510.02





    346.53470.50.03





    348348.50.50.02





    350353.53.50.03





    354.53550.50.01





    356.5359.530.04





    360.5361.510.02





    365.53693.50.02





    37137320.02





    37737810.02





    381.53842.50.06





    384.53850.50.06





    385.5386.510.02





    389.53911.50.05





    391.53953.50.02





    395.5397.520.07





    39840570.04





    409410.51.50.03





    411413.52.50.02





    435435.50.50.07





    43643930.02





    440443.53.50.03
    RK-25-249340-70681.0106.1626.56270.50.02





    628629.51.50.07





    630.5631.510.03





    637.5638.510.03





    640.5643.530.42




    incl.641641.50.51.52





    644.56450.50.01





    645.5646.510.05





    64864910.03





    650652.52.50.12





    65365960.12





    661.5662.510.24





    668.5670.520.13





    67267310.03





    673.56740.50.02





    68068110.04
    RK-25-250308-70726.0114.858758920.18





    592593.51.50.32





    59459840.08





    59960670.24





    606.5611.550.07





    61261750.46




    incl.615615.50.53.38





    618624.56.50.68




    incl.619.56200.55.51




    incl.623.56240.51.58





    630630.50.50.03





    637.5638.510.03





    660.56610.50.49





    663663.50.50.68





    665665.50.50.04





    66666710.58





    667.5669.520.08





    670671.51.50.07





    674.56750.50.11





    676676.50.50.04
    RK-25-251302-69576.3119.637737810.02





    379.5383.540.02





    38438950.02





    391.53964.50.29





    404.5411.570.91




    incl.406408.52.52.22





    42042220.02





    439.54400.50.02





    446447.51.50.02





    448448.50.50.02





    451.5452.510.03





    460460.50.50.01





    461461.50.50.33





    464.54650.50.01





    465.54660.50.01





    46846910.03





    469.54711.50.09





    472.54730.50.01





    474.54761.50.01
    RK-25-252275-68663.0120.8515.55160.50.03





    516.55170.50.02





    517.55180.50.01





    528534.56.50.04





    535.55382.50.02





    545556.511.50.31




    incl.553.5554.512.70





    557558.51.50.09





    559.5561.520.07





    563565.52.50.12





    566567.51.50.02





    568569.51.50.03





    570570.50.50.05





    572573.51.50.03





    589589.50.50.19





    59059110.03





    593.55973.50.10





    597.55980.50.02





    598.55990.50.04





    599.56000.50.02





    603606.53.50.11





    608.5609.510.01
    RK-25-254c1275-65564.0N/A 395.53971.50.26





    407407.50.50.02





    40841020.01





    414.54150.50.01





    421.5423.520.04





    434435.51.50.03





    436442.56.50.24





    444445.51.50.03





    447.54480.50.03





    449.5451.520.17





    453454.51.50.04





    45645820.07





    458.54590.50.02





    459.54633.50.05





    464464.50.50.02





    465465.50.50.01





    466466.50.50.01





    468469.51.50.03





    470470.50.50.01





    471.5474.530.05





    475.54760.50.01





    481493.512.50.37




    incl.488.54890.51.07





    490.54910.52.91





    495.5496.510.04





    497497.50.50.05





    498.55012.50.09





    502505.53.50.03
    RK-25-254c2275-65553.5-39439510.05





    39639820.02





    409.5413.540.02





    415.5417.520.01





    420.54210.50.02





    421.54220.50.06





    428.54312.50.01





    437.5438.510.15





    439.54422.50.68




    incl.44044111.17





    442.5443.510.02





    445.54482.50.06





    448.54501.50.12





    451454.53.50.05





    456457.51.50.03





    481.5482.510.05





    48348410.01





    490.54910.50.13





    491.54920.50.02





    492.5493.510.04





    495.54971.50.13
    RK-25-2554-70950.4112.778078330.19





    785.57860.50.05





    787787.50.50.03





    79079110.09





    791.5793.520.05





    794.5798.540.04





    799.58000.50.02





    803.5804.510.02





    805805.50.50.73





    807808.51.51.88




    incl.808808.50.53.56





    829.5830.510.05





    83283530.04





    835.5836.510.02





    838.58390.50.04





    84184210.02





    842.58430.50.01





    844846.52.50.08





    847.5848.510.04





    851.5852.510.24





    886.5887.510.06





    88989010.49
    RK-25-257337-681085.0108.1925925.50.50.12





    938938.50.50.07





    942.59441.52.84




    incl.943943.50.58.46





    946946.50.50.81





    948952.54.54.83




    incl.948948.50.533.3





    95595610.03





    956.5957.510.07





    958.59590.50.06





    959.5966.570.07





    967967.50.50.01





    968.59690.50.05





    992.59985.50.31





    10041008.54.50.11





    1009.51010.510.32





    10121016.54.50.71




    incl.1012.510141.51.94





    10171017.50.51.03





    1026.510303.50.98




    incl.10291029.50.54.95





    1030.51031.512.01





    1032.510341.50.20





    1036103710.13
    RK-25-257c1337-681139.0-964.59661.50.10





    10371037.50.50.03





    1039.51042.530.10





    1044104510.07





    1048.510490.50.01
    RK-25-257c2337-681104.0-997.59980.50.02





    998.59990.50.01





    1000.510010.50.04





    10371037.50.50.04
    RK-25-258278-67249.0117.9No significant intersections
    RK-25-258c1278-67687.0-49950230.11





    503503.50.50.03





    504.55050.50.02





    50750920.08





    518.55190.50.01





    519.55222.50.09





    531.55320.50.01





    534.55350.50.01





    536536.50.50.05





    53754030.06





    543.55440.50.01





    545.5547.520.05





    548.55567.50.47




    incl.552.55541.51.92





    556.55658.50.74




    incl.558.55601.52.74




    incl.560.55610.51.13





    565.55671.51.99




    incl.566566.50.55.91





    570570.50.50.01





    573.55740.50.03





    574.55750.50.05





    628.5630.520.07





    631632.51.50.02





    633634.51.50.15





    637637.50.50.01





    642642.50.50.02
    RK-25-258c2278-67667.0-552.55530.50.04





    571.55753.50.07





    575.558913.50.73




    incl.577579.52.52.22




    incl.580.55810.52.46




    incl.586586.50.51.27





    589.5593.540.06





    594595.51.50.09





    59859910.09





    601601.50.50.07





    602609.57.50.16





    618.5622.540.02





    629629.50.50.10





    630630.50.50.16





    632.56330.50.01
    RK-25-259280-68609.0118.846146650.07





    467.54680.50.01





    47147210.08





    472.5473.510.05





    47447620.20





    49149210.02





    522.5524.520.09





    536.5537.511.03




    incl.537537.50.51.90





    59659710.02
    RK-25-260277-72879.0111.1612612.50.50.03





    614614.50.50.14
    RK-25-261275-70456.0-272283110.04





    28428950.07





    290.52910.50.01





    292293.51.50.02





    299299.50.50.01





    300.53021.50.03





    308308.50.50.01





    311.53120.50.02





    318318.50.50.02





    32132210.01





    322.53329.50.15




    incl.327.53280.51.49





    332.53341.50.16





    34034220.08





    36236310.02
    RK-25-262280-70567.0119.7416417.51.50.01





    425.54260.50.01





    43343740.06





    437.5438.510.02





    440440.50.50.01





    44244310.02





    444444.50.50.01





    452.54530.50.09





    455455.50.50.02





    459459.50.50.02





    460.54610.50.01





    46246310.01





    463.54651.50.15





    465.54671.50.03





    470.54710.50.03





    49049330.07





    493.5495.520.08





    511512.51.50.04
    RK-25-263275-70474.0-308.53090.50.02





    309.53100.50.02





    310.53143.50.05





    314.53150.50.08





    316316.50.50.02





    356.53581.50.03





    35936010.01
    RK-25-264265-70390.0123.9260260.50.50.01





    262.5263.510.01





    264264.50.50.01





    265.52660.50.04
    RK-25-265270-68627.0119.3511.55120.50.02





    512.55130.50.24
    RK-25-266275-67543.0123.0431.5433.520.19
    RK-25-267274-68528.0126.4468468.50.50.09





    470.5471.510.02





    474474.50.50.01





    47547610.01





    47948010.01





    48248310.01





    488.54890.50.01
    RK-25-268280-60429.0135.4245247.52.50.02





    248249.51.50.03





    25025110.06





    251.5252.510.13





    253.5255.520.13





    25625820.07





    258.5259.510.03





    261.5262.510.03





    26326410.05





    272.52730.50.02





    274.52750.50.01





    27627820.03





    285285.50.50.03





    28929010.05





    290.52910.50.02





    291.52920.50.01





    293294.51.50.07





    295.52960.50.02





    299299.50.50.01





    305.53060.50.06
    RK-25-269298-68820.0109.0670.5671.510.03





    701703.52.50.01





    709.57100.50.12





    717.5718.510.11





    72472510.16





    727.57280.50.05





    731.57353.50.50




    incl.731.57320.51.44





    735.57360.50.02





    736.5737.510.06





    73873910.16





    744.5750.560.19





    753753.50.50.05





    757.57613.50.44




    incl.75875911.35





    762764.52.50.12





    76576610.03





    769.57700.50.02





    77177320.17





    773.57740.50.27





    776.5777.510.07
    RK-25-270290-65420.0134.8283283.50.50.07
    RK-25-271275-75744.0115.158758810.03





    59659710.13





    597.55991.50.04





    60060110.04





    610611.51.50.23





    61261640.18





    617.56191.50.09





    62062990.39




    incl.625625.50.52.55




    incl.628628.50.51.22





    629.5632.531.62




    incl.632632.50.53.9





    63363637.01




    incl.634635.51.513.3




    incl.635635.50.513.8





    63763811.84




    incl.637637.50.52.69





    639640.51.51.83




    incl.640640.50.52.71





    64364410.05





    647.5648.510.04





    649652.53.50.12





    65365410.05





    65966010.01





    66466510.29





    675675.50.50.03





    67667710.02





    677.56780.50.03





    681681.50.50.12





    697697.50.50.07





    705.57060.50.03





    723.5724.510.02
    RK-25-272270-70685.1119.450951010.02





    51151320.08





    52152540.13





    525.55260.50.02





    529.55377.50.51




    incl.532.55330.53.07




    incl.535.55360.51.72





    537.5538.510.02





    539.5540.510.05





    541542.51.50.02





    543.5547.540.03





    548554.56.50.42




    incl.550.55510.51.37





    555.55648.50.77




    incl.557.55580.53.81




    incl.563563.50.55.88





    565.55660.50.01





    569.5574.550.28




    incl.571.55720.51.22





    576578.52.50.34





    582.55852.50.05





    585.55871.50.03

     

    • All depths and intervals are meters downhole, true thicknesses are yet to be determined.
    • Unconformity of 'N/A' denotes a lack of visible contact between Athabasca sandstone and basement rock.
    • Maximum internal dilution 2.0 m downhole.
    • Minimum thickness of 0.5 m downhole.
    • Cutoff grade 0.01% U3O8.
    • All depths and intervals are metres downhole, true thicknesses are yet to be determined. Resource modelling in conjunction with an updated mineral resource estimate is required before true thicknesses can be determined.
    • * Denotes results that correlate to high-grade levels of radioactivity (>10,000 cps)

    About NexGen

    NexGen Energy is a Canadian company focused on delivering clean energy fuel for the future. The Company's flagship Rook I Project is being optimally developed into the largest low-cost producing uranium mine globally, incorporating the most elite environmental and social governance standards. The Rook I Project is supported by an N.I. 43-101 compliant Feasibility Study, which outlines the elite environmental performance and industry-leading economics. NexGen is led by a team of experienced uranium and mining industry professionals with expertise across the entire mining life cycle, including exploration, financing, project engineering and construction, operations and closure. NexGen is leveraging its proven experience to deliver a Project that leads the entire mining industry socially, technically and environmentally. The Project and prospective portfolio in northern Saskatchewan will provide generational, long-term economic, environmental, and social benefits for Saskatchewan, Canada, and the world.

    NexGen is listed on the Toronto Stock Exchange, the New York Stock Exchange under the ticker symbol "NXE," and on the Australian Securities Exchange under the ticker symbol "NXG," providing access to global investors to participate in NexGen's mission of solving three major global challenges in decarbonization, energy security and access to power. The Company is headquartered in Vancouver, British Columbia, with its primary operations office in Saskatoon, Saskatchewan.

    Contact Information

    Leigh Curyer
    Chief Executive Officer

    NexGen Energy Ltd.
    +1 604 428 4112
    lcuryer@nxe-energy.ca
    www.nexgenenergy.ca

    Travis McPherson
    Chief Commercial Officer
    NexGen Energy Ltd.
    +1 604 428 4112
    tmcpherson@nxe-energy.ca
    www.nexgenenergy.ca

    Monica Kras
    Vice President, Corporate Development
    NexGen Energy Ltd.
    +44 7307 191933
    mkras@nxe-energy.ca
    www.nexgenenergy.ca

    Technical Disclosure*

    All technical information in this news release has been reviewed and approved by Jason Craven, NexGen's Vice President, Exploration, a qualified person under National Instrument 43-101.

    Natural gamma radiation in drill core reported in this news release was measured in counts per second (cps) using a Radiation Solutions Inc. RS-125 gamma spectrometer. The reader is cautioned that total count gamma readings may not be directly or uniformly related to uranium grades of the rock sample measured; they should be used only as a preliminary indication of the presence of radioactive minerals.

    A technical report in respect of the FS is filed on SEDAR+ (www.sedarplus.ca) and EDGAR (www.sec.gov/edgar.shtml) and is available for review on NexGen Energy's website (www.nexgenenergy.ca).

    Cautionary Note to U.S. Investors

    This news release includes Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in Canada and the Mineral Reserves and the Mineral Resources estimates are made in accordance with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ from the requirements of the Securities and Exchange Commission ("SEC") set by the SEC's rules that are applicable to domestic United States reporting companies. Consequently, Mineral Reserves and Mineral Resources information included in this news release is not comparable to similar information that would generally be disclosed by domestic U.S. reporting companies subject to the reporting and disclosure requirements of the SEC Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.

    Forward-Looking Information

    The information contained herein contains "forward-looking statements" within the meaning of applicable United States securities laws and regulations and "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to mineral reserve and mineral resource estimates, the 2021 Arrow Deposit, Rook I Project and estimates of uranium production, grade and long-term average uranium prices, anticipated effects of completed drill results on the Rook I Project, planned work programs, completion of further site investigations and engineering work to support basic engineering of the project and expected outcomes. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof. Statements relating to "mineral resources" are deemed to be forward-looking information, as they involve the implied assessment that, based on certain estimates and assumptions, the mineral resources described can be profitably produced in the future.

    Forward-looking information and statements are based on the then current expectations, beliefs, assumptions, estimates and forecasts about NexGen's business and the industry and markets in which it operates. Forward-looking information and statements are made based upon numerous assumptions, including among others, that the mineral reserve and resources estimates and the key assumptions and parameters on which such estimates are based are as set out in this news release and the technical report for the property , the results of planned exploration activities are as anticipated, the price and market supply of uranium, the cost of planned exploration activities, that financing will be available if and when needed and on reasonable terms, that third party contractors, equipment, supplies and governmental and other approvals required to conduct NexGen's planned exploration activities will be available on reasonable terms and in a timely manner and that general business and economic conditions will not change in a material adverse manner. Although the assumptions made by the Company in providing forward looking information or making forward looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate in the future.

    Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which may cause actual results, performances and achievements of NexGen to differ materially from any projections of results, performances and achievements of NexGen expressed or implied by such forward-looking information or statements, including, among others, the existence of negative operating cash flow and dependence on third party financing, uncertainty of the availability of additional financing, the risk that pending assay results will not confirm previously announced preliminary results, conclusions of economic valuations, the risk that actual results of exploration activities will be different than anticipated, the cost of labour, equipment or materials will increase more than expected, that the future price of uranium will decline or otherwise not rise to an economic level, the appeal of alternate sources of energy to uranium-produced energy, that the Canadian dollar will strengthen against the U.S. dollar, that mineral resources and reserves are not as estimated, that actual costs or actual results of reclamation activities are greater than expected, that changes in project parameters and plans continue to be refined and may result in increased costs, of unexpected variations in mineral resources and reserves, grade or recovery rates or other risks generally associated with mining, unanticipated delays in obtaining governmental, regulatory or First Nations approvals, risks related to First Nations title and consultation, reliance upon key management and other personnel, deficiencies in the Company's title to its properties, uninsurable risks, failure to manage conflicts of interest, failure to obtain or maintain required permits and licences, risks related to changes in laws, regulations, policy and public perception, as well as those factors or other risks as more fully described in NexGen's Annual Information Form dated March 6, 2024 filed with the securities commissions of all of the provinces of Canada except Quebec and in NexGen's 40-F filed with the United States Securities and Exchange Commission, which are available on SEDAR+ at www.sedarplus.ca and Edgar at www.sec.gov.

    Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or statements or implied by forward-looking information or statements, there may be other factors that cause results not to be as anticipated, estimated or intended. Readers are cautioned not to place undue reliance on forward-looking information or statements due to the inherent uncertainty thereof.

    There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

    Corporate Logo

    To view the source version of this press release, please visit https://www.newsfilecorp.com/release/296430

    Get the next $NXE alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $NXE

    DatePrice TargetRatingAnalyst
    3/5/2026Buy
    UBS
    6/10/2025Buy
    Desjardins
    3/12/2025Buy
    Stifel
    4/1/2024Sector Outperform
    Scotiabank
    4/11/2022Sector Perform → Outperform
    RBC Capital Mkts
    6/23/2021Outperform → Sector Perform
    RBC Capital Mkts
    6/23/2021$6.00Outperform → Sector Perform
    RBC Capital
    More analyst ratings

    $NXE
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    NexGen Files Management Information Circular in Connection with Annual General and Special Meeting of Shareholders

    Vancouver, British Columbia--(Newsfile Corp. - May 21, 2026) - NexGen Energy Ltd.  (TSX:NXE) (NYSE:NXE) (ASX: NXG) ("NexGen" or the "Company") is pleased to announce it has mailed a Notice of Meeting and Management Information Circular to Shareholders of record as of Monday, May 11, 2026 in connection with the Annual General and Special Meeting of the Company to be held on Tuesday, June 30, 2026, at 2:00 p.m. (Pacific Time).Your Vote is Important - Please Vote Today.Shareholders are encouraged to read the meeting materials including the Management Information Circular that provides a detailed analysis of important considerations for voting at the meeting. These materials have been filed on

    5/21/26 4:56:00 PM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    NexGen Announces the Appointment of Ryan Podrasky as Chief Financial Officer

    Vancouver, British Columbia--(Newsfile Corp. - May 20, 2026) - NexGen Energy Ltd. (TSX:NXE) (NYSE:NXE) (ASX: NXG) ("NexGen" or the "Company") is pleased to announce the appointment of Ryan Podrasky as Chief Financial Officer ("CFO"), effective May 25, 2026. Mr. Podrasky succeeds Benjamin ("Ben") Salter, who is stepping down as CFO. Mr. Salter will continue to support the Company in an advisory capacity to ensure a seamless transition.Ryan Podrasky is a CPA-designated finance executive with more than 25 years of leadership across global mining and oil and gas companies. He most recently served as Chief Financial Officer of Elk Valley Resources - formerly the coal business of Teck Resources

    5/20/26 6:30:00 AM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    The U.S. Fuel Cycle Just Became a Strategic Conversation: Aurora Lands as the Largest Indicated Uranium Asset in the Country

    Issued on behalf of Eagle Nuclear Energy Corp. Pre-Feasibility workstream commences at Aurora as enrichment capacity, royalty platforms, and policy infrastructure align around a domestic nuclear fuel supply chain NEW YORK, May 14, 2026 (GLOBE NEWSWIRE) -- American News Group News Commentary — The conversation around the U.S. nuclear fuel cycle has changed character through the first half of 2026. For years, the discussion was largely about the headline reactor fleet — how many reactors the United States was operating, how many new ones it might build, how the regulatory framework around the next deployment cycle would be structured. The fuel cycle itself — the upstream pipeline that prod

    5/14/26 12:30:00 PM ET
    $LEU
    $NUCL
    $NXE
    Mining & Quarrying of Nonmetallic Minerals (No Fuels)
    Industrials
    Other Metals and Minerals
    Basic Materials

    $NXE
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    UBS initiated coverage on NexGen Energy

    UBS initiated coverage of NexGen Energy with a rating of Buy

    3/5/26 8:32:16 AM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    Desjardins initiated coverage on NexGen Energy

    Desjardins initiated coverage of NexGen Energy with a rating of Buy

    6/10/25 8:09:22 AM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    Stifel initiated coverage on NexGen Energy

    Stifel initiated coverage of NexGen Energy with a rating of Buy

    3/12/25 7:51:15 AM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    $NXE
    SEC Filings

    View All

    SEC Form 6-K filed by Nexgen Energy Ltd.

    6-K - NexGen Energy Ltd. (0001698535) (Filer)

    5/21/26 5:20:53 PM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    SEC Form 6-K filed by Nexgen Energy Ltd.

    6-K - NexGen Energy Ltd. (0001698535) (Filer)

    5/21/26 4:41:11 PM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    SEC Form 6-K filed by Nexgen Energy Ltd.

    6-K - NexGen Energy Ltd. (0001698535) (Filer)

    5/20/26 7:00:02 AM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    $NXE
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G filed by Nexgen Energy Ltd.

    SC 13G - NexGen Energy Ltd. (0001698535) (Subject)

    11/14/24 2:24:55 PM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    SEC Form SC 13D/A filed by Nexgen Energy Ltd. (Amendment)

    SC 13D/A - NexGen Energy Ltd. (0001698535) (Subject)

    1/16/24 5:30:24 PM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    SEC Form SC 13D/A filed by Nexgen Energy Ltd. (Amendment)

    SC 13D/A - NexGen Energy Ltd. (0001698535) (Subject)

    9/29/23 6:04:49 AM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    $NXE
    Leadership Updates

    Live Leadership Updates

    View All

    The Uranium Shortage: 78 Gigawatts Under Construction and Not Enough Fuel

    Issued on behalf of Eagle Nuclear Energy Corp.VANCOUVER, BC, April 29, 2026 /CNW/ -- USANewsGroup.com News Commentary — Seventy-eight gigawatts of nuclear reactor capacity are now under construction across 15 countries, according to the International Energy Agency's 2026 Global Energy Review, and global installed nuclear capacity sits at 420 GW[1]. That building spree just got louder: at the Paris Nuclear Energy Summit in March, 38 nations signed on to triple nuclear capacity by 2050, locking in sovereign fuel commitments that tighten the supply picture for years[2]. The capital now rotating into this sector is targeting companies already past the starting line, and five names sit at the fro

    4/29/26 9:05:00 AM ET
    $CCJ
    $DNN
    $NUCL
    Other Metals and Minerals
    Basic Materials

    ATHA ENERGY ANNOUNCES APPOINTMENT OF TROY BOISJOLI AS CHIEF EXECUTIVE OFFICER

    /NOT INTENDED FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES/ VANCOUVER, BC, June 30, 2023 /CNW/ - ATHA Energy Corp. (CSE:SASK) (FRA: X5U) (OTCQB:SASKF) ("ATHA" or the "Company") is pleased to announce that it has appointed Mr. Troy Boisjoli as Chief Executive Officer of the Company to advance ATHA in its next phase of development, effective June 28, 2023. Concurrent with Mr. Boisjoli's appointment, Mike Castanho has resigned as Chief Executive Officer but will continue to serve as an independent director of the Company. The Company thanks Mr. Castanho for his invaluable contributions and looks forward to working with Mr. Boisjoli as Chief Exec

    6/30/23 9:00:00 AM ET
    $CCJ
    $NXE
    Other Metals and Minerals
    Basic Materials

    NexGen Community Update:

    Signs Impact Benefit Agreement with Buffalo River Dene Nation, Signs Mutual Benefit Agreement with Birch Narrows Dene Nation, Appoints Community Based Project Liaison Manager, and The Court of Queen's Bench for Saskatchewan Dismisses MN-S Application, VANCOUVER, BC, July 14, 2021 /PRNewswire/ - NexGen Energy Ltd. ("NexGen" or the "Company") (TSX:NXE) (NYSE:NXE) is pleased to announce the signing of an Impact Benefit Agreement ("IBA") with the Buffalo River Dene Nation ("BRDN"), and the signing of a Mutual Benefit Agreement ("MBA") with the Birch Narrows Dene Nation ("BNDN"), covering all phases of the Rook I Project ("Rook I" or the "Project"), which hosts the 100% owned Arrow uranium depos

    7/14/21 6:30:00 AM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    $NXE
    Financials

    Live finance-specific insights

    View All

    NexGen Files Management Information Circular in Connection with Annual General and Special Meeting of Shareholders

    Vancouver, British Columbia--(Newsfile Corp. - May 21, 2026) - NexGen Energy Ltd.  (TSX:NXE) (NYSE:NXE) (ASX: NXG) ("NexGen" or the "Company") is pleased to announce it has mailed a Notice of Meeting and Management Information Circular to Shareholders of record as of Monday, May 11, 2026 in connection with the Annual General and Special Meeting of the Company to be held on Tuesday, June 30, 2026, at 2:00 p.m. (Pacific Time).Your Vote is Important - Please Vote Today.Shareholders are encouraged to read the meeting materials including the Management Information Circular that provides a detailed analysis of important considerations for voting at the meeting. These materials have been filed on

    5/21/26 4:56:00 PM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    NexGen to Host Q1 2026 Conference Call

    Vancouver, British Columbia--(Newsfile Corp. - May 5, 2026) - NexGen Energy Ltd. (TSX:NXE) (NYSE:NXE) (ASX: NXG) ("NexGen" or the "Company") will host its 2026 first quarter conference call on Thursday, May 7, 2026, at 8:00 am Eastern Time. During the call, NexGen's Founder and Chief Executive Officer, Leigh Curyer, Chief Commercial Officer, Travis McPherson, Chief Financial Officer, Benjamin Salter, and Chris Copley, Project Director will provide an update on the site activities at NexGen's 100% owned Rook I Project (the "Project"). Including the Company's 2025 site infrastructure program, construction preparation, pending major contract announcements, timelines and procurement readiness, f

    5/5/26 6:30:00 AM ET
    $NXE
    Other Metals and Minerals
    Basic Materials

    NexGen to Host Q4 2025 Conference Call

    Vancouver, British Columbia--(Newsfile Corp. - March 2, 2026) - NexGen Energy Ltd. (TSX:NXE) (NYSE:NXE) (ASX: NXG) ("NexGen" or the "Company") is pleased to announce that the Company will host its 2025 fourth quarter conference call on Wednesday, March 4, 2026, at 8:30 am Eastern Standard Time. During the call, NexGen's Founder and Chief Executive Officer, Leigh Curyer, Chief Commercial Officer, Travis McPherson, and Chief Financial Officer, Benjamin Salter, will provide an update on the advancement of its 100% owned Rook I Project (the "Project"). This will include insights into the recent completion of the Canadian Nuclear Safety Commission ("CNSC") hearings, expansion at Patterson Corrido

    3/2/26 7:24:00 AM ET
    $NXE
    Other Metals and Minerals
    Basic Materials