• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Eos Energy Enterprises Announces First Purchase Order Under Frontier Power USA's 2 GWh Capacity Reservation Agreement

    6/18/26 8:30:00 AM ET
    $BESS
    $EOSE
    Electric Utilities: Central
    Utilities
    Industrial Machinery/Components
    Miscellaneous
    Get the next $BESS alert in real time by email

    PITTSBURGH, Pa., June 18, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), America's leading innovator in designing, manufacturing, and providing zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, today announced the first purchase order under the 2 GWh capacity reservation agreement with Frontier Power USA Parent, LLC (FPUSA). The order supports FPUSA's Redbird project, a 100 MW / 400 MWh battery energy storage system using Eos' Z3™ technology.

    Developed by Bimergen, and previously by Bridgelink, for the Electric Reliability Council of Texas (ERCOT) market, the Redbird project was previously approved under a Joint Development Agreement with Eos, with Eos' Z3™ technology selected for deployment. As previously announced, FPUSA and its affiliates have acquired and will provide 100% of the equity for construction of the Redbird project. Bimergen retains a minority economic interest and will collaborate with FPUSA to bring the project into commercial operation.

    "Redbird did not happen overnight. It came from years of working with Bimergen to move projects under active development toward execution," said Nathan Kroeker, Chief Commercial Officer of Eos. "What FPUSA adds is the capital to turn opportunities into operating assets. That is what FPUSA was built to do, and the Redbird conversion is one of the first to prove it out."

    This order reinforces the strength and scalability of the FPUSA model: converting long-standing developer relationships into a high-quality, late-stage pipeline and deploying capital to bring projects that use Eos technology into operation.

    "We developed Redbird to address growing demand for dispatchable storage in ERCOT and selected Eos because Z3™ is purpose-built for the multi-hour applications the market requires," said Cole Johnson, Co-Chief Executive Officer of Bimergen Energy. "Combining proven technology with committed capital converts projects like Redbird into operating assets."

    Designed as a four-hour system, Redbird is expected to provide dispatchable storage capacity in ERCOT, supporting energy shifting, ancillary services, and overall grid reliability. The project meets rising demand for long-duration storage built for safety, reliability, and domestic supply chain strength, and is positioned to serve forecasted load growth and ERCOT market requirements.

    "FPUSA was created to bridge the gap between project development and execution," said Aaron Maczonis, Managing Director, Cerberus Capital Management. "FPUSA is building relationships with leading developers, assembling a portfolio of high-quality projects, and providing access to the capital needed to bring them online."

    As part of the acquisition and purchase order by FPUSA and its affiliates, the Redbird volume will be applied against the 2 GWh firm capacity reservation agreement between FPUSA and Eos. In addition, with this order, the Company has now fulfilled nearly 50% of the 1 GWh Bridgelink master supply agreement (MSA), while further advancing an additional development pipeline of 12 GWh across ERCOT, PJM, CAISO, and MISO.

    About Eos Energy Enterprises

    Eos is accelerating the shift to American energy independence with positively ingenious solutions that transform how the world stores power. The Company's BESS features the innovative Znyth™ technology, a proven chemistry with readily available non-precious earth components, that is the pre-eminent safe, non-flammable, secure, stable, and scalable alternative to conventional technology. The Company's BESS is ideal for utility-scale, microgrid, commercial, and industrial long-duration energy storage applications (i.e., 4 to 16+ hours) and provides customers with significant operational flexibility to cost effectively address current and future increased grid demand and complexity. For more information about Eos (NASDAQ:EOSE), visit eose.com.

    About Frontier Power USA

    FPUSA is a long-duration energy storage development and investment platform organized to accelerate the deployment of utility-scale battery infrastructure across the United States. FPUSA is the first in the long-duration energy storage industry designed to integrate development, committed manufacturing capacity, institutional capital, and insured performance under a single banner, which is expected to allow the conversion of development-stage pipelines into construction-ready assets at speed and scale. This compresses the time from project commitment to commercial operation. For more information visit frontierpowerusa.com.

    About Bimergen Energy Corporation

    Bimergen Energy Corporation (NYSE:BESS) is a U.S.-based renewable energy developer, asset owner and independent power provider focused on utility-scale battery energy storage systems and solar projects. Bimergen develops and operates infrastructure designed to enhance grid stability and support the integration of renewable generation across key U.S. markets, maintaining a diversified pipeline and partnering with institutional capital providers to advance projects through construction and long-term operation. For more information visit Bimergen.com.

    Contacts

    Investors: ir@eose.com

    Media: media@eose.com

    Forward-Looking Statements and Important Information

    Except for the historical information contained herein, the matters set forth in this press release are forward-looking statements within the meaning of the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995. Forward-looking statements include, but are not limited to, statements regarding the Redbird project and its expected capacity, configuration, and grid services; the conversion of the purchase order and the application of the Redbird volume against the 2 GWh firm capacity reservation agreement between Eos and FPUSA; the development, financing, construction, and commissioning of Redbird and other projects; Eos' intent to acquire an equity interest in FPUSA and the timing and conditions of any such acquisition; the size and conversion of the Bridgelink, Bimergen, and broader FPUSA project pipeline into future purchase orders and backlog; the extent to which any purchase orders, capacity reservations, or project pipeline may ultimately result in executed contracts, construction activities, or revenue; and the anticipated benefits of the FPUSA platform and the Company's relationships with developers. The words "anticipate," "believe," "continue," "could," "estimate," "expect," "intends," "may," "might," "plan," "possible," "potential," "predict," "project," "should," "would" and similar expressions may identify forward-looking statements, but the absence of these words does not mean that a statement is not forward-looking. Forward-looking statements are based on our management's beliefs, as well as assumptions made by, and the information currently available to, them. Because such statements are based on expectations as to future financial and operating results and are not statements of fact, actual results may differ materially from those projected.

    Factors which may cause actual results to differ materially from current expectations include, but are not limited to: risks related to the development, financing, construction, and commissioning of the Redbird project and other projects, including timelines and the ability of counterparties to perform; the timing, issuance, and size of future project-level purchase orders and the conversion of framework agreements, capacity reservations, backlog, and pipeline into revenue; risks related to FPUSA, including its ability to source, acquire, finance, and execute projects, and risks related to Eos' intended equity interest in FPUSA and any related-party considerations; risks associated with the credit agreement with Cerberus, including risks of default, dilution of outstanding Common Stock, and contractual lockup of shares; our customers' and project counterparties' ability to secure project financing; changes adversely affecting the business in which we are engaged; our ability to generate cash, service indebtedness, and raise financing in the future; our ability to continue to develop efficient manufacturing processes to scale and to forecast related costs and efficiencies accurately; the amount of final tax credits available pursuant to the Inflation Reduction Act; the timing and availability of future funding under the Department of Energy Loan Facility; competition from existing or new competitors; risks related to legal proceedings or claims; risks associated with evolving energy policies in the United States and the potential costs of regulatory compliance; changes in applicable laws or regulations; our ability to maintain the listing of our shares of common stock on NASDAQ; our ability to grow our business and manage growth profitably and to retain management and key employees; risks related to adverse changes in general economic conditions, including inflationary pressures and increased interest rates; risk from supply chain disruptions and other impacts of geopolitical conflict; and other risks and uncertainties.

    The forward-looking statements contained in this press release are also subject to additional risks, uncertainties, and factors, including those more fully described in the Company's most recent filings with the Securities and Exchange Commission, including the Company's most recent Annual Report on Form 10-K and subsequent reports on Forms 10-Q and 8-K. Further information on potential risks that could affect actual results will be included in the subsequent periodic and current reports and other filings that the Company makes with the Securities and Exchange Commission from time to time. Moreover, the Company operates in a very competitive and rapidly changing environment, and new risks and uncertainties may emerge that could have an impact on the forward-looking statements contained in this press release.

    Forward-looking statements speak only as of the date they are made. Readers are cautioned not to put undue reliance on forward-looking statements, and, except as required by law, the Company assumes no obligation and does not intend to update or revise these forward-looking statements, whether as a result of new information, future events, or otherwise.

    This press release includes information about a proposed series of transactions, including the formation of a joint venture between us and CCM Frontier JV Holdco, LLC, an affiliate of Cerberus Capital Management ("Cerberus"), certain commercial arrangements to be entered into between us and FPUSA, and other related transactions (collectively, the "Proposed Transactions"). We and Cerberus have entered into a binding term sheet with respect to the Proposed Transactions. However, the completion of the Proposed Transactions remains subject to a number of conditions and uncertainties, including the receipt of required third party-approvals, including the approval of the Department of Energy, the negotiations and entry into definitive agreements for the Proposed Transactions and the negotiation of certain terms of the Proposed Transactions. While we currently intend to take the actions within our control to complete the Proposed Transactions on the contemplated terms and timeline, there can be no assurances that the Proposed Transactions will be completed on the contemplated terms or timeline or that the Proposed Transactions will be completed at all.



    Primary Logo

    Get the next $BESS alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $BESS
    $EOSE

    CompanyDatePrice TargetRatingAnalyst
    Eos Energy Enterprises Inc.
    $EOSE
    5/22/2026$11.00Buy
    Needham
    Eos Energy Enterprises Inc.
    $EOSE
    5/14/2026$7.00 → $8.00Hold
    TD Cowen
    Eos Energy Enterprises Inc.
    $EOSE
    2/27/2026$20.00Buy → Neutral
    Guggenheim
    Eos Energy Enterprises Inc.
    $EOSE
    12/17/2025$16.00Neutral
    Analyst
    Eos Energy Enterprises Inc.
    $EOSE
    9/5/2025$6.50Hold
    Jefferies
    Eos Energy Enterprises Inc.
    $EOSE
    8/1/2025$5.50 → $6.00Hold
    TD Cowen
    Eos Energy Enterprises Inc.
    $EOSE
    2/20/2025$4.00 → $5.00Buy → Neutral
    ROTH MKM
    Eos Energy Enterprises Inc.
    $EOSE
    8/21/2024$6.00Buy
    Stifel
    More analyst ratings

    $BESS
    $EOSE
    SEC Filings

    View All

    Eos Energy Enterprises Inc. filed SEC Form 8-K: Submission of Matters to a Vote of Security Holders, Regulation FD Disclosure, Financial Statements and Exhibits

    8-K - Eos Energy Enterprises, Inc. (0001805077) (Filer)

    6/5/26 9:07:13 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    SEC Form 144 filed by Eos Energy Enterprises Inc.

    144 - Eos Energy Enterprises, Inc. (0001805077) (Subject)

    5/28/26 4:31:31 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    SEC Form SD filed by Eos Energy Enterprises Inc.

    SD - Eos Energy Enterprises, Inc. (0001805077) (Filer)

    5/28/26 4:03:28 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $BESS
    $EOSE
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Needham initiated coverage on Eos Energy with a new price target

    Needham initiated coverage of Eos Energy with a rating of Buy and set a new price target of $11.00

    5/22/26 8:37:44 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    TD Cowen reiterated coverage on Eos Energy with a new price target

    TD Cowen reiterated coverage of Eos Energy with a rating of Hold and set a new price target of $8.00 from $7.00 previously

    5/14/26 7:59:24 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy downgraded by Guggenheim with a new price target

    Guggenheim downgraded Eos Energy from Buy to Neutral and set a new price target of $20.00

    2/27/26 8:28:11 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $BESS
    $EOSE
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Independent Fire Testing Confirms Eos Z3 Battery System Exhibited No Thermal Runaway, No Sustained Fire, and No Propagation Under Abuse Testing; Company Receives ISO 14001 Certification

    Energy Safety Response Group testing found no thermal runaway, no sustained fire, and no propagation under direct flame impingement and overcharge abuse, supporting safe siting of long-duration storage in dense urban environments Third-party testing addresses evolving NFPA 855 fire-test expectations and reinforces Eos’ differentiated safety profile PITTSBURGH, June 22, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), America's leading innovator in designing, manufacturing and providing zinc-based long-duration energy storage systems sourced and manufactured in the United States, today announced the results of independent destructive testing of

    6/22/26 8:30:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    A Nasdaq Company Just Reinvented Itself as a Power Company — and Bet It All on the AI Energy Crunch

    Issued on behalf of LIXTE Biotechnology Holdings, Inc. Having entered into definitive documents to combine with NOMAD, LIXTE is set to become NOMAD Power Solutions — a pure-play deployable-power company aimed squarely at the bottleneck throttling the AI boom. And it just put $6.5 million to work before the deal even closes. BOCA RATON, Fla., June 18, 2026 (GLOBE NEWSWIRE) -- World Street Intelligence News Commentary — The most important constraint on the artificial-intelligence boom is no longer the supply of advanced chips. It is something far more old-fashioned: electricity, and the ability to get it to the right place at the right time. Data centers training and running the larges

    6/18/26 11:10:00 AM ET
    $BE
    $EOSE
    $FLNC
    Industrial Machinery/Components
    Energy
    Miscellaneous
    Biotechnology: Pharmaceutical Preparations

    The AI Boom's Real Bottleneck Is Power — and One Nasdaq Company Is Reinventing Itself to Solve It

    Issued on behalf of LIXTE Biotechnology Holdings, Inc. Having entered into definitive documents to combine with NOMAD, LIXTE is set to become NOMAD Power Solutions — a pure-play deployable-power company — and is funding NOMAD with $6.5 million before the deal even closes. BOCA RATON, Fla., June 18, 2026 (GLOBE NEWSWIRE) -- USA News Group News Commentary — Wall Street spent the last two years obsessed with who makes the chips that power artificial intelligence. The smarter money is now asking a more basic question: where will all the electricity come from? AI data centers consume staggering, continuous quantities of power, and the grid that is supposed to feed them cannot expand fast

    6/18/26 9:15:00 AM ET
    $BE
    $EOSE
    $FLNC
    Industrial Machinery/Components
    Energy
    Miscellaneous
    Biotechnology: Pharmaceutical Preparations

    $BESS
    $EOSE
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Director Urban David bought $100,100 worth of shares (16,250 units at $6.16), increasing direct ownership by 35% to 62,471 units (SEC Form 4)

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    3/10/26 8:52:43 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Chief Executive Officer Mastrangelo Joe bought $157,262 worth of shares (23,900 units at $6.58), increasing direct ownership by 2% to 1,487,126 units (SEC Form 4)

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    3/5/26 8:48:21 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Director Dimitrief Alexander bought $90,600 worth of shares (15,000 units at $6.04), increasing direct ownership by 7% to 235,221 units (SEC Form 4)

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    3/4/26 8:56:17 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $BESS
    $EOSE
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Chief Executive Officer Mastrangelo Joe exercised 200,000 shares at a strike of $1.34 and covered exercise/tax liability with 116,646 shares, increasing direct ownership by 6% to 1,570,480 units (SEC Form 4)

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    6/15/26 9:15:32 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    SEC Form 4 filed by Director Bornstein Jeffrey S

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    6/9/26 4:27:00 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    SEC Form 4 filed by Director Nigro Joseph

    4 - Eos Energy Enterprises, Inc. (0001805077) (Issuer)

    6/9/26 4:26:05 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $BESS
    $EOSE
    Financials

    Live finance-specific insights

    View All

    Eos Energy Enterprises Reports First Quarter 2026 Financial Results and Announces Frontier Power USA

    Announced with Cerberus the formation of Frontier Power USA, a stand-alone purpose-built entity to develop, finance, and operate LDES projects to accelerate energy storage deployments Entered into a 2 GWh firm capacity reservation agreement with Frontier Power USA$57.0 million in quarterly revenue with the last two quarters surpassing full year 2025 revenue Achieved record quarterly production performance for shipments, battery output, and bipolar manufacturing Completed Factory Acceptance Testing for its second battery line with installation and power-on at the Thorn Hill facility underway; initial production is on schedule and expected to begin by the end of the second quarter Surpassed 6.

    5/13/26 6:34:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Announces Date for First Quarter 2026 Financial Results and Conference Call; Announces Participation at Upcoming Investor Conferences

    EDISON, N.J., April 23, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), an American energy company and the leading innovator in designing, sourcing, manufacturing, and providing zinc-based battery energy storage systems (BESS) manufactured in the United States, today announced it will release its first quarter 2026 financial results before the U.S. market opens on May 13, 2026. A conference call to discuss its results will take place the same morning at 8:30 a.m. Eastern Time. Eos partners with Say Technologies to allow retail and institutional shareholders to submit and vote on questions ahead of the earnings call. A selection of key question

    4/23/26 4:30:00 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Announces Date for Fourth Quarter and Full Year 2025 Financial Results and Conference Call

    EDISON, N.J., Feb. 11, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), an American energy company and the leading innovator in designing, sourcing, manufacturing, and providing zinc-based battery energy storage systems (BESS) manufactured in the United States, today announced it will release its fourth quarter and full year 2025 financial results before the U.S. market opens on February 26, 2026. A conference call to discuss its results will take place the same morning at 8:30 a.m. Eastern Time. Eos partners with Say Technologies to allow retail and institutional shareholders to submit and vote on questions ahead of the earnings call. A select

    2/11/26 4:30:00 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $BESS
    $EOSE
    Leadership Updates

    Live Leadership Updates

    View All

    Eos Energy Stockholders Approve All Proposals at 2026 Annual Meeting

    EDISON, N.J., June 05, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE), America's leading innovator in designing, manufacturing, and providing zinc-based long duration energy storage (LDES) systems sourced and manufactured in the United States, today announced that stockholders approved all five proposals presented at the Company's 2026 Annual Stockholders' Meeting held on June 3, 2026. Stockholders representing approximately 77.6% of the Company's outstanding shares (or 263,431,701 shares) participated and demonstrated strong support for the Company's proposals, including the election of Jeff Bornstein, Claude Demby, and Nathaniel Fick for three-year terms on the Boar

    6/5/26 9:00:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Appoints Alessandro Lagi as Chief Financial Officer to Advance American Storage Infrastructure at Scale

    PITTSBURGH, April 30, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), an American energy company and the leading innovator in designing, sourcing, manufacturing, and providing zinc-based battery energy storage systems (BESS), today announced the appointment of Alessandro Lagi as Chief Financial Officer, effective June 8, 2026. Lagi joins Eos from Johnson Controls, where he most recently led the Global FP&A and Growth finance team, overseeing planning, commercial, service, and system finance while helping drive stronger earnings performance, cash generation, operational accountability and enterprise transformation. "Alessandro has spent 25 yea

    4/30/26 8:30:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Eos Energy Enterprises Appoints Nathaniel Fick to Board of Directors

    PITTSBURGH, March 26, 2026 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ:EOSE) ("Eos" or the "Company"), an American energy company and the leading innovator in designing, sourcing, manufacturing, and providing zinc-based battery energy storage systems (BESS), today announced the appointment of Nathaniel (Nate) Fick to its Board of Directors as an independent Common Class III director, effective March 24, 2026. Fick brings extensive leadership experience spanning national security, technology, cybersecurity, artificial intelligence (AI), and complex infrastructure—capabilities increasingly relevant as energy storage becomes embedded in critical grid operations. Fick currently

    3/26/26 8:45:00 AM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    $BESS
    $EOSE
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    Amendment: SEC Form SC 13D/A filed by Eos Energy Enterprises Inc.

    SC 13D/A - Eos Energy Enterprises, Inc. (0001805077) (Subject)

    12/17/24 2:48:02 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Amendment: SEC Form SC 13D/A filed by Eos Energy Enterprises Inc.

    SC 13D/A - Eos Energy Enterprises, Inc. (0001805077) (Subject)

    11/4/24 4:56:35 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous

    Amendment: SEC Form SC 13D/A filed by Eos Energy Enterprises Inc.

    SC 13D/A - Eos Energy Enterprises, Inc. (0001805077) (Subject)

    9/12/24 5:14:58 PM ET
    $EOSE
    Industrial Machinery/Components
    Miscellaneous